SAN MARCO PARKING GARAGEJacksonville, Florida
Architect: The Haskell Company
Engineer: The Haskell Company
General Contractor: The Haskell Company
The space where the garage is was used for lay down during the initial construction of the tower. While the tower was being constructed the precast products were being produced off site freeing up the space on site for materials.
The top level of this garage is an amenities level with a pool,
and tennis courts. Meeting the loading requirements yet still providing an open clear span in the garage can only be done with precast.
With the condos separated by a 2” expansion joint, providing
a 4 hour fire separation was taken care of within the precast structural system with 8” solid wall panel on the entire separating elevation.