scope of h im cv pv xt r&d1

Post on 12-Feb-2016

33 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

Scope of H IM CV PV XT R&D1. SIEMENS AG - Healthcare. Factory Rudolstadt (Germany). Department: H IM CV PV XT R&D1 (Rudolstadt). Components for Particle Therapy. Components for Radiotherapy. Accelerator Assembly (270° Bending): 13 to 27 resonant cavities total length 1,2m to 1,7m - PowerPoint PPT Presentation

TRANSCRIPT

Copyright © Siemens AG (all rights reserved)

Scope of H IM CV PV XT R&D1

SIEMENS AG - Healthcare Factory Rudolstadt (Germany)

Department: H IM CV PV XT R&D1 (Rudolstadt)

IH Drift Tube Linac:

• 56 tubes• total length 3,8m • 3 Quadrupol Magnets• Particle Energy 0,4MeV/u to 7MeV/u

BAMS Detektor:

• 2x Wire Chambers (Beamposition Measurement)

• 3x Plate Chambers (Dose Measurement + Adjustment)

• Ripple Filter and Range Shifter (Beam Steering + Adjustment of Bragg Peak Depth)

Debuncher: equalization of particle Energy

Components for Particle Therapy Components for Radiotherapy

Accelerator Assembly (270° Bending):

• 13 to 27 resonant cavities• total length 1,2m to 1,7m • Electron Energy 4MeV to 21MeV• Beamcurrent up to 85mA

Accelerator Assembly(straight Beamline):

• 6 resonant cavities• total length 0,5m • Electron Energy 3MeV to 6MeV• Beamcurrent up to 120mA

Technical LINAC: 6/9MeV system for NDT and Cargo Scanning

top related