prescott district engineers reportaztransportationboard.gov/downloads/presentations/2015...mattie...

Post on 27-Jun-2020

4 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1

May 15, 2015Alvin Stump

Prescott District Engineer

2

SR 87 Truck Escape Ramp

3

SR 260 Thousand Trails – I‐17

4

US 93 Update

5

US 93 MP 185 to MP 190.51

6

Wickenburg Ranch DevelopmentUpdate

7

Tegner – Rincon Rd

8

Tegner – Rincon Rd

9

CYMPO AREA CONSTRUCTION

SR 89 WideningRD 4 NorthSR 69 Enterprise ParkwayPerkinsville

10

SR 89 / Perkinsville Road Proposed Intersection Improvements

11

SR 69 Enterprise Parkway

12

CYMPO AREA DEVELOPMENT

Prescott Valley Multiuse PathSR 169 Turn lanes at CherryRd and Old Cherry Rd/Orme RdSR 69 Main Street Signal SR 89 Deep Well Ranch Rd to SR 89A & Willow Creek Realignment

13

SR 89A – Deep Well Ranch RD

14

Prescott Valley MUP

15

I‐17 Black Canyon City –SR69 Widening

16

I‐17 Black Canyon City –SR69 Widening

17

Questions

18

top related