Total PetrochemicalsDeep Conversion Project Port Arthur, Texas$59,700,000 Contract Value

Fluor

20 Month Duration

818,800 Workhours

182,667 LF of Piping –Spools

10,393 Pipe Welds -233,609 Dia. Weld Inches

1,286 Hydrostatic Test Packages

• Brownfield project

• Turner set up Contractor Safety Awareness program to include all site contractors

• 134 pipe rack modules

• 2,237 tons of field erected structural steel

Zero Lost Time Accidents

Project Quick Facts