single line diagram 3 · 2018. 6. 26. · single line diagram, general notes, legend single line...
Post on 24-Jul-2021
59 Views
Preview:
TRANSCRIPT
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD
63
(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 9-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593
TIN No.: 132-466-222
E-141
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD (REVISED 3-24-57)
ELECTRICAL RISER DIAGRAM,FLOURESCENT LIGHT FIXTURE MOUNTING DETAIL,SINGLE LINE DIAGRAM, GENERAL NOTES, LEGEND
SINGLE LINE DIAGRAMNOT TO SCALE
3E-1
ELECTRICAL RISER DIAGRAMNOT TO SCALE
1E-1
FLUORESCENT LIGHTFIXTURE MOUNTING DETAILNOT TO SCALE
2E-1
2
1
2
1
3
5
2
4
1
3
5
2
4
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD
63
(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 9-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL V. PANISELECTRICAL DESIGNPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593
TIN No.: 132-466-222
E-242
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD
LOAD SCHEDULE
LOAD SCHEDULE
(REVISED 3-24-17)
√
RECOMMENDED SIZE OF TRANSFORMER
SHORT CIRCUIT CALCULATION
POWER LAYOUT
TYP. 2ND & 3RD FLOOR POWER LAYOUTSCALE 1:100M.
2E-3
GROUND FLOOR POWER LAYOUT1E-3 SCALE 1:100M.
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD
63
(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 9-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593
TIN No.: 132-466-222
E-343
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD (REVISED 3-24-17)
B
F
B
F
LPA
M
5000
4500 4500 4500 4500 45004500
37000
7000
3850
2500
3150
3600
1200
SHE
2500
9500
HE
PWD
50009000 9000
1
9000
10 11 12 135432
A
B
C
LANDINGCLASSROOM 1 CLASSROOM 2 CLASSROOM 5
UPUP
1700
1600
PWD
1400
1750
3150
3850
UP
LANDING
UP
1400
1750
3600
1200
1700
STO.
1825975 1100 1100
425
1825 1400 1775
400
8600
425
4500 4500 4500 4500 45004500
37000
2500
9500
50009000 9000
1
9000
10 11 12 135432
A
B
C
HESHE
STO.
5000
CLASSROOM 6 CLASSROOM 7 CLASSROOM 10
DN
LANDING
12001125
425
1125 2100 1237
425
7000
3850
2500
3150
1400
1750
1400
1750
3150
3850
DN
LANDING
1125 1238
UP UPUP
LPA10
LPA9
FACPLPAATS
MDP
FPPFPP
FPP4
FPP3
MDP7
LIGHTING LAYOUT
TYP. 2ND & 3RD FLOOR LIGHTING LAYOUTSCALE 1:100M.
2E-4
GROUND FLOOR LIGHTING LAYOUTSCALE 1:100M.
1E-4
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD
63
(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 9-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593
TIN No.: 132-466-222
E-444
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD (REVISED 3-24-17)
WF WF
b
b
b
b
a
a
c
c
a
a
c
c
2 2 2 2 2 2
222222
11 1 1 111
WF
b
b
a
a
c
c
2 2 2
222
SFCSFC SFC
WFWFWF
WF WF
b
b
b
b
a
a
c
c
a
a
c
c
2 2 2 2 2 2
222222
1
11 1 1 111
WF
b
b
a
a
c
c
2 2 2
222
SFCSFC SFC
WFWFWF
LPA3
d
5000
4500 4500 4500 4500 45004500
37000
7000
3850
2500
3150
3600
1200
SHE
2500
9500
HE
PWD
50009000 9000
1
9000
10 11 12 135432
A
B
C
LANDINGCLASSROOM 1 CLASSROOM 2 CLASSROOM 5
UPUP
1700
1600
PWD
1400
1750
3150
3850
UP
LANDING
UP
1400
1750
3600
1200
1700
STO.
1825975 1100 1100
425
1825 1400 1775
400
8600
425
4500 4500 4500 4500 45004500
37000
2500
9500
50009000 9000
1
9000
10 11 12 135432
A
B
C
HESHE
STO.
5000
CLASSROOM 6 CLASSROOM 7 CLASSROOM 10
DN
LANDING
12001125
425
1125 2100 1237
425
7000
3850
2500
3150
1400
1750
1400
1750
3150
3850
DN
LANDING
1125 1238
UP UPUP
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD
63
(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 12-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593
TIN No.: 132-466-222
E-145
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD (REVISED 3-24-17)
ELECTRICAL RISER DIAGRAM,FLOURESCENT LIGHT FIXTURE MOUNTING DETAIL,SINGLE LINE DIAGRAM, GENERAL NOTES, LEGEND
SINGLE LINE DIAGRAMNOT TO SCALE
3E-1
ELECTRICAL RISER DIAGRAMNOT TO SCALE
1E-1
FLUORESCENT LIGHTFIXTURE MOUNTING DETAILNOT TO SCALE
2E-1
2
1
2
1
3
5
2
4
1
3
5
2
4
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD
63
(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 12-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593
TIN No.: 132-466-222
E-246
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD (REVISED 3-24-17)
LOAD SCHEDULE
LOAD SCHEDULE
RECOMMENDED SIZE OF TRANSFORMER
SHORT CIRCUIT CALCULATION
POWER LAYOUT
GROUND FLOOR POWER LAYOUTSCALE 1:100 M.
1E-3
TYP. 2ND & 3RD FLOOR POWER LAYOUTSCALE 1:100 M.
2E-3
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD
63
(SEE COVER SHEET) (SEE COVER SHEET)STANDARD THREE-STOREY
SCHOOL BUILDING( 12-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PBLO G. RACINESMANAGING PARTNER
MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593
TIN No.: 132-466-222
E-347
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD (REVISED 3-24-17)
LPA6
LPA7
F F
LPB6
LPB7
F F
LPC6
LPC7
M
B B
4500 4500 4500 4500 4500 4500 45004500
46000
2500
9500
50009000 9000
1
9000 9000
8 9 10 11 12 135432
A
B
C
HESHE
STO.
5000
CLASSROOM 6 CLASSROOM 7 CLASSROOM 9 CLASSROOM 10
DN
LANDING
12001125
425
1125 2100 1237
425
7000
3850
2500
3150
1400
1750
1400
1750
3150
3850
DN
LANDING
1125 1238
UP UPUPUPUP
5000
4500 4500 4500 4500 4500 4500 45004500
46000
7000
3850
2500
3150
3600
1200
SHE
2500
9500
HE
PWD
50009000 9000
1
9000 9000
8 9 10 11 12 135432
A
B
C
LANDINGCLASSROOM 1 CLASSROOM 2 CLASSROOM 4 CLASSROOM 5
UPUP
1700
1600
PWD1400
1750
3150
3850
UP
LANDING
UP
1400
1750
3600
1200
1700
1825975 1100 1100
425
1825 1400 1775
425
400
8600
550
2500
LPA12
LPA11
FPP
FPP4
FPP3
MDP7
LIGHTING LAYOUT
GROUND FLOOR LIGHTING LAYOUTSCALE 1:100 M.
1E-4
TYP. 2ND & 3RD FLOORLIGHTING LAYOUTSCALE 1:100 M.
2E-4
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD
63
(SEE COVER SHEET) (SEE COVER SHEET)STANDARD THREE-STOREY
SCHOOL BUILDING( 12-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593
TIN No.: 132-466-222
E-448
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD (REVISED 3-24-17)
WF
WF
WF
WF
WF
WF
WF
WF
b
b
b
b
b
b
b
b
b a b a b a b a b
4LPA
5LPA
a
a
c
cLPA
1LPA
2
a
a
c
c
a
a
c
c
a
a
c
c2
2
2
2 2
2 2
2 2 2 2 2
2222
3LPA
1
2
2 2
2
2
2
2
2
1 1 1 1 1 1 1 1
a1
1
1
1
1
1
1
WF
WF
4LPC
WF
WF
WF
WF
WF
WF
a
a
b
b
c
c
b
b
b
b
b
b
a
LPC1
LPC2
5LPC
b a b a b a b a
a
a
c
c
a
a
c
c
a
a
c
c
1 1 1 1 1 1 1 1 1 1
2
2 2
2 2
2 2 2
22 2
2 2 2 2 2 2 2
222222
b
1
1
11
3LPC
11
11
LPB1
3LPB
4LPB
LPB2
5LPB
c
4500 4500 4500 4500 4500 4500 45004500
46000
2500
9500
50009000 9000
1
9000 9000
8 9 10 11 12 135432
A
B
C
HESHE
STO.
5000
CLASSROOM 6 CLASSROOM 7 CLASSROOM 9 CLASSROOM 10
DN
LANDING
12001125
425
1125 2100 1237
425
7000
3850
2500
3150
1400
1750
1400
1750
3150
3850
DN
LANDING
1125 1238
UP UPUPUPUP
5000
4500 4500 4500 4500 4500 4500 45004500
46000
7000
3850
2500
3150
3600
1200
SHE
2500
9500
HE
PWD
50009000 9000
1
9000 9000
8 9 10 11 12 135432
A
B
C
LANDINGCLASSROOM 1 CLASSROOM 2 CLASSROOM 4 CLASSROOM 5
UPUP
1700
1600
PWD1400
1750
3150
3850
UP
LANDING
UP
1400
1750
3600
1200
1700
1825975 1100 1100
425
1825 1400 1775
425
400
8600
550
2500
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD
63
(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 15-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593
TIN No.: 132-466-222
E-149
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD (REVISED 3-24-17)
ELECTRICAL RISER DIAGRAM,FLOURESCENT LIGHT FIXTURE MOUNTING DETAIL,SINGLE LINE DIAGRAM, GENERAL NOTES, LEGEND
SINGLE LINE DIAGRAMNOT TO SCALE
3E-1
ELECTRICAL RISER DIAGRAMNOT TO SCALE
1E-1
FLUORESCENT LIGHTFIXTURE MOUNTING DETAILNOT TO SCALE
2E-1
2
1
2
1
3
5
2
4
1
3
5
2
4
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD
63
(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 15-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593
TIN No.: 132-466-222
E-250
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD (REVISED 3-24-17)
LOAD SCHEDULE
LOAD SCHEDULE
√
RECOMMENDED SIZE OF TRANSFORMER
SHORT CIRCUIT CALCULATION
POWER LAYOUT
GROUND FLOOR POWER LAYOUTSCALE 1:100 M.
1E-3
TYP. 2ND & 3RD FLOOR POWER LAYOUTSCALE 1:100 M.
2E-3
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD
63
(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 15-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593
TIN No.: 132-466-222
E-351
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD (REVISED 3-24-17)
4500 4500 4500 4500 4500 4500 4500 4500 45004500
55000
2500
9500
50009000 9000
1
9000 9000 9000
6 7 8 9 10 11 12 135432
A
B
C
HESHE
STO.
5000
CLASSROOM 6 CLASSROOM 7 CLASSROOM 8 CLASSROOM 9 CLASSROOM 10
DN
LANDING
12001125
425
1125 2100 1237
425
7000
3850
2500
3150
1400
1750
1400
1750
3150
3850
DN
LANDING
1125 1238
UPUP
3950 (TYPICAL)
675
UPUP
5000
4500 4500 4500 4500 4500 4500 4500 4500 45004500
55000
7000
3850
2500
3150
3600
1200
SHE
2500
9500
HE
PWD
50009000 9000
1
9000 9000 9000
6 7 8 9 10 11 12 135432
A
B
C
LANDINGCLASSROOM 1 CLASSROOM 2 CLASSROOM 3 CLASSROOM 4 CLASSROOM 5
UPUP
1700
1600
PWD1400
1750
3150
3850
UP
LANDING
UP
1400
1750
3600
1200
1700
1825975 1100 1100
425
1825 1400 1775
5300
4300
8600
4300
400
425
LPA12
LPA11
FPP
FPP4
FPP3
MDP7
LIGHTING LAYOUT
GROUND FLOOR LIGHTING LAYOUTSCALE 1:100 M.
1E-4
TYP. 2ND & 3RD FLOOR LIGHTING LAYOUTSCALE 1:100 M.
2E-4
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD
63
(SEE COVER SHEET) (SEE COVER SHEET)STANDARD THREE-STOREY
SCHOOL BUILDING( 15-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL V. PANISELECTRICAL ENGINEERPOSITION: PRO. ELECTRICAL ENGINEERPRC No.: 01210PTR No.: 4856593
TIN No.: 132-466-222
E-452
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD (REVISED 3-24-17)
4500 4500 4500 4500 4500 4500 4500 4500 45004500
55000
2500
9500
50009000 9000
1
9000 9000 9000
6 7 8 9 10 11 12 135432
A
B
C
HESHE
STO.
5000
CLASSROOM 6 CLASSROOM 7 CLASSROOM 8 CLASSROOM 9 CLASSROOM 10
DN
LANDING
12001125
425
1125 2100 1237
425
7000
3850
2500
3150
1400
1750
1400
1750
3150
3850
DN
LANDING
1125 1238
UPUP
3950 (TYPICAL)
675
UPUP
5000
4500 4500 4500 4500 4500 4500 4500 4500 45004500
55000
7000
3850
2500
3150
3600
1200
SHE
2500
9500
HE
PWD
50009000 9000
1
9000 9000 9000
6 7 8 9 10 11 12 135432
A
B
C
LANDINGCLASSROOM 1 CLASSROOM 2 CLASSROOM 3 CLASSROOM 4 CLASSROOM 5
UPUP
1700
1600
PWD1400
1750
3150
3850
UP
LANDING
UP
1400
1750
3600
1200
1700
1825975 1100 1100
425
1825 1400 1775
5300
4300
8600
4300
400
425
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD
63
(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 15-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
ARMAN U. CUEVASARCHITECTURAL DESIGNPOSITION: ARCHITECTPRC No.: 0018676PTR No.: 8941423
TIN No.: 907-359-364
G-11
BILL OF QUANTITIES
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD (REVISED 3-24-17)
I.
FIFTEEN-CLASSROOMS
Mobilization / Demobilization
A.
II. Temporary Facilities
III. Safety and Health
IV. Earthworks
V. Termite Control Works
VI. Concrete Works
VII. Masonry Works
B I L L O F Q U A N T I T I E S
VIII. Fabricated Materials and Hardwares
³
³
³
³
³
³
³
³
³
³
³
³
³
³
³
³
²
²
²
²
²
²
²
³
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
ARMAN U. CUEVASARCHITECTURAL DESIGNPOSITION: ARCHITECTPRC No.: 0018676PTR No.: 8941423
TIN No.: 907-359-364
G-22
BILL OF QUANTITIES
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD
PABLO G. RACINESMANAGING PARTNER
STANDARD THREE-STOREYSCHOOL BUILDING( 15-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
63
IX. Finishing Works
X. Carpentry Works
XI. Roof and Framing Works
XII. Painting Works
B I L L O F Q U A N T I T I E S
XIII. Electrical Works
XIV. Plumbing / Sanitary Works
XV.
Mechanical Works
²
²
²
²
²
²
²
²
²
²
²
²
²
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
ARMAN U. CUEVASARCHITECTURAL DESIGNPOSITION: ARCHITECTPRC No.: 0018676PTR No.: 8941423
TIN No.: 907-359-364
G-33
BILL OF QUANTITIES
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD
PABLO G. RACINESMANAGING PARTNER
STANDARD THREE-STOREYSCHOOL BUILDING( 12-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
63
I.
TWELVE-CLASSROOMS
Mobilization / Demobilization
A.
II. Temporary Facilities
III. Safety and Health
IV. Earthworks
V. Termite Control Works
VI. Concrete Works
VII. Masonry Works
B I L L O F Q U A N T I T I E S
VIII. Fabricated Materials and Hardwares
³
³
³
³
³
³
³
³
³
³
³
³
³
³
³
³
²
²
²
²
²
²
²
³
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
ARMAN U. CUEVASARCHITECTURAL DESIGNPOSITION: ARCHITECTPRC No.: 0018676PTR No.: 8941423
TIN No.: 907-359-364
G-44
BILL OF QUANTITIES
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD
PABLO G. RACINESMANAGING PARTNER
STANDARD THREE-STOREYSCHOOL BUILDING( 12-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
63
IX. Finishing Works
X. Carpentry Works
XI. Roof and Framing Works
XII. Painting Works
B I L L O F Q U A N T I T I E S
XIII. Electrical Works
XIV. Plumbing / Sanitary Works
XV. Mechanical Works
²
²
²²
²
²
²
²
²
²
²
²
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
ARMAN U. CUEVASARCHITECTURAL DESIGNPOSITION: ARCHITECTPRC No.: 0018676PTR No.: 8941423
TIN No.: 907-359-364
G-55
BILL OF QUANTITIES
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD
PABLO G. RACINESMANAGING PARTNER
STANDARD THREE-STOREYSCHOOL BUILDING( 9-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
63
I.
NINE-CLASSROOMS
Mobilization / Demobilization
A.
II. Temporary Facilities
III. Safety and Health
IV. Earthworks
V. Termite Control Works
VI. Concrete Works
VII. Masonry Works
B I L L O F Q U A N T I T I E S
VIII. Fabricated Materials and Hardwares
³
³
³
³
³
³
³
³
³
³
³
³
³
³
³
²
²
²
²
²
²
²³
³
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
ARMAN U. CUEVASARCHITECTURAL DESIGNPOSITION: ARCHITECTPRC No.: 0018676PTR No.: 8941423
TIN No.: 907-359-364
G-66
BILL OF QUANTITIES
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)RECOMMENDING APPROVAL
CHIEF,JOSEPHINE P. ISTURIS
BUILDINGS DIVISION, BOD
PABLO G. RACINESMANAGING PARTNER
STANDARD THREE-STOREYSCHOOL BUILDING( 9-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
63
IX. Finishing Works
X. Carpentry Works
XI. Roof and Framing Works
XII. Painting Works
B I L L O F Q U A N T I T I E S
XIII. Electrical Works
XIV. Plumbing / Sanitary Works
XV. Mechanical Works
²
²
²
²
²
²
²
²
²
²
²
²
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
RECOMMENDING APPROVAL SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
CHIEF,JOSEPHINE P. ISTURIS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
BUILDINGS DIVISION, BOD
STANDARD THREE-STOREYSCHOOL BUILDING( 9 CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286
TIN No.: 145-553-983
54GROUND FLOOR, SECOND FLOOR & THIRD FLOOR
FIRE PROTECTION PLAN, FIRE PROTECTION DETAIL,TABULATED SPRINKLER HEADS OF THE
AUTOMATIC FIRE SPRINKLER SYSTEM, GENERALNOTES, LEGEND
FP-163
1 6 7 8 95432
A
B
C
STO.
DN DN UPUP
UPUP
UP
1 6 7 8 95432
A
B
C
SHEHE
PWD
LANDING
PWD
FHC
SHEHEPWD
LANDING LANDING
FEFEFE
FHC
UP
DIESELENGINE
JPFP
FHC
FEFEFE
FHC
GROUND FLOOR FIRE PROTECTION PLANSCALE 1:100 M.
1FP-1
FHC
FDC
FE
RN
JPFP
FE
SECOND & THIRD FLOOR FIRE PROTECTION PLANSCALE 1:100 M.
2FP-1
PENDENT SPRINKLER HEAD UPRIGHT SPRINKLER HEAD SIDEWALL SPRINKLER HEAD
DET. OF FIRE DEPT. CONNECTION
FIRE HOSE CABINET DETAIL
FIRE EXTINGUISHER DETAIL
E L E V A T I O N
CLASSROOMCLASSROOM CLASSROOM
CLASSROOMCLASSROOMCLASSROOM
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
RECOMMENDING APPROVAL SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
CHIEF,JOSEPHINE P. ISTURIS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
BUILDINGS DIVISION, BOD
STANDARD THREE-STOREYSCHOOL BUILDING( 9 CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286
TIN No.: 145-553-983
55FIRE PROTECTION DETAIL, SCHEMATIC PIPING
LAYOUT OF FIRE PROTECTION, FIRE HOSE CABINET(FHC) DRY STAND PIPE RISER DIAGRAM CONN.
SCHEDULE OF EQUIPMENT
FP-163
6
INSPECTOR TEST CONNECTION DET.
E³
PIPE HANGER
TWO WAY BRACE PIPE HANGER
ALARM CHECK VALVE SCHEMATIC DIAGRAMFLOOR CONTROL VALVE
DET. OF FLUSHING CONNECTIONPIPE SLEEVEFOUR WAY BRACE
FIRE PROTECTION DETAILNOT TO SCALE
1FP-3
FIRE HOSE CABINET (FHC)DRY STAND PIPE RISER DIAGRAM CONN.
SCHEMATIC PIPING LAYOUT OF FIRE PROTECTION
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
RECOMMENDING APPROVAL SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
CHIEF,JOSEPHINE P. ISTURIS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
BUILDINGS DIVISION, BOD
STANDARD THREE-STOREYSCHOOL BUILDING( 9 CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286
TIN No.: 145-553-983
53PARTIAL GROUND FLOOR (SHOWING LOCATION OF
CISTERN, PARTIAL ROOF PLAN, ELEVATION OFOVERHEAD WATER TANK, ISOMETRIC DIAGRAM OFWATER PUMPING SYSTEM, SCHEMATIC DIAGRAMOF WATER LEVEL CONTROL, LEGEND, SCHEDULE
OF EQUIPMENT
WP-163
8 9
A
B
C
98
A
B
C
PARTIAL GROUND FLOOR(SHOWING LOCATION OF CISTERN)SCALE 1:100 M.
1WP-1
PARTIAL ROOF PLANSCALE 1:100 M.
2WP-1
ELEVATION OF OVERHEAD WATER TANKNOT TO SCALE
3WP-1
500
ISOMETRIC DIAGRAM OFWATER PUMPING SYSTEMNOT TO SCALE
4WP-1
MCMC MCMC MCB
ALT1&2
1P
212
P
345
S 3 S
67 9
8679
8
BH TYPE2 RH RELAY
BW TYPERH RELAY
TOPUMP "1"TO
PUMP "2"
SCHEMATIC DIAGRAM OFWATER LEVEL CONTROLNOT TO SCALE
5WP-1
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
RECOMMENDING APPROVAL SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
CHIEF,JOSEPHINE P. ISTURIS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
BUILDINGS DIVISION, BOD
STANDARD THREE-STOREYSCHOOL BUILDING( 12 CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286
TIN No.: 145-553-983
57FP-1GROUND FLOOR, SECOND FLOOR & THIRD FLOOR
FIRE PROTECTION PLAN 63
1 6 7 8 9 10 115432
A
B
C
STO.
DN DN UPUP
UPUP
UP
1 6 7 8 9 10 115432
A
B
C
SHEHE
PWD
LANDING
PWD
FHC
SHEHEPWD
LANDING LANDING
FEFEFEFE
FHC
UP
DIESELENGINE
JPFP
FHC
FEFEFEFE
GROUND FLOOR FIRE PROTECTION PLANSCALE 1:100 M.
1FP-1
SECOND & THIRD FLOOR FIRE PROTECTION PLANSCALE 1:100 M.
2FP-1
CLASSROOMCLASSROOMCLASSROOMCLASSROOM
CLASSROOM CLASSROOM CLASSROOM CLASSROOM
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
RECOMMENDING APPROVAL SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
CHIEF,JOSEPHINE P. ISTURIS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
BUILDINGS DIVISION, BOD
STANDARD THREE-STOREYSCHOOL BUILDING( 12 CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286
TIN No.: 145-553-983
FIRE PROTECTION DETAIL,SCHEMATIC PIPING LAYOUT OF FIRE PROTECTION,
GENERAL NOTES, LEGEND,TABULATED SPRINKLER HEADS OF THEAUTOMATIC FIRE SPRINKLER SYSTEM
58FP-2
63
FHC
FDC
FE
RN
JPFP
FE
PENDENT SPRINKLER HEAD
SIDEWALL SPRINKLER HEADUPRIGHT SPRINKLER HEAD
1 11
DRY STAND PIPE RISER DIAGRAM CONN.NOT TO SCALE
3FP-2
FIRE HOSE CABINET (FHC)
FIRE EXTINGUISHER DETAIL
E L E V A T I O N
FIRE HOSE CABINET DETAIL
DET. OF FIRE DEPT. CONNECTIONSCHEMATIC PIPINGLAYOUT OF FIRE PROTECTIONNOT TO SCALE
2FP-2
FIRE PROTECTION DETAILNOT TO SCALE
1FP-2
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
RECOMMENDING APPROVAL SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
CHIEF,JOSEPHINE P. ISTURIS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
BUILDINGS DIVISION, BOD
STANDARD THREE-STOREYSCHOOL BUILDING( 12 CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286
TIN No.: 145-553-983
59FP-3FIRE PROTECTION DETAIL,
SCHEDULE OF EQUIPMENT 63
E³
FLOOR CONTROL VALVEALARM CHECK VALVE SCHEMATIC DIAGRAM
TWO WAY BRACE PIPE HANGER
PIPE HANGER
DET. OF FLUSHING CONNECTION
INSPECTOR TEST CONNECTION DET.
PIPE SLEEVEFOUR WAY BRACE
FIRE PROTECTION DETAILNOT TO SCALE
1FP-3
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
RECOMMENDING APPROVAL SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
CHIEF,JOSEPHINE P. ISTURIS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
BUILDINGS DIVISION, BOD
STANDARD THREE-STOREYSCHOOL BUILDING( 12 CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286
TIN No.: 145-553-983
56WP-1
PARTIAL GROUND FLOOR (SHOWING LOCATION OFCISTERN, PARTIAL ROOF PLAN, ELEVATION OF
OVERHEAD WATER TANK, ISOMETRIC DIAGRAM OFWATER PUMPING SYSTEM, SCHEMATIC DIAGRAMOF WATER LEVEL CONTROL, LEGEND, SCHEDULE
OF EQUIPMENT
63
1110
A
B
C
1 2
PARTIAL ROOF PLANSCALE 1:100 M.
2WP-1
10 11
A
B
C
PARTIAL GROUND FLOOR(SHOWING LOCATION OF CISTERN)SCALE 1:100 M.
1WP-1
ELEVATION OF OVERHEAD WATER TANKNOT TO SCALE
3WP-1
GVGV
500
ISOMETRIC DIAGRAM OFWATER PUMPING SYSTEMNOT TO SCALE
4WP-1
MCMC MCMC MCB
ALT1&2
1P
212
P
345
S 3 S
67 9
8679
8
BH TYPE2 RH RELAY
BW TYPERH RELAY
TOPUMP "1"TO
PUMP "2"
SCHEMATIC DIAGRAM OFWATER LEVEL CONTROLNOT TO SCALE
5WP-1
DESIGNATION
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
RECOMMENDING APPROVAL SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
CHIEF,JOSEPHINE P. ISTURIS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286
TIN No.: 145-553-983BUILDINGS DIVISION, BOD
STANDARD THREE-STOREYSCHOOL BUILDING( 15 CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
61GROUND FLOOR, SECOND FLOOR & THIRD FLOORFIRE PROTECTION PLAN FP-1
63
1 6 7 8 9 10 11 12 135432
A
B
C
STO.
DN DN UPUP
UPUP
UP
1 6 7 8 9 10 11 12 135432
A
B
C
SHEHE
PWD
LANDING
PWD
FHC
SHEHEPWD
LANDING LANDING
FHC
FEFEFEFEFE
UP
DIESELENGINE
JPFP
FEFEFEFEFE
GROUND FLOOR FIRE PROTECTION PLANSCALE 1:100 M.
1FP-1
SECOND & THIRD FLOOR FIRE PROTECTION PLANSCALE 1:100 M.
2FP-1
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
CLASSROOMCLASSROOMCLASSROOMCLASSROOMCLASSROOM
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
RECOMMENDING APPROVAL SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
CHIEF,JOSEPHINE P. ISTURIS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286
TIN No.: 145-553-983BUILDINGS DIVISION, BOD
STANDARD THREE-STOREYSCHOOL BUILDING( 15 CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
62FP-2
FIRE PROTECTION DETAIL,SCHEMATIC PIPING LAYOUT OF FIRE PROTECTION,
GENERAL NOTES, LEGEND,TABULATED SPRINKLER HEADS OF THEAUTOMATIC FIRE SPRINKLER SYSTEM
63
FIRE EXTINGUISHER DETAILE L E V A T I O N
FIRE HOSE CABINET DETAIL
PENDENT SPRINKLER HEAD
SIDEWALL SPRINKLER HEAD
DET. OF FIRE DEPT. CONNECTION
UPRIGHT SPRINKLER HEAD
1 13
FHC
FDC
FE
RN
JPFP
FE
FIRE PROTECTION DETAILNOT TO SCALE
1FP-2
SCHEMATIC PIPINGLAYOUT OF FIRE PROTECTIONNOT TO SCALE
2FP-2
DRY STAND PIPE RISER DIAGRAM CONN.NOT TO SCALE
3FP-2
FIRE HOSE CABINET (FHC)
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
RECOMMENDING APPROVAL SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
CHIEF,JOSEPHINE P. ISTURIS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286
TIN No.: 145-553-983BUILDINGS DIVISION, BOD
STANDARD THREE-STOREYSCHOOL BUILDING( 15 CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
63FP-3FIRE PROTECTION DETAIL,
SCHEDULE OF EQUIPMENT 63
E³
FLOOR CONTROL VALVEALARM CHECK VALVE SCHEMATIC DIAGRAM
TWO WAY BRACE PIPE HANGER
PIPE HANGER
DET. OF FLUSHING CONNECTION
INSPECTOR TEST CONNECTION DET.
PIPE SLEEVEFOUR WAY BRACE
FIRE PROTECTION DETAILNOT TO SCALE
1FP-3
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
RECOMMENDING APPROVAL SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET)
CHIEF,JOSEPHINE P. ISTURIS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
MANUEL D. TORRESMECHANICAL DESIGNPOSITION: MECHANICAL ENGINEERPRC No.: 2195PTR No.: 3399286
TIN No.: 145-553-983BUILDINGS DIVISION, BOD
STANDARD THREE-STOREYSCHOOL BUILDING( 15 CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
(REVISED 3-24-17)
60PARTIAL GROUND FLOOR (SHOWING LOCATION OF
CISTERN, PARTIAL ROOF PLAN, ELEVATION OFOVERHEAD WATER TANK, ISOMETRIC DIAGRAM OFWATER PUMPING SYSTEM, SCHEMATIC DIAGRAMOF WATER LEVEL CONTROL, LEGEND, SCHEDULE
OF EQUIPMENT
WP-163
DESIGNATION
MCMC MCMC MCB
ALT1&2
1P
212
P
345
S 3 S
67 9
8679
8
BH TYPE2 RH RELAY
BW TYPERH RELAY
TOPUMP "1"TO
PUMP "2"
12 13
A
B
C
GVGV
1312
A
B
C
1 2
500
PARTIAL GROUND FLOOR(SHOWING LOCATION OF CISTERN)SCALE 1:100 M.
1WP-1
PARTIAL ROOF PLANSCALE 1:100 M.
2WP-1
ELEVATION OF OVERHEAD WATER TANKNOT TO SCALE
3WP-1
SCHEMATIC DIAGRAM OFWATER LEVEL CONTROLNOT TO SCALE
5WP-1
ISOMETRIC DIAGRAM OFWATER PUMPING SYSTEMNOT TO SCALE
4WP-1
SHEET CONTENTS:PROJECT & LOCATION / BARANGAY:APPROVED:(FOR ISSUANCE)
DIRECTOR IV, BODDANTE B. POTANTE
UNDERSECRETARYRAUL C. ASIS
RECOMMENDING APPROVAL SHEET NO.SET NO.
BOD(SEE COVER SHEET) (SEE COVER SHEET) STANDARD THREE-STOREYSCHOOL BUILDING( 15-CLASSROOMS )
(REVISED 3-24-17)
VARIOUS DPWHPROPOSED PROJECTS
CHIEF,JOSEPHINE P. ISTURIS
DESIGNED: SUBMITTED: DESIGN CONCEPT:REVIEWED AS TO
PABLO G. RACINESMANAGING PARTNER
ROMEO C. OCAMPOPLUMBING DESIGNPOSITION: SANITARY ENGINEERPRC No.: 000697PTR No.: 2181627
TIN No.: 131-678-239BUILDINGS DIVISION, BOD
P-134
GEN. NOTES & LEGEND, MISC. DETAILSTYP. SEPTIC TANK DETAIL, SEPTIC TANK DIMENSION
UNDERGROUND WATER TANK DETAILUNDERGROUND WATER TANK CAPACITY
UNDERGROUND WATER TANK DIMENSIONELEVATED WATER TANK DIMENSION
63
1. ALL PLUMBING WORKS TO BE DONE AND SIZES OF PIPESTO BE USED SHALL BE IN ACCORDANCE WITH THE LATESTEDITION OF THE NATIONAL PLUMBING CODE OF THEPHILIPPINES AND LOCAL REGULATIONS AND ORDINANCES.
2. ALL PIPES SHALL BE INSTALLED AS INDICATED IN THEWORKING DRAWINGS. ANY RELOCATION REQUIRED FORPROPER EXECUTION OF OTHER TRADES SHALL BE UPONTHE APPROVAL OF THE SANITARY ENGINEER.
3. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVERSCALED DIMENSIONS.
4. ALL PIPES SHALL BE PROVIDED W/ PROPER HANGER ANDSUPPORT
5. ALL FIXTURES SHALL BE VENTED INDIVIDUALLY ANDWATERLINES SHALL BE VALVE BY GROUP
6. UNLESS OTHERWISE SPECIFIED, ALL PLUMBING FIXTURESSHALL BE PROPERLY VENTED. MAXIMUM DISTANCE OFVENTILATION FROM FIXTURES SHALL BE 1.50 m MEASUREDALONG THE LENGTH OF PIPE.
7. ALL PLUMBING FITTINGS SHALL BE ACCESSIBLE FORMAINTENANCE. PROVIDE MANHOLE IF SUCHINSTALLATIONS ARE INSIDE THE CEILING.
8. ALL CHANGES IN DIRECTIONS SHALL BE MADE BY THEAPPROPRIATE USE OF FORTY FIVE (45) WYE LONG SWEEPQUARTER BEND. ONE EIGHT WHEN THE CHANGE OF FLOWIS FROM HORIZONTAL TO VERTICAL A SINGLE BENDCOMBINATION MAY BE USED ONLY ON VENT PIPE.
9. NO DOUBLE HUB OR DOUBLE TEE BRANCH SHALL BE USEDON HORIZONTAL SOIL OR WASTE LINES.
10. PROVIDE PIPE SLEEVES AT WALL, COLUMNS OR SLAB TOPROTECT FROM BREAKAGE.
11. ALL EXPOSED PIPINGS AND FITTINGS IN THE AREAS SHALLBE CHROME PLATED.
12. THE BRAND AND OTHER DETAILED PLUMBING FIXTURESSHALL BE IN ACCORDANCE WITH THE SCHEDULEFURNISHED BY THE ARCHITECT.
13. GATE VALVE SHALL BE BRONZE BODY, SOLID WEDGETYPE, SCREWED OR FLANGE END.
14. USE POLYPROPYLENE RANDOM,TYPE 3,PN20 FOR ALLWATER PIPING SYSTEM.
15. USE uPVC SANITARY PIPING SYSTEM SERIES 1000 FOR 100Ø AND SMALLER AND GRAVITY SEWER MAIN uPVC PIPINGSYSTEM FOR 150 Ø AND BIGGER.
16. ENGINEER-IN-CHARGE TO VERIFY ACTUAL LOCATION ANDELEVATION OF STREET DRAINAGE, STREET SEWER ANDSTREET WATER MAINS FOR CONNECTION BEFORECONSTRUCTION.
GENERAL NOTES :
PLAN
SECTION
PLAN
SECTION
100x100
125x125
150x150
200x200
50
75
150
100
D F
DIMENSION IN MMPIPESIZE IN
'A'
225.42
225.42
225.42
282.57
SCHEDULE OF DIMENSIONS
5400 L10800 L16200 L
21600 L27000 L
3-STOREY / 3 CLASSROOM3-STOREY / 6 CLASSROOM3-STOREY / 9 CLASSROOM
3-STOREY / 12 CLASSROOM3-STOREY / 15 CLASSROOM
3.30
L W H Lc
2.00 1.50 1.504.80 2.50 1.80 1.80
6.50 2.50 2.00 1.506.60 3.007.00 3.50
2.00 1.802.20 2.00
1350 L2700 L4050 L
5400 L6750 L
2.90
L W H
1.60 1.20
3.00 2.50 1.403.90 2.80 1.504.30
5.00
3.00
3.00
1.70
1.80
PLAN
SECTION
CATCH BASIN DETAILSCALE N T S
1P-1
FLOOR DRAIN DETAILSCALE N T S
2P-1
ROOF DRAIN DETAILSCALE N T S
3P-1
TYPICAL SEPTIC TANK DETAILSCALE N T S
6P-1
SEPTIC TANK DIMENSIONSCALE N T S
7P-1
TYP. UNDERGROUND WATER TANK DETAIL (DOMESTIC)SCALE N T S
8P-1
PLAN SECTION
UNDERGROUND WATER TANK CAPACITY (DOMESTIC)SCALE N T S
9P-1
UNDERGROUND WATER TANK DIMENSION (DOMESTIC)SCALE N T S
10P-1
ELEVATED WATER TANK CAPACITY (DOMESTIC)SCALE N T S
11P-1
3-STOREY / 3 CLASSROOM
3-STOREY / 6 CLASSROOM3-STOREY / 9 CLASSROOM3-STOREY / 12 CLASSROOM
3-STOREY / 15 CLASSROOM
DESIGNATION
CAPACITYDESIGNATION
3-STOREY / 3 CLASSROOM3-STOREY / 6 CLASSROOM
3-STOREY / 9 CLASSROOM3-STOREY / 12 CLASSROOM3-STOREY / 15 CLASSROOM
3-STOREY / 3 CLASSROOM
3-STOREY / 6 CLASSROOM3-STOREY / 9 CLASSROOM3-STOREY / 12 CLASSROOM
3-STOREY / 15 CLASSROOM
50 Ø
50 Ø50 Ø
50 Ø
50 Ø50 Ø50 Ø
50 Ø
65 Ø
65 Ø
CAPACITYDESIGNATION SERVICE PIPE (mm)RISER / DF /
SUPPLY PIPE (mm)
LEGEND:WATER DISTRIBUTION SYSTEM
GV
WATERLINE
FIRELINE
GATE VALVEFV FLOAT VALVE
WSP WET STAND PIPE
DSP DRY STAND PIPE
WASTE, SEWER & VENT SYSTEMSANITARY LINEVENT LINE
FLOOR CLEAN-OUT
SHOWER/FLOOR DRAINFD
FCO
VENT STACKVSSOIL STACKSS
VENT ACROSS CEILINGVACVENT PIPEVP
POLYVINYL CHLORIDEPVCWET PIPEWP
SOIL PIPESPVENT THRU ROOFVTR
SEPTIC TANKST
WASTE, SEWER & VENT SYSTEM
DRAINAGE LINE
DOWNSPOUTDS
CATCH BASINCB
ROOF DRAINRD
PLUMBING FIXTURESLAVATORYLAV
WATER CLOSETWCELEVATED WATER TANKEWT
FHC FIRE HOSE CABINET
CORRIDOR DRAINCD
BI BLACK IRON PIPE
SECTION
PLAN
SECTION
SPOT DETAIL
CLEAN-OUT DETAILSCALE N T S
5P-1
AIR CHAMBER DETAILSCALE N T S
4P-1
AIR CHAMBERAC
PARTICULARS2.40
THICKNESS, T1 MM
LENGTH WIDTH DEPTH
THICKNESS, T2 MMTHICKNESS, T3 MM
TOP SLAB, ALONG LONG SPAN, 12MMØALONG LONG SPAN, 12MMØ
VERTICAL BARS, 12MM
HORIZONTAL BARS 12MM
BOTTOM SLAB, ALONG LONG SPAN, 12MMØALONG LONG SPAN, 12MMØ
150150200200
200
2.903.003.50 3.90 4.00 4.305.00150150
150150 150
200175 150
225
175 175150
150
200175250125 112
200 200175 175
200 225 250 250175 125
200 175 175 175 150 150 150
1.501.60 2.00 2.502.80 3.00150 150 150 150 175 175150 150 150 150 175
200 200 200 175 150 150
200 200 150 150 125 125
1.00 1.201.40 1.501.70 1.80
200 200 200 175 150 150200 200 200 200 175
top related