PT. BANGUN SARANA BAJASteel Fabricator & General Contractor @@@?F
Gresik, August 24,2At7
No. : 272_R/BSB/PPi Vru 12077Subject: Quotation
To.PT, PP (Persero)
Attn. : Ms. Rayza AuliaEmail : ravza@pp-epc.com
Dear Sir,We would like to submit revised Quotation for Grati Block 2 Add On - Shelter & Piperack - PT. PLN (Persero), withtotalamounf as follows :
Rp. 4,43O.O0O.O0O,- (Excluded VAT 1oo/o)Said : Four Billion Four Hundred Thifi Million Rupiah
Notes :1. Scope of work :
- Preparation of shop drawing- Supply of raw material- Fabrication- Painting- Packing- Delivery to Site, Gresik, East Java (No Frame, length max. 12m, bolt connection system)- Erection
2. Out of scope :- Site welding work- Structural design and connection detail calculation- Handrail, ladder and stair work- Grating, checkered plate and expanded metalwork- Roofing, siding, ridge, flashing, lisplank and fascia work- Gutter and downpipe work- Door, window, louvre, fence and ridge ventilation work- Insulation work- Pfate work (eg. Silo, vessel, drums. bin, chute, duct, stack, etc.)- Machining work- Welded section and welded box profile work- Hardox, SM490 and stainless steelwork- Fireproofing work- Rebar and concrete work- Embedded plate and embedded part work- Bondek/steel deck and shear connector work- Supply and setting anchor bolt- Supply and setting exgintion bolt (mechanical or chemicaltype)- Architectural work (eg. Celing, partition, etc)- Mechanical, Electrical & Piping (MEP) work- Supply and setting roof ventilator
Jl -Rungkut lndus t r i 2 135, Surabaya-60292,JawaTimur J l .May jensungkonox l l /8 ,Gr$ ik -6116 l ,JawaTimur J l .P lu i tBara t l /36 ,Jakar taUtara-14450,Jakar taTe l :+62 31 843 8165, +62 31 8490266 Te l :+62 31 3971919Far: +62 31 843 1024P.O tsox : 159 / SBS 60401Homepaqe : w.mulcindo.com
Fax; +62 31 397 1988, +62 31 398 2852Email : bsb_sub@sby.dnet.net.id
Tel : +62 21 669 6085Fax : +62 21 669 6203Email : bsbptjkt@rad.net.id
PT. BANGUNSteel Fabricator &
SARANA BAJAGeneral Contractor @@@?F
SS 4OOSS 4OOSS 4OOss 400SPHCBITP 24 / BITD 40ss 400 I A36ASTM A325 / la97 (Black)- Primer : Inorganic Zinc 85 to 89a/o Zinc by weight, 50 micron- Intermediate : Two Component Polyamide Epoxy Carboline, 125 micron- Finish : Polyurethane, 50 micron- Sandblasting SA 2.5
Materialwill be substituted into material standard on the market
Quotation Validity : 30 days
Volume to be re-measured based on actual shop drawing
Term of payment :- 10o/o Engineering approval- 30o/o Fabrication & Inspection at worKhop- 20o/a Material on site- 35o/o Complete installation- 5olo Retention (12 months warranty bond / bank guarantee 5olo)- SKBDN Ussance 90 days
Thank you for your kind attention and we are looking forward to have your prompt reply.
projectV\PP\pn277_R Grati Block 2 Add On -Shelter & Piperack
3. Materialspecification :- WF, H Beam- Welded beam- UNP- Angle, L- CNP- Round Bar- Plate, PL- Bolt- Painting
4.
5.
6.
7.
President Director
Surabaya OfficeJl. Rungkut lndustri 2 / 35 , Surabaya - 60292 , Jawa TimurTet:+62 31 84:l 8155, +62 31 8490266Fil: +62 3l U3 1024P.O Box: 159 / SBS 60401Homepaqe: w,mdcindo,com
Gresik Offics ( Head Office )Jl. Mayjen Sungkono xll / I , Gresik - 61161 , Jawa TimurTel : +62 31 397 1919Fax : +62 31 397 1988. +62 31 398 2852Email : bsb_sub@sby.dnet,net.idHomeDaoe : w.bsb.co.id
Jakada OfiiceJl. Pluit Barat | / 36 , Jakarta Uiara - 14450 , JakartaTel : +62 21 669 6085Fax : +62 21 669 6203Email : bsbptjkt@r€d.net.id
BILL OF QUANTIWProject : Grati Block 2 Add On - Shelter & PiperackClient : PT. PP (Persero)PN No. :272 RIBSBIPP fVl l l l2OlT
No Description Total Weighl Unit Price (Ro.) Total Price(Rn )Material Fabrication Paintinq Transport Erec{ion Total
I FireFiqhtinq11 .0009.800
1 1.4501 1.45011.45011 .45010.65010.6509.800
1 '1 . ' 15033.000
4.8504.8504.8504.8504.8504.8504.8504,8504.8504.850
0
3003.3003.3003.3003.3003,30C3.3003.3003.3003.300
c
50505050505050CU
CU
5050
4.4004.4404.4004.4004.4004.4004.4004.4004.4004.4004"400
4.500.000
4.4004.4004.4004.4004.4004.4004;4004.4004.4004.4004.4004.4004.400
4.500.000
4.4004.4004.4A04.4404.4004.400
. 4.4004.4004.4004.4004,4004.4004.4404.4004.4044.4404.4404.4004.4404.400
4.500.000
23.70A22.54A24t5424.15424.15424.15023.350? ? ? 6 n
22.50023.850/ t A A A
4.500.000
22.25422.25423.35023.700
. 23.70424.15024J5424.15424.15423.35025.55023.85043.550
4.500.000
22.20422.28422.zs$22.24424.40424.40023_00023"00023.00023.00023.00023.00!23.00023.00025.S0023.00022.20424.40C22.70443.550
4.500_00c
14 .631 .1951 .051.2001.967.742
26.328.0894.287.350
23.202.5961.767 .1283.583.525
07.639 6086.974.946
117.000
1.702.1253.459.875
13.786.0748.387.667
95.573,33133.282.081
v. / oo.zou
100.368 60840.754.0917.804.0376.685.1 58
32.032.81629.245.894
1 .143.000
1.234.3209.312.900
23.920.500219.364.860
35.292.160158.219.36062.297.8008.376.600
4s.904.700289.084.700429.828.600120.S70.800943.729.1 00473.271.000343. '146.5101 35.269.900
7.552.44015.759.960
323.674.987310.485.588
270.000
c1 50"65"20"3.2D16H150Y5"5?H200-1 00"5.5"8H250.1 25*6*9Ft300-1 50"6.5*9L50X50X5175X75X6RD,I6PlateConnection BoltGrouting
617,35 kg46,72 kg81,48 kg
1.090,19 kg177,53 kg960,7 kg75,68 kg
1s3,47 kg0,00 kg
320,32 kg.pl160,16 kg.b
0,03 m3 (Supply by clrent)
9.5509.550
10.6501 1.00011 .00011.4501 1.45011 .45011.45010.65012.8501 1 . 15039.000
4.8504.8504.8504.8504.8504.8504.8504.8504.8504.8504.8504.850
0
30030030c30c300300
3,3003.300? anl
3.30C3.3003-300
{l
5050J U
50f,U
5050CU
50505050
ll WaterTreaknsntPlant12
9192L75"75-6c100*5020-3.2c1 50.6s-20-3.2H 1 50"75*5-7H200"100"5.5"8H250-125"6"9H300.1 50-6.5.9L50',50"5[1 50-75"6.s-1 0PlateConnection BoltGrouting
76,50 kg155,50 kg590,41 kg353,91 kg
4.032,63 kg1.378,14 kg
404,40 kg4,156,05 kg1.687,54 kg
334,22 kg261,65 kg
1.343,10 kg.pl671,55 kg.b
0.25 m3 {Supply bv client)
t0.650t0.650I0.650t0.650t2.85012.850| 1.450t1 .45011.454| 1.450t1 .450t1.450| 1.450I 1.450t4.350| 1.45010.650| 2.850I 1 .1 50t9.000
3.7003.7003.7403.7003.7003.7003.7003.7003.7003.7003.7403"7S03.7003.7003.7003.7003,7003.7003.700
0
J .
J -
?
?
J
300300300300300
30c
?nn
30c300
3.30t3.30C3.30C3.30C3.30C3.30C3.30C3.30C
c
t50t50t50t50150t50t50t50150t50t50150t50t50r50t50150t50t50t50
lll Piperack2L75*75.62180-80-82L90"90"6211 00-1 00-1 02U-200X80X7"5X2U150Y5-6.5"1H150"75"5YHl 50"1 50"7.10H200*1 00"5.5-8H250-1 25-6*9H300.1 50"6.5-9H350*175-7"1 1H350-350"1 2"1 IH400"200.8-1 3H404"400*13-21H500"200"1 0*1 6L75-75-6u1 50t75"6.5"1 0PlateConnection BoltGrouting
55,60 kg419,50 kg
1.477,50 kg9.881,30 kg1.446,40 kg6.484,40 kg2.708,60 kg
364,20 kg1.S08,90 kg
12.568,90 kg18.688,20 kg5.25S,60 kg
41.431,70 kg20.577,00 kg'13.248,50 kg5.881,30 kg
340,20 kg545,S0 kg
14,258,81 kg.pl7.129,41 kg.b
0.06 m3 (Supply by client)
Said : Four Billion Four Hundred Thirty Million Rupiah
GRAND TOTAL {EXCLUDED VAT"107d : 4.430.5A8177Rounded: 4.430.000.000
,n/,
Page 1 of 2
HEAD OFFICE & FACTORY : Jl. Raya Kedamean No. 168, Desa Mojotengah, Kecamatan Menganti Gresik 61174, INDONESIA Phone : +62 31 7913777 (Hunting) Facsimile : +62 31 7912047 Email : headoffice@weltes.co.id Homepage : http://www.weltes.co.id
Gresik, 25 Agustus 2017 No: 155/W-PP/VIII/17 Kepada Yth. PT. PP (Persero) Tbk. DVP – EPC Jl. Letjend. TB Simatupang No. 57 Pasar Rebo, Jakarta 13760 Up. : Bpk. Matheus Maryono C.c. : -. Bpk. Browi Adam Hal : Penawaran Harga Fabrikasi dan Pemasangan Pipe Rack, Shelter WTP dan Shelter Fire
Fighting Package, ADD ON GRATI Blok 2 Power Plant 150 MW Project – Grati. Dengan hormat, Melanjuti negosiasi penawaran harga untuk pekerjaan Fabrikasi dan Pemasangan Pipe Rack, Shelter WTP dan Shelter Fire Fighting Package, ADD ON GRATI Blok 2 Power Plant 150 MW Project – Grati, pada tanggal 24 Agustus 2017, berikut kami sampaikan penawaran harga, sbb. : FABRIKASI DAN PEMASANGAN Pipe Rack, Shelter WTP dan Shelter Fire Fighting Package Spesifikasi dan rincian pekerjaan : Sesuai Material list dengan deviation list terlampir. Pipe Rack, Shelter WTP dan Shelter Fire Fighting Package -. Pipe Rack = 142.588 kg (mengikat Quantity Profil di BoM) -. Shelter WTP = 13.431 kg (mengikat Quantity Profil di BoM) -. Shelter Fire Fighting = 3.203 kg (mengikat Quantity Profil di BoM) Total Harga pekerjaan : Rp. 4.450.000.000,- Dengan Unit Price : Rp. 27.969 / kg. Terbilang : Empat Miliar Empat Ratus Lima Puluh Juta Rupiah. Keterangan : x Harga belum termasuk PPn 10%. x Harga sudah termasuk PPh 3%. x Harga adalah at site Grati. x Spesifikasi dan teknikal data sesuai terlampir. x Diluar Material List dan perubahan quantity profil akan menjadi kerja tambah. x Tidak termasuk Pondasi dan Anchor x Painting Spesifikasi sesuai technical form. x Tidak termasuk Supply dan Pemasangan Grating, Handrail, Bondex, dan lain – lain diluar material
list.
Page 2 of 2
x Sudah termasuk pekerjaan pemasangan di site sesuai Material List. x Tidak termasuk pengadaan dan pemasangan roof dan cladding x Waktu penyelesaian : 4 (Empat bulan setelah terima PO dan uang muka diterima.)
-. 1 (Satu) Bulan - Engineering -. 2 (Dua) Bulan – Procurement and Fabrication (Incld Transport) -. 2 (Dua) Bulan - Construction setelah pondasi di terima.
x Syarat Pembayaran : Mengikuti hasil Minute of Meeting Negosiasi pada tanggal 24 Agustus 2017.
Demikian atas perhatian dan kerjasamanya kami sampaikan terima kasih. Hormat kami, Hendratama A. Direktur