Section 21 Rationalisation of Management Plans
Metro MiningAppendix K - Environmental Management Plan
Metro Mining Bauxite Hills Project
Supplementary Report to the Environmental Impact Statement
21-1
21 Rationalisation of Management Plans
Since the EIS was released the plans in the EIS have been revised and consolidated. These changes
are provided in the Table 21-1.
Bauxite Hills Project Supplementary Report to the Environmental Impact Statement
21-2
Table 21-1 Revised plans
Project Aspect Plans Listed in the EIS Consolidated/Updated Plans Discussion
General Management Plans
Construction and Operations Environmental Management Plan Environmental Management Plan
The Environmental Management Plan
addresses the construction, operational and
decommissioning phases of the Project. The
Environmental Management Plan will
manage the overall site and will refer to
specify management and monitoring plans
as per the below.
Construction and Operations
Integrated Risk Management Plan
Integrated Risk Management Plan
The Integrated Risk Management Plan will
be developed prior to construction and will
include: Occupational Health and Safety
Policy; Environmental Policy; operational
hazard analysis; fire safety and emergency;
regular hazard audits; response plans,
qualitative risk assessment and construction
safety.
Risk Management Plan
Construction and Operations Emergency Response Plan Emergency Response Plan
The ERP will be developed in consultation
with the Department of Community Safety,
QFRS, Queensland Police Service and
Queensland Ambulance Service. This Plan
outlines that the Site Senior Executive will
have the resources and facilities for the
mine’s preparedness in reasonably
foreseeable emergencies or potential
emergency situations. The Plan will include
details for making the site safe and ensuring
the safety of personnel during a cyclone or
bushfire event.
Construction and Operations Plan of Operations Plan of Operations
The Plan of Operations is a regulatory
requirement and will set out the proposed
program of actions to comply with EA
conditions, including a program to
rehabilitate any disturbed land.
Bauxite Hills Project Supplementary Report to the Environmental Impact Statement
21-3
Project Aspect Plans Listed in the EIS Consolidated/Updated Plans Discussion
Construction and Operations
Waste Management Plan
Waste Management Plan
The Waste Management Plan confirms the
waste sources, types, quantities and
management measures for the construction,
operation and decommissioning of the
Project
Garbage Management Plan
Construction and Operations Stakeholder Engagement Plan Stakeholder Engagement Plan
The Stakeholder Engagement Plan aims to develop a consultation process that can be integrated into the community with minimal disturbance and provides a foundation for long-term relationships between Metro Mining and the community that is based on trust and mutual respect.
Construction, Operations and
Decommissioning Cultural Heritage Management Plan Cultural Heritage Management Agreement
The Cultural Heritage Management Agreement is an Ancillary Agreement with the Ankamuthi People, Northern Cape York Group #1 and Old Mapoon Aboriginal Corporation. The Agreement covers the protection and management of all Aboriginal Cultural Heritage in the Cultural Heritage Management Agreement area.
Marine Management Plans
Operations and Environmental Marine Pest Monitoring Program
Marine Monitoring Plan Monitoring of sediment and benthic ecosystems. Long-term biannual seagrass monitoring program for the Skardon River
Marine Monitoring Plan
Marine Pest Management Plan
Operations and Environmental
Hydrocarbon and Spill Management Plan
Hydrocarbon and Spill Management Plan
The Hydrocarbon Spill Management Plan
will be developed in consultation with
Maritime Safety Queensland and the RHM
and will meet the Australian Maritime
Safety Authority and Port Authority
requirements. The Plan will include
management and response measures for
terrestrial and marine spills associated with
the Project activities.
Oil Spill Response Plan
Operations Vessel Traffic Management Plan
Marine Traffic Management Plan Vessel Management Plan
Bauxite Hills Project Supplementary Report to the Environmental Impact Statement
21-4
Project Aspect Plans Listed in the EIS Consolidated/Updated Plans Discussion
Marine Traffic Management Plan The Marine Traffic Management Plan sets speed limits, confirmed by the RHM, and will ensure safety of navigation at all times.
Operations Aids to Navigation Management Plan Aids to Navigation Management Plan
The Aids to Navigation Plan includes physical and virtual aids to navigation and vessel traffic services provided by Maritime Safety Queensland’s vessel traffic service centres.
Operations and Environmental Ship-sourced Pollution Prevention Management Plan
Ship-sourced Pollution Prevention Management Plan
The Ship-sourced Pollution Prevention Management Plan will include ballast water, garbage, chemical or toxic waste disposal and sewage.
Operations
Marine Operations Management Plan
Marine Operations Management Plan
The purpose of the Marine Operations Plan is to provide a thorough overview and ensure regulatory compliance associated with the transhipment based out of the Port of Skardon River. This Plan will cover the operational aspects of the entire transhipment operation supply chain from the BLF, to the loading of an OGV.
Marine Execution Plan
Land Management Plans
Construction
Conceptual Erosion and Sediment Control
Plan Erosion and Sediment Control Plan
The Erosion and Sediment Control Plan
nominates erosion and sediment controls
based on a risk management approach and
the construction methodology. Erosion and Sediment Control Plan
Construction Acid Sulfate Soil Management Plan Acid Sulfate Soil Management Plan
The Acid Sulfate Soil Management Plan will
incorporate appropriate aid sulfate soil
management strategies with consideration
of specific construction programs and
methodologies.
Construction and Operations
Fire Management Plan
Land Use Management Plan
The Land Use Management Plan includes
plans and procedures for managing:
Vegetation including buffer systems and
pre-clearing surveys;
Bushfire Management Plan
Pest and Weed Management Plan
Bauxite Hills Project Supplementary Report to the Environmental Impact Statement
21-5
Project Aspect Plans Listed in the EIS Consolidated/Updated Plans Discussion
Vegetation Clearing Plan
Fauna habitat;
Landscape connectivity corridors;
Bushfires in accordance with SPP
requirements for bushfire hazards and
in partnership with Mapoon Land and
Sea Rangers; and
The potential invasion of pests and
weeds.
Construction, Operations and
Decommissioning
Topsoil Management Plan
Rehabilitation Management Plan
The Rehabilitation Management Plan will be
implemented throughout the life of the
Project and will include topsoil management
and progressive monitoring and
maintenance of the disturbed areas.
The Plan will also involve the removal of
Project infrastructure and services and the
remediation of all environmentally
disturbed areas in consultation with the
post-mining land owner and the Traditional
Owners, and accepted by the relevant
Government regulators
Rehabilitation Management Plan
Rehabilitation Plan
Decommissioning Plan
Construction and Operations
Receiving Environment Management Plan
Receiving Environment Monitoring Program
The Receiving Environment Monitoring
Program monitors, identifies and described
any adverse impacts to surface water
environmental values, quality and flows due
to the mining activities.
Receiving Environment Monitoring Plan
Land and Marine Management Plans
Construction and Operations
Offsets Delivery Plan
Offsets Delivery Plan
The Offsets Delivery Plan sets out the
proposed offset actions for approval by EHP.
The Plan will be approved by EHP prior to
Project commencement.
Biodiversity Offsets Plan
Bauxite Hills Project Supplementary Report to the Environmental Impact Statement
21-6
Project Aspect Plans Listed in the EIS Consolidated/Updated Plans Discussion
Construction and Operations Significant Species Management Plan Significant Species Management Plan
The Significant Species Management Plan
will measure adverse impacts on marine,
aquatic and terrestrial flora and fauna. The
Plan will include appropriate management
measures to mitigation potential impacts on
marine, aquatic and terrestrial flora and
fauna.
Construction and Operations
Water Management Plan
Water Management Plan
The Water Management Plan will include
monitoring and management measures for
surface waters (including marine) and
groundwater. This Plan will be implemented
throughout the life of the Project.
Surface Water Management Plan
Groundwater Monitoring and Management
Plan
Stormwater Management Plan
Estuarine Water Quality Monitoring Program