retrofit sub

Post on 03-Jun-2018

227 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 1/57

Retrofit Measures

or

Derrell Manceaux, P.E.

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 2/57

Pur ose

To describe typical retrofit measures for:

Piers and columns Cap beams

 

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 3/57

Retrofit Methods

Column replacement

Su lemental columns Shear & flexure strengthening

mprovemen o uc y Steel jacketing

 Active confinement w/ prestressing wire

Com osite fiber/e ox acket

Reinforced concrete jacket

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 4/57

Column re lacement

Replace when: Damaged column

Flexure is greatly insufficient

Space limits other measures

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 5/57

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 6/57

Column re lacement

Column anchorage-(headed bars)

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 7/57

Column re lacement Supplemental column

 

loads.

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 8/57

Flexural stren thenin

Not desirable in many cases

Shear capacity increases which attracts force to

the pier cap and foundation

Desirable case

 new location

 

Concrete overlay (additional reinforcement)  Adding reinforcement with steel shell

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 9/57

Flexural stren thenin

Concrete overlay

Concrete alone adds strength due to moment arm

Long steel adds additional strength Must provide shear transfer with dowels

Must rovide confinement- hoo s

ties

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 10/57

Column stren thenin  Adding reinforcement with steel shell

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 11/57

Column stren thenin  Adding reinforcement with steel shell

us ensure s ear rans er 

Provide development length into footing/cap

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 12/57

Column stren thenin  Adding reinforcement with steel shell

eve opmen o s ee s e o ensure p as c s ra n

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 13/57

Ductilit and shear im rovement

Low ductility occurs from using starter bars at

base of column Concrete splits due to radial stresses from

Proper confinement may stop splice failure

Extend confinement to 75% of maximum

moment or column diameter 

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 14/57

Ductilit and shear im rovement

Failure path of an unconfined column

Spalling begins at strain =0.005 Ties began carrying more stress at this point and

fail

Confinement is lost and concrete core crushes

 

Conc core fractures and loses axial, flexural and

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 15/57

Ductilit and shear im rovement

Steel acketin

Use 2 half shells and weld

 

Confinement is provided AFTER expansion of

Place 1-2” gap at end of jacket and supporting

R factors=4-6 may be used t ness ncreases - - na yze w t new

stiffness

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 16/57

Ductilit and shear im rovement

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 17/57

Ductilit and shear im rovement

Shell for rectangular columns

Rectangular shells do not have membrane action

like circular shells-They act like bending members

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 18/57

Steel Shell Retrofit Exam le

(for splice) Provide data

Perform sim lified d namic anal sis Conduct shell design

er orm es gn c ec Deflection capacity

Shear capacity

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 19/57

Structural confi uration

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 20/57

Re uired data additional Superstructure weight W 1000 ki

Ground acceleration FvS1 .6 g

Concrete strength

4

f' 5 ksi ksi

Effective inertia e.  

 

Nominal shear capacity V N 110.6k

 

(corresponding shear)

Concrete cover  cover 2 in

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 21/57

Sim lified d namic anal sis

3 E I eff  k ruc ura s ness c

L3

c .ft

Mass m g m 31.056 k sft

Structural periodT 2  

m

k c

T 1.737

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 22/57

Sim lified d namic anal sis

(cont’d) Spec acc a

T S a 0.345 g

EQ shear  V EQ S a W V EQ 345.454 ki

EQ moment M EQ V EQ M EQ 10363.61 k f 

EQ deflection   EQ

V EQ

k c

EQ 0.85 ft

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 23/57

Shell desi n

FBD

fl .3 ksi

Confinement stress

s

fs=stress induced in jacket=29 ksi at strain =0.001

fl=confinement stress=300 psi

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 24/57

Shell desi n

e c ness

Use 10mm=3/8 in fort f l

2 f  t 0.25 i in

Ductility factor  R eff M EQ

M n R eff  3.12Rdemand

Rdemand

<

Plastic hinge zone p .   p .

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 25/57

Desi n check

Perform moment curvature analysis to

determine rotational capacity Conduct pushover analysis to determine

Verify capacity is greater than demand

or e ect on

For shear 

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 26/57

Desi n check

Perform moment curvature analysis with shell

and existing reinforcing

Plastic rotation capacity   p 0.0591 ra

L x (Øu – Øy)

0.03211  

 

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 27/57

Desi n check

Perform pushover analysis

Target displacement from elastic analysis

1.5     T 1.27 i ft

Plastic displacement

p   T   p. n .

Check rotation demand vs ca acit

pL

  p 0.04 rad 0.03 rad

 

p 0.04 rad p 0.0591 ra<0.03 rad

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 28/57

Desi n check

Retrofitted column can handle twice the

plastic rotation.  Actual required thickness would be about

.

shell

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 29/57

Desi n check

Shear check outside plastic hinge region

Target shear 

V p 1.5 V V p 165.9 ki

ear capac y

'2 .8

  1000

.

OK

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 30/57

Prestress Wra in Better system for confinement (active system)

  ,

High losses due to friction

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 31/57

Prestress Wra in

Prestress wrapping with

wedges Machine pulls strand

away from pier and

wedges are placed toestablish tension

Minimum losses

No data on rectan ularsystems

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 32/57

Prestress Wra in

P t W i

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 33/57

Prestress Wra in

Semi-circular reinforcing bars (same effect as

prestress)

D tilit d h i t

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 34/57

Ductilit and shear im rovement

Semi-circular reinforcing bars

D tilit d h i t

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 35/57

Ductilit and shear im rovement

Composite fiber jacketing High strength glass (E-glass)

Carbon  Aramid fibers

 

Passive system is preferred method

ac ve sys ems creep an rup ure

Loses strength due to moisture absorption R=4 for most columns

I fill h ll

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 36/57

Infill shear wall

I fill h ll

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 37/57

Infill shear wall Increases shear capacity Prevent hin es from formin transverse

Must act composite with existing members (dowels)

V ti l it ti

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 38/57

Vertical ca acit reservation Type “P” retrofit

 

Rubble is retained in shell to give vertical support

ery cos e ec ve

Li it ti f l f

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 39/57

Limitation of column forces

Isolation bearings

Flexural stren th reduction

Limitation of column forces

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 40/57

Limitation of column forces

Sierra Point Overhead

Limitation of column forces

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 41/57

Limitation of column forces Isolation

Limitation of column forces

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 42/57

Limitation of column forces

Not suited for isolation

Bridges on soft soil (acc increases) Long period structures (little is gained)

 

Period shift

Limitation of column forces

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 43/57

Limitation of column forces Flexure strength reduction

e uces p as c momen an s ear eman

Must improve ductility capacity

Consider making hinge on frames

Concrete ier wall retrofit

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 44/57

Concrete ier wall retrofit Stiff and strong in transverse direction

nsure oun a on can carry oa

Retrofit usually not required unless starter bars exist

Concrete ier wall retrofit

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 45/57

Concrete ier wall retrofit

Bent ca confi urations

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 46/57

Bent ca confi urations Pinned connections have minimum stress  

forces

Bent ca confi urations

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 47/57

Bent ca confi urations Outrigger piers have high torsional stresses

Pier ca / oint re lacement

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 48/57

Pier ca / oint re lacement

  Difficult

Expensive

Bent ca stren thenin

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 49/57

Bent ca stren thenin  Add bolster to side

us ac compos e o prov e exure an s ear  

Dowels help ensure composite action by shear friction

 Add extra reinforcing and prestress

Bent ca stren thenin

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 50/57

Bent ca stren thenin Integral caps more difficult to retrofit

 

 Add bolsters to lower side of cap for positive moment

res ress ng may e mos econom ca

Reduction in ier ca forces

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 51/57

Reduction in ier ca forces Link beam retrofit

 

Limits shear in column to value just below link

 elastic

Stren thenin of column and

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 52/57

Stren thenin of column and

beam joints Integral bent cap retrofit

Stren thenin of column and

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 53/57

Stren thenin of column and

beam joints Knee joint retrofit

Pier and column limit states

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 54/57

Pier and column limit states

Pier and column limit states

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 55/57

e a d co u t states

Summar 

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 56/57

To describe typical retrofit measures for:

Piers and columns Cap beams

 

8/11/2019 Retrofit Sub

http://slidepdf.com/reader/full/retrofit-sub 57/57

What questions do you have?

top related