BCivil 0 0 0Electrical 9 9 0Mechanical 2 0 0
1 SS-03 A Electrical SS-02 Pressure relative dampers to be provided NV Takreer 25
2 SS-02 A Electrical SS-02 Downloading of Programming to be carried out after PSSR NV Takreer 25
3 SS-02 C Mechanical SS-02 To put lock-nuts for all U-clamps NV Takreer 25
4 SS-02 A Electrical SS-02 20% of TB to be provided for all JB's NV Takreer 25
5 SS-02 A Electrical SS-02 Earthing to be rectified from Cable Tray to JB NV Takreer 25
6 SS-02 A Electrical SS-02 Training to be provided for Operations Team NV Takreer 25
7 SS-02 A Electrical SS-03 Pressure relative dampers to be provided NV Takreer 25
8 SS-00 C Mechanical SS-03 To put lock-nuts for all U-clamps NV Takreer 25
9 SS-00 A Electrical SS-03 20% of TB to be provided for all JB's NV Takreer 25
10 SS-03 A Electrical SS-03 Earthing to be rectified from Cable Tray to JB NV Takreer 25
11 SS-03 A Electrical SS-03 Training to be provided for Operations Team NV Takreer 25
12
13
14
15
16
17
18
19
20
21
22
23
24
Cat.: A (Before Mechanical Completion) - B (Before Commissi
Replacement of CO2 Flooding System for Fire Suppression in Sub Station
Agreement No. 12RREDR10934
COMPLETE PUNCH LIST REPORT [ELECTRICAL, MECHANICAL, DESI
TYCO DOC. NO. TFS-CAMS-CA137892-441
Open
Sl.
No
Building
No.Cat. Displin Location
Test
Pack/RFI No.Description
Issued (Takreer / TPI)
By Company D
-
8/11/2019 PSSR Punch List
2/4
TotalB C
Civil 0 0 0 0Electrical 9 9 0 0Mechanical 2 0 0 2
Cat.: A (Before Mechanical Completion) - B (Before Commissioning)
Replacement of CO2 Flooding System for Fire Suppression in Sub Stations at R
Agreement No. 12RREDR10934
COMPLETE PUNCH LIST REPORT [ELECTRICAL, MECHANICAL, DESIGN &
TYCO DOC. NO. TFS-CAMS-CA137892-441Open
Sl.
No
Building
No.Cat. Displin Location
Test
Pack/RFI No.Description
Issued (Takreer / TPI)
By Company Date
25
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
-
8/11/2019 PSSR Punch List
3/4
TotalB C
Civil 0 0 0 0Electrical 9 9 0 0Mechanical 2 0 0 2
Cat.: A (Before Mechanical Completion) - B (Before Commissioning)
Replacement of CO2 Flooding System for Fire Suppression in Sub Stations at R
Agreement No. 12RREDR10934
COMPLETE PUNCH LIST REPORT [ELECTRICAL, MECHANICAL, DESIGN &
TYCO DOC. NO. TFS-CAMS-CA137892-441Open
Sl.
No
Building
No.Cat. Displin Location
Test
Pack/RFI No.Description
Issued (Takreer / TPI)
By Company Date
52
53
54
55
56
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
-
8/11/2019 PSSR Punch List
4/4
TotalB C
vElectrical 9 9 0 0Mechanical 2 0 0 2
Cat.: A (Before Mechanical Completion) - B (Before Commissioning) -
Replacement of CO2 Flooding System for Fire Suppression in Sub Stations at Ru
Agreement No. 12RREDR10934
COMPLETE PUNCH LIST REPORT [ELECTRICAL, MECHANICAL, DESIGN & C
TYCO DOC. NO. TFS-CAMS-CA137892-441Open
Sl.
No
Building
No.Cat. Displin Location
Test
Pack/RFI No.Description
Issued (Takreer / TPI)
By Company Date