4aA87NE3ei0 2 .5196 BOWMAN 010
Report On
Overburden Drill Program
Cook Project
Bowman Township
RECEIVEDNOV 1 1 1982
AWNING UNDS SECTION
November 8, 1982
By
Asarco Exploration Company of Canada Limited
42A07NE03ia 8 .5196 BOWMAN 010C
Page
Summary ................................... l
Location and Access ....................... l
Previous Work ..... ... ..................... l
Overburden Drill Program .................. 2Pleistocene Geology ...... .. . .. .... . .. . . . .. 2
Bedrock Geology ........................... 3
Conclusions ... . ... .. . .. . ... ...... ...... ... 3
Appendices
Report of WorkClaims Submitted for Assessment Credit (Attachment - l -)Breakdown of Assessment Credit (Attachment - 2 -}Invoice Supported Expenditures (Bradley Brothers Limited)General Location MapDrill Logs for Holes RC-1 and RC-2
Summary
On June 16th, 1982 two reverse circulation overburden drill holes totalling 127 feet were completed. Grey lacustrine clays weathered brown within ten feet of surface predominate most of the pleistocene section. These clays overlie a relat ively thinner unconsolidated clastic sedimentary unit which overlies bedrock. The clastic unit consists of basal sands, gravels and tills. One of the holes encountered basal sand and gravel while the other intersected basal sand, gravel and till.
Location and Access
The Cook property consists of twenty-six mining claims compris ing three separate groups. The group of claims for which this work is being filed is located in Bowman Township, Lots 8 and 9, Concession III and IV, and consists of the following claim numbers:
L545367 to L545369 inclusiveL545339L545342L545382L554705 and L554706L532706 and L532707
The claim group is accessible via a gravel road which runs south along the Lot 6 - Lot 7 boundary line from the intersection at Highway # 101, one mile west of the town of Matheson. The gravel road turns to the west along the Concession III - Concession IV boundary line and enters the claim group *s mile from the turn.
Previous Work
Asarco Exploration Company of Canada Limited and the Tillex Syndicate have been active in the general area since 1973. Several overburden holes were drilled on the claim group as well as one diamond drill hole completed in 1981 to a total depth of 492 feet. Ground geophysics including horizontal loop E.M. and magnetometer surveys have been conducted over the claim group.
- 2 -
Overburden Drill Program
Drilling was carried out by Bradley Brothers Limited using a Longyear 1-38 drill modified for a dual-tube reverse circul ation drilling. The drill is mounted on an eighteen ton diesel FN 160 Flextrack Nodwell, and has a hydraulic derrick capable of handling twenty feet of rods.
A continuous return enables a continuous monitoring and logging of unconsolidated overburden. Bedrock cuttings were also collected for approximately the first five feet. Where till or basal material was identified or suspected approximately 10 - 15 pounds of -10 mesh material was collected for analysis of heavy mineral concentrates. Some -HO mesh material was added to assist in studies of till composition.
The two overburden drill holes were located in such a manner as to confirm the results of previous drilling and to trace anomaly trains up-ice from the holes initially drilled. In general this was a northerly trend.
Pleistocene Geology
Most of the area of Bowman Township including the claim group is underlain by Barlow-0jibway lacustrine clay deposits which in a few localities may grade upward and laterally into coarse sand and gravel outwash which may be proximal to a former shoreline. The deposits are underlain by glacial tills and basal sands and gravels.
The grey lacustrine clay occupies a greater part of the pleistocene section.
Hole # RG-l intersected fifty-seven feet of grey clay weathered brown within five feet of surface. Underlying this unit from fifty-seven to sixty-five feet was basal sand and gravel contain ing approximately 50 - 70% sand.
Hole # RC-2 intersected forty-nine feet of grey clay weathered brown within eleven feet of surface. Underlying this unit from forty-nine to fifty-three feet was a basal sand, gravel and till unit.
In both instances the clastic basal units were anomalous in Au values in the heavy mineral concentrates.
b*Bedrock Geology
Only limited geology is known in Bowman Township over the claim group since no outcrops occur. A best attempt was made to identify bedrock geology from approximately five feet of bedrock chips in the return.
Hole l RC-1 intersected a chloritized basic volcanic probably an altered basalt with less than J.% disseminated pyrite.
Hole # RC-2 intersected a dark green chloritized basic volcanic with less than ^ disseminated pyrite, l - 2% disseminated magnetite, and several small altered syenite dykes and fractures with up to 31 pyrite.
Conclusions
The immediate subsurface pleistocene cover consists of grey clay from glacial lake Barlow-Ojibway. A basal sand, gravel and till unit underlying this provides a good sample medium where it is till, since sand and gravel transport is larger, more erratic and much more difficult to outline a source. However, both basal clastic units in the two holes drilled were anomalous in Au values.
Respectfully submitted,
Alex S. Horvath
ASH: mm
Attachment 2
Breakdown of Assessment Credit
Bowman Township
OVB. Hole No. Depth Drilling Time Set-Up S Moving Time
RC l 70 ft. l h hr. l hr. RC 2 57 ft. 1*5 hr. l hr.
Equipment Rental:
5 hours @ $218.00/hr. $ 1,090.00
Tricone Bit #090147 $725.00.+ J.5% 833.75
Move By Truck from Carr Twp. to Bowman Twp.:57 miles @ $5.00/mile 285.00
Demobilization: 50 miles @ $5.00/mile 250.00
Room and Board {Bradley Bros.) ^^^245.20
(Payment to Bradley Brothers) TOTAL $ 2,703.95
Field Expenses Directly Incurred by Asarco
A. Horvath GeologistD. Scott Field AssistantSalaries; One Day (June 16, 1982) $ 225.70
Living Expenses; One Day (June 16, 1982)
Timmins, Ontario (Motel S Meals)$45.00/Day per manA. HorvathD. Scott 90.00
Report Writing s Drafting
A. Horvath Two Days @ $150/Day 300.00
TOTAL $ 615.70
Page 2
Attachment 2
Total Expenditure by Asarco
$2,883.65 * 15
or 19 Days per Claim
$2,883.65
192 Days
We therefore wish to apply 19 days credit to each of the 10 claims listed on Attachment l (Bowman Township).
R.J. VGanfor Asarco Exploration Co.of Canada Limited
I hereby certify that the aforementioned expenses were incurred by Asarco Exploration during all phases of their overburden drilling project in the Township of Bowman, Larder Lake Mining Division, Ontario.
R.J. Deifor Asarco Exploration Co.of Canada Limited
BRADLEY 17, 1982
1 ago: J^il/i/i
t t./f HOLE No.
1"
l GR-*. 7l - *
9i*0-" i
(j
0
S.TD
.... . . MM/mjrr (IMW
Asarco Exploration Co. of Canada Ltd. 12th Floor - 350 Bay Street Toronto t Ontario M5U 2SG
TO COVER DIAMOND DRILLING FOR
FROM TO FOOTAGE COMPLETED
Carr d Bowman Township
Mobilisation - 51 miles e f5. 00
0* 162* 162' 0' 111* 111' O 1 106* 106' 0' 60* 60' O 1 103' 103' 0* 70* 70* 0* 57* 57'
Equipment rentals 25 hours 3 218.00
Down the hole consumables! 2 Tricone bits f 1725.00 - 11450.00 1 Adapter 570.00
(2020.00
Flos 15ft 301.00
Move by truck from Carr Twp to Bowman Township t 57 ailes 6 S. 00
Demobilisations 50 Kiloa g 5.00
Room t Board
July 5, 1982RECEIVED PAYMENT
IN FULL THANK /YOU ,
'Per ' "^^,/
WD DRILLING
9255
5,450
2,323
285
250
24518,800
00
00
00
00
00
2020
JR MM sneer fi.O. IOXM7- NOMNDA, OUt. MX SA9
"DATE 16/^2. HOLE NO. PC-2. GEOLOGISTDRILLER GUY HOLE LOCATION IQQ m M or ROl
'BIT NO. QQQi-4-T FOOTAGE ON BIT
HOURS MOVE HOURS DRILL l *Jz K rs. OTHER
JTOsDATE 3TTNE 16. I9fl:i HOLE NO.•r J ^--r-" J"j"""
bRILLER ^ilJY FORTIN________ HOLE LOCATION
_ FOOTAGE ON BIT —.—-——.
HOURS DRILL l 4-
GEOLOGIST A. MQRVATH
BIT NO. O9QJ47
ilOURS MOVE OTHER
f' 5
Ok .̂
"*
10-
,i -*
W"
*™^
"Mlhk **-
•i
: m
^-Mw
\.'l' J
;ln ~" -
m
40 —
•M*
M
.a
*
•Mro-"1*
..l m
•'•; m
\ ••M
'" . Ml
fc
* * w
.' ' *
*
M
•HA ^ CXOmP M o
^•MMMWM
1 ——— ———
——— . ———
—— . ———
— , ————
—— . ———
m , I N -•UN ,m
•.——••P——————— M———
•MWt ffMIBM
——— l' "" ' ' "' " '
.•••••/.•i".•:*'.*'.*
5^1i-.*:'.*W*
l
SAMPLENO.
-
-
-
-
-
-~ *
--
r
*.
^
jC-I-ot
^C-J-OZ
:RC-l-03
L.
u-
tOCKifliVlJ Li W O
NO RETURNWUNrtU^D. BRO\AXM C-LAV , hrtiMQR fil^r
G^EYCLAX WITH SILTPOOK RETURN
GREY CLAY WITH SILT UOCAULYGOOD RETURN
&AN6 AKO tiMVfL.S&'.to'H SAUD" ——————PEBBLCS IHCU/pCr lMTfKMCO.ro *AIX C VOLCANICS,iNTenKcuTo rciAfc iMTRyiivltTwoiKtHir, **CLvAr\T2 .
RAKE SMAUU coeeuci, VOLCANIC Pi&eucs WITHBLUE Q.UARTZ EYES^ULORrTIC EASft VOLC. PvMLCS, {.SMAU. fcOWUPKH ? J ..
BEDROCK: CHuxurxzeo BAMC VOLCANIC^PROBA8UY AUT6M.D BASAuT. MTNOR PY* < 1 V* FOOT OP WOLC ro'
0
i\ N A L Y S E S
*
'
Name :
Present Employer;
Employed Since:
Diplomas:
Alex S. Horvath
Asarco Exploration Co. of Canada Ltd. 12th Floor, 350 Bay Street Toronto, Ontario M5H 2S6
May 1982
SSGD Alderwood Collegiate Institute SSGHD Alderwood Collegiate Institute - Ba.Sc. University of Toronto (Geological
Engineering - Exploration Option)
Present Position: Exploration Geologist
Memberships: CIM (Toronto Branch)Prospectors and Developers Association
Work Experience: Operating Geophysical Surveys (E.M. 16, Max. Min. E.M., Magnetometer) Conducting Geochemical Surveys (Soil and Lithogeochem, Radon Gas) Overburden Drill Logging Diamond Drill Core Logging Surface and Underground Mapping Assistant Mine Geologist (Aquarius Mine)
Geological Environments: Primarily Canadian Greenstone Belts
Date: Signature: /A ̂ -
UOT TLOT 10CO M C
LOT 8
(NOT oyPROPERTY;
I00m LIW,200mS
(3) LO, 350 m S(4) LO,. 500 m SO PREr 13 3Z 06 HOLES
9 1381 CI i HOLES
LOT io
SI~*e COOK JOTSfTLOTS S^S.CoNC III,IY
0 BOWMAN TWR, ONT.LOTS SCAUE: l: IO.OOO
Asarco Exploration
R, S. GrayManager
42A07NEe0ie 2.5)96 BOWMAN 900
November 15, 1982
Mr. F.W. Matthews Land Management Branch Whitney Block, Room 6450 Queen's Park Toronto, Ontario M7A 1W3
ECEIVED
NOV17I982F, ANDERSON
tb R. MORTON
Q. C . SMITH
O. SHERMAN
'J. M . SMALL
RETURN TO H. 6 4 50
Report On Overburden Drilling Bowman Township/ Ontario -
Dear Sir:
Please find enclosed duplicate copies of a report on overburden drilling carried out during June 1982 by Asarco Exploration in Bowman Township.
This report includes a descriptive text and logs covering two holes on the Cook Project. We are reporting two holes for a total expenditure of $2,883.65 or 192 days credit ^IS/day). We wish to distribute this credit evenly over ten contiguous claims for a total of 19 days credit per claim. These particular claims have 22.5 days credit applied under previous submittals in expenditure credits. Included in the report is a cost break down with copies of expenses incurred, drill logs and a drill hole location map.
The Mining Act Report of Work has been previously submitted to the Mining Recorder, Larder Lake Mining Division.
Asarco Exploration Co. of Canada Ltd. 12th Floor, 350 Bay Street Toronto, Ontario M5H 2S6{416)383-7993
A subsidiary of
ASARCO
r- 2 -
Once again we enclose a brief resume of the authors credentials which you may wish to keep on file for future use. Mr. A. Horvath is now an employee of Asarco Exploration in the Toronto office and will be filing additional assessment work in the months and years to come.
We trust all is in order and you will process our application forthwith. Thank you for your assistance.
Yours truly,
R. J.
RJD:mm
c.c. Mining Recorder Kirkland Lake
Asarco Exploration
R. S. Gray " *Manager
October 27, 1982
RECEIVEDKUV l V 1982
MINING LANDS SECTIONMr. G,J. KoleszarMining RecorderMinistry of Natural Resources4 Government Road EastP.O. Box 984Kirkland Lake, Ontario
Dear Sir:
Overburden DrillingCarr and Bowman Townships
Please find enclosed two separate Mining Act Report of Work forms upon which we are reporting two overburden drilling programmes completed in June 1982.
In Carr Township we are reporting five overburden holes (Carr-Destor Project) for a total expenditure of $7,035.65 or 469 days credit. We wish to distribute this credit evenly over twelve contiguous claims (595463-474 inclusive) for a total of 36 days credit per claim. With this application we fulfill the maximum allowable credit of 60 days per claim under "expenditures" as we have -previously submitted 24 days credit (expenditures) on each claim. Our records now indicate that these claims will remain in good standing until December 8, 1983.
In Bowman Township we are reporting two overburden holes (Cook Project) for a total expenditure of $2,883.65 or 192 days credit ^IS/day). We wish to distribute this credit evenly over ten contiguous claims (see Attachment 1) for a total of 19 days credit per claim. We have previously applied 22.5 days credit under "expenditures" on this claim group. Our records now indicate that these claims will remain in good standing until January 7, 1984 (8 claims) and February 6, 1984 (2 claims).
l'Asarco Exploration Co. of Canada Ltd.
: 12th Floor, 350 Bay Street 'l Toronto. Ontario M5H 2S6 A.ub*witryot
(416)368-7993 ASARCO
2
Copies of the reports (2) including drill hole logs, descriptive text, location maps and an invoice supported breakdown covering all this work will be submitted to the Land Management Branch, Queen's Park, Toronto.
Yours truly,
R.J. Dean
RJD:mra
Encl.
© Mimstryot Report of Work Natural ,- , . . f. . . . Resources (Geophysical, Geological,
Ontario ' ^fe v Geochemical and Expenditures) ^ f~~JOf
i. tt 1^^* . k^.^^^fi^^^^^WS^**^r*' " Z 5 5*2 76 to 1 HfJviining ActType of Surveyls) . ^.^
Overburden Drilling j f ~) f |Claim Holder(s) C?C ' '
Asarco Exploration Co. of Canada Limited
Instructions: —
Note: -
Please type or print If number of mining claims traversed exceeds space on this form, attach a list. Only days credits calculated in the "Expenditures" section may be entered in the "Expend. Days Cr." columns. Do not use shaded areas below.
f Township or Area
\r\ BowmanProspector's Licence No.
A 22916Address
350 Bay Street, 12th Floor, Toronto, Ontario M5H 2S6Survey Company Date of
Bradley Bros . - Timmins , Ontario Day jSurvey (from Si to)
Mo. | Yr. 1 Day | Mo. | Yr.Name and Address of Author (of Geo Technical report)
A. Horvath (Asarco Expl.) 12th Floor, 350 Bay St., Toronto,
Total Miles of line Cut
Ont. M5H 2S6Credits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:
Enter 40 days. (This includes line cutting)
For each additional survey: using the same grid:
Enter 20 days (for each)
Man Days
Complete reverse side and enter total(s) here
Airborne Credits
Note: Special provisions credits do not apply to Airborne Surveys.
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Electromagnetic
Magnetometer
Radiometric
Days per Claim
Days per Claim
Days per Claim
Expenditures (excludes power stripping)
Mining Claims Traversed (List in numerical sequence)
Type of Work Performed
Overburden DrillingPerformed on Claim(s)
L 545368
Calculation of Expenditure Days Credits
Total ExpendituresTotal
Days Credits
S 2 ,883. 65Instructions
Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right. \
Mining ClaimPrefix
L
Number
545382
545339545342
545369
545368
545367532707
532706
55V17065514705
LAF
-IEN
Expend. Days Cr.
19
1919
19
19
191919
19
19
D e rvMINIMI*-m-
lil i 1 M ~111 W T—AM —— ————— '
7|8|9| 0|11|12|
L..
hIV
n w|2
Mining ClaimPrefix I Number
R! : CEIV* V* l* l V fa
M 4 8 1982MININ
AKE
/l J)823|4|5|
S LANDS Stl
•~
K—
Total number of mining claims covered by this report of work.
Expend. Days Cr.
-a*-
nor-
/'
l
v;!fi
t
10For Office Use Only
Total Days Cr. Recordd
Date Recorded"BUT-* 1982
Certification Verifying Report of Worll hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.
Name and Postal Address of Person Certifying
R.J. Dean, Asarco Exploration Co* of Canada Ltd. 12th Floor, ^SjQlVay St. ,~* l Date Certified (Certified tfltXSiofinClre'T
Toronto, Ontario M5H 2S61362 (81/9)
al
l Oct. 27/82
Ministryof
SSLOntario
GeotechnicalReport Approval
Fill
Mining Lands Comments
To: Geophysics
Comments
Q Approved [~1 wish t o *ee "gain with correctionsData Signature
To: Geology - ExpendituresComments
pproved Wish to see again with correctionsDate Signature
To: Geochemistry
Comments
[~] Approved l ] Wish to see again with correctionsDate Signature
j j To: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5-1380)
1593 (SI/10)
1982 11 23
364
2.5196
Mining RecorderMinistry of Natural Resources4 Government Road EastP.O. Box 984Kirkland Lake, OntarioP2N 1A2
Dear Sir:
We have received data for Assaying submitted under Section 77(19) of the Mining Act R.S.O. 1980 for Mining Claims L 545382 at al in the Township of Bowman.
This material will be examined and assessed and a statement of assessment work credits will be Issued.
We do not have a copy of the report of work which is normally filed by you prior to the submission of this technical data* Please forward a copy as soon as possible.
Yours very truly,
E.F. AndersonDirectorLand Management Branch
Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phonet 416/965-1380
DWisc
cc: Asareo Exploration Company of Canada Ltd Toronto, Ontario Attn: A. Horvath
Carr Twp
McConn Twp,42A07NE00I0 2.5196 BOWMAN
J. v. KALBEN
200
Or
Q. OCO
THE TOWNSHIP OF
BOWMANDISTRICT OF COCHRANE
LARDER LAKE MINING DIVISION
SCALE : I-INC^40 CHAINS
LEGENDPATENTED LAND CROWN LAND SALE LEASES
LOCATED LANDLICENSE OF OCCUPATIONMINING RIGHTS ONLYSURFACE RIGHTS ONLYROADSIMPROVED R OADSKINGS H IGHWAYSRAILWAYSPOWER LINESMARSH OR MUSKEGMINESGEODECTIC STATION
NOTES-4OO SURFACE Peril's
ALL LA K. e. s
L O 8672 i ssued for flooding r ights on Watabeag R iver
GRAVEL AND SAND
0- QUARRY PERMIT
DATE OF ISSUE
APR 2 7 1983
inis'^ of Ka'ur2lRD:c-r::s TORONTO ___
PLAN NO.- M-333ONTARIO
KUTi.RAi RESOURCESf " .' '.,A?PINC BRANCH
top related