prepared for vincentian academy€¦ · new gymnasium entry view 18 . vebh architects new gymnasium...

Post on 12-Jul-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

VEBH Architects 0

Prepared for

Vincentian Academy November 11, 2013 Project: 170700

VEBH Architects 1 Chemistry Lab Renovation Summer 2014 Completion

VEBH Architects 2 Site Plan – Existing Site

Vincentian Academy

Classroom Trailers

Athletic Field

Main Entrance

VEBH Architects 3 Site Plan- Option 5.2

PARKING 223 SPACES 42 FUTURE SPACES 265 SPACES TOTAL

New Tiered Parking Lot

New Municipal Asphalt Pathway

Two Story Classroom Addition

New / Reorganized Parking Area With Underground Storm water Retention

Existing Tennis Courts

Pedestrian Trail

Synthetic Turf Athletic Field

Auditorium Addition 600 Seats

New Entry Signage

New Gymnasium 800 Seats

VINCENTIAN ACADEMY MASTER PLAN 9/18/13

VEBH Architects 4 Classroom Addition

VEBH Architects 5 Classroom Addition

VEBH Architects 6 Classroom Addition

VEBH Architects 7 Classroom Addition

VEBH Architects 8 Auditorium / Worship Addition Exterior

VEBH Architects 9 Auditorium / Worship Addition Exterior

VEBH Architects 10 Auditorium / Worship Lobby

VEBH Architects 11 Auditorium / Worship Assembly Format

VEBH Architects 12 Auditorium / Worship Open Floor Format

VEBH Architects 13 Exterior View Field House

VEBH Architects 14 Exterior View Field House

VEBH Architects 15 Exterior View Field House

VEBH Architects 16 New Gymnasium Lobby

VEBH Architects 17 New Gymnasium

VEBH Architects 18 New Gymnasium Entry View

VEBH Architects 19 New Gymnasium

VEBH Architects 20 Team Room

VEBH Architects 21 Exterior View Field House

Next Steps For

Vincentian Academy

top related