renard portfolio-2nd

Post on 22-Jan-2018

276 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1700 7th (Northstroom) 06starbucks

architecture design portfolio

RenardDuties on Project: DMStratification: Core PlusCaféPrograms:WOC & ReserveLEED Certification:NASq/Ft:1,716SFCM: Duncan ChalmersDesMgr:Renard MunThrough this project Ilearned a lot of detailsand SBUX CA.Status: Opened May/2015

2011-present

WINDFALL RECLAIMED OAK WALLFINISH PANELS, FEATURED WOOD WALL & CEILING,

CONCRETE STAINLIGHT GREY- 11377

CONCRETE STAIN DARK BROWN- 11289

BAR COUNTERTOPCREAM W/ RECYCLED GLASS -CP0012

LEATHER @ ESPRESSO BARANTIQUE BLACK- L0016

METAL @ CEILING EDGE TRIM , SCREEN & FURNITUREANTIQUE BLACK- L0016

TILE-BACK BARGLOSS NAVY BLUE- 12615

CEMENT BOARD – FEATURED WALL HARDIE PLANKS CUSTOM FINISH1

1

2

2

1

1

2

2

renard
Cross-Out
renard
Rectangle

UW HUB, Seattle WA07starbucks

RenardDuties on Project: DMStratification: LS CoreCafePrograms:WOC &Modified Kiosk caféLEED Certification:NASq/Ft:1,100SFPDM: Tim TowncendDesMgr:Renard MunThrough this projectFirst University LS projectCoordination withLicensee was challenge.Status: In progress

2011-present

“a forward-thinking, contemporary

facility and a true embodiment of what

a 21st-century student and campus

center “

“the new HUB serves as a model of

how colleges and universities across the

country can take existing buildings on

campus and re-purpose them for the

future”

“the building seamlessly bridges

the university’s past, present and

future by blending elements of

the original HUB with new

features”

“create a welcoming space that

connects students to both the campus

and greater community,”

“create a welcoming space that

connects students to both the campus

and greater community,”

Pacific Uni, Forest OR08starbucks

RenardDuties on Project: DMStratification: LS new corecaféPrograms:WOCLEED Certification:NASq/Ft:2500SFPDM : Tim TownsendDesMgr:Renard MunCoordination with LSarchitect was challengeStatus: OpenedSeptember/28 2015

2011-present

Sunriver, sunriver OR09starbucks

RenardDuties on Project: DMStratification: LS new corecaféPrograms:WOCLEED Certification:NAPDM : Tim TownsendDesMgr:Renard MunCoordination with LS

2011-present

2nd division, Spokane WA & Woodburn premium, OR10starbucks

RenardDuties on Project: DMStratification: Core DTPrograms:WOC &DTELEED Certification:YesSq/Ft:1,8226SFCM: Kristie kucurDesMgr:Renard MunExpansion projectControl budgetCombine existing andnew elementsStatus: Completed

woodburn Duties on Project: DMStratification: New CorecaféPrograms: No programLEED Certification:YesSq/Ft:1,111SFCM: Ron BlanchetteDesMgr:Renard MunFirst metal CW projectI learned Starbucksdesign process in OregonMallStatus: Completed

2011-present

LAX11starbucks

2011-present

FLL

FLL RFP

12starbucks

2011-present

LS experience

Atlanta airport YVR

Supervalu PPH

Kiosk

YYZIAH airport

DFW airport

13starbucks

2011-present

top related