Shams 1 Concentrated Solar Power Plant Three Years of O&M Experience

5th September 2013 Project commercial operation date (PCOD). On this date the project achieved

Commercial operation and has been generating revenues since then.

Background – Important Dates

31st January 2014 Shams was handed over the plant from the EPC contractor after the latter achieved

the conditions for practical Completion and the Practical Completion Certificate (PCC) was signed.

2016 was the third commercial operational year for the plant.

Climate Challenges

Climate Challenges … continued

High Dust Concentration • Dust results in relatively low DNI. • Dust increases the mirror soiling

rate, decreasing the average reflectivity of the mirrors quicker than in other locations

High Wind Speeds • The vast Rub’ Al Khali desert is a

major source of wind. • Summer months are the windiest

carrying a lot of dust and causing many disturbances in operation

High Temperature • Efficiency of the water/steam

cycle. • Steam condenser design. • Higher parasitic consumption.

Water Scarcity • The main source of water is

desalination, which means high cost of water.

• No rivers, lakes near the plant affecting condenser design.

Main Operation Modes • Normal operation Solar + Fuel

• Solar only operation • Fuel only operation Firm output mode as requested by PPA

Plant Description

HSE Records

0

1

1

8

934

2014

Fatality

Lost time injury

Med. treatment

First Aid case

Anomalies

2015 2016

0

0

1

5

751

0

1

0

5

1030

Production Records

Generation Expectations Exceptionally Achieved

In 2016, we were 9% above the O&M plan (based on TMY) and 2% above the model expectations with

real DNI and 100% availability

Plant Availability

We have exceeded the availability target over the past three years. Moreover, the availability of the

plant has increased.

Maintenance Records

Achieved

Target

2014

2015

2016

88.1 %

96.3% 96.5 % 89.3 %

96.9 %

97.7 %

Maintenance Records … continued

• The solar field is cleaned on average once a week using 5 cleaning trucks and cleaning 6 days a week

only during the night.

• The average cleanliness of the plant is 97% which is above the performance/financial Model reference

of 95%.

Continuously Attracting Visitors

SolarPACES ExCo members

Abu Dhabi Solar Race

UN General Secretary Ban Ki Moon

Denmark Prince and his delegation

Shams in Pictures

Shams in Pictures

Shams in Pictures

Shams in Pictures

Thank you for your attention