Setting Up Assets and PM Schedules (PPP04)

PMs Procedures and Projects Track

1 Open Internet Explorer 2 Type into the address bar wwwmaintenanceconnectioncom 3 Click Log In button 4 Enter the following

Member ID PPP_CHECKPOINT Password Checkpoint2014

Note During the seminar please do not ldquoSaverdquo while following along with a specific example unless directed to do so by your course instructor

Wireless SSID CHECKPOINT Wireless Password CHECKPOINT

Logon Instructions

Presenter Name Brandon Palana

Background information

bull Role and expertise at Maintenance Connection

bull Fun Fact

Presenter Bio

PM Assets Tab Defined

Fields and Columns

Adding Assets to Schedule

Agenda

PM Assets Tab Overview

Repair Center Filter

Use Asset Defaults

Header Action Bar

PM Assets Tab Defined

Provides a list of Assets Locations associated with the selected PM schedule

Assets added will be used for generation of Work Orders

PM Assets Tab Overview

Filters Assets displayed to specific Repair Centers

Repair Center specified on PM Asset record

Repair Center Filter

Control designates fields of Asset record that should be referenced for generation

If selected the following options will appear to choose from

Use Asset Defaults

If Indicator is not checked

bull Asset attributes from PM Asset record regardless of current value on Asset

bull Value stored with Asset at time of record creation

If Indicator is checked

bull Attributes of Asset at time of Work Order generation

Use Asset Defaults (contrsquod)

Addhellip Asset to schedule

bull Asset Lookup is used

bull Asset Location Popup for entering organizational attribute fields

Header Action Bar

Updatehellip button

bull Update same information on multiple Assets

bull Fields left blank will not be affected

Header Action Bar (contrsquod)

Removehellip Assets from schedule

bull Select single or multiple Assets and remove from PM schedule

Header Action Bar (contrsquod)

In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule

Exploring the PM Assets Tab Example

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

1 Open Internet Explorer 2 Type into the address bar wwwmaintenanceconnectioncom 3 Click Log In button 4 Enter the following

Member ID PPP_CHECKPOINT Password Checkpoint2014

Note During the seminar please do not ldquoSaverdquo while following along with a specific example unless directed to do so by your course instructor

Wireless SSID CHECKPOINT Wireless Password CHECKPOINT

Logon Instructions

Presenter Name Brandon Palana

Background information

bull Role and expertise at Maintenance Connection

bull Fun Fact

Presenter Bio

PM Assets Tab Defined

Fields and Columns

Adding Assets to Schedule

Agenda

PM Assets Tab Overview

Repair Center Filter

Use Asset Defaults

Header Action Bar

PM Assets Tab Defined

Provides a list of Assets Locations associated with the selected PM schedule

Assets added will be used for generation of Work Orders

PM Assets Tab Overview

Filters Assets displayed to specific Repair Centers

Repair Center specified on PM Asset record

Repair Center Filter

Control designates fields of Asset record that should be referenced for generation

If selected the following options will appear to choose from

Use Asset Defaults

If Indicator is not checked

bull Asset attributes from PM Asset record regardless of current value on Asset

bull Value stored with Asset at time of record creation

If Indicator is checked

bull Attributes of Asset at time of Work Order generation

Use Asset Defaults (contrsquod)

Addhellip Asset to schedule

bull Asset Lookup is used

bull Asset Location Popup for entering organizational attribute fields

Header Action Bar

Updatehellip button

bull Update same information on multiple Assets

bull Fields left blank will not be affected

Header Action Bar (contrsquod)

Removehellip Assets from schedule

bull Select single or multiple Assets and remove from PM schedule

Header Action Bar (contrsquod)

In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule

Exploring the PM Assets Tab Example

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Presenter Name Brandon Palana

Background information

bull Role and expertise at Maintenance Connection

bull Fun Fact

Presenter Bio

PM Assets Tab Defined

Fields and Columns

Adding Assets to Schedule

Agenda

PM Assets Tab Overview

Repair Center Filter

Use Asset Defaults

Header Action Bar

PM Assets Tab Defined

Provides a list of Assets Locations associated with the selected PM schedule

Assets added will be used for generation of Work Orders

PM Assets Tab Overview

Filters Assets displayed to specific Repair Centers

Repair Center specified on PM Asset record

Repair Center Filter

Control designates fields of Asset record that should be referenced for generation

If selected the following options will appear to choose from

Use Asset Defaults

If Indicator is not checked

bull Asset attributes from PM Asset record regardless of current value on Asset

bull Value stored with Asset at time of record creation

If Indicator is checked

bull Attributes of Asset at time of Work Order generation

Use Asset Defaults (contrsquod)

Addhellip Asset to schedule

bull Asset Lookup is used

bull Asset Location Popup for entering organizational attribute fields

Header Action Bar

Updatehellip button

bull Update same information on multiple Assets

bull Fields left blank will not be affected

Header Action Bar (contrsquod)

Removehellip Assets from schedule

bull Select single or multiple Assets and remove from PM schedule

Header Action Bar (contrsquod)

In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule

Exploring the PM Assets Tab Example

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

PM Assets Tab Defined

Fields and Columns

Adding Assets to Schedule

Agenda

PM Assets Tab Overview

Repair Center Filter

Use Asset Defaults

Header Action Bar

PM Assets Tab Defined

Provides a list of Assets Locations associated with the selected PM schedule

Assets added will be used for generation of Work Orders

PM Assets Tab Overview

Filters Assets displayed to specific Repair Centers

Repair Center specified on PM Asset record

Repair Center Filter

Control designates fields of Asset record that should be referenced for generation

If selected the following options will appear to choose from

Use Asset Defaults

If Indicator is not checked

bull Asset attributes from PM Asset record regardless of current value on Asset

bull Value stored with Asset at time of record creation

If Indicator is checked

bull Attributes of Asset at time of Work Order generation

Use Asset Defaults (contrsquod)

Addhellip Asset to schedule

bull Asset Lookup is used

bull Asset Location Popup for entering organizational attribute fields

Header Action Bar

Updatehellip button

bull Update same information on multiple Assets

bull Fields left blank will not be affected

Header Action Bar (contrsquod)

Removehellip Assets from schedule

bull Select single or multiple Assets and remove from PM schedule

Header Action Bar (contrsquod)

In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule

Exploring the PM Assets Tab Example

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

PM Assets Tab Overview

Repair Center Filter

Use Asset Defaults

Header Action Bar

PM Assets Tab Defined

Provides a list of Assets Locations associated with the selected PM schedule

Assets added will be used for generation of Work Orders

PM Assets Tab Overview

Filters Assets displayed to specific Repair Centers

Repair Center specified on PM Asset record

Repair Center Filter

Control designates fields of Asset record that should be referenced for generation

If selected the following options will appear to choose from

Use Asset Defaults

If Indicator is not checked

bull Asset attributes from PM Asset record regardless of current value on Asset

bull Value stored with Asset at time of record creation

If Indicator is checked

bull Attributes of Asset at time of Work Order generation

Use Asset Defaults (contrsquod)

Addhellip Asset to schedule

bull Asset Lookup is used

bull Asset Location Popup for entering organizational attribute fields

Header Action Bar

Updatehellip button

bull Update same information on multiple Assets

bull Fields left blank will not be affected

Header Action Bar (contrsquod)

Removehellip Assets from schedule

bull Select single or multiple Assets and remove from PM schedule

Header Action Bar (contrsquod)

In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule

Exploring the PM Assets Tab Example

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Provides a list of Assets Locations associated with the selected PM schedule

Assets added will be used for generation of Work Orders

PM Assets Tab Overview

Filters Assets displayed to specific Repair Centers

Repair Center specified on PM Asset record

Repair Center Filter

Control designates fields of Asset record that should be referenced for generation

If selected the following options will appear to choose from

Use Asset Defaults

If Indicator is not checked

bull Asset attributes from PM Asset record regardless of current value on Asset

bull Value stored with Asset at time of record creation

If Indicator is checked

bull Attributes of Asset at time of Work Order generation

Use Asset Defaults (contrsquod)

Addhellip Asset to schedule

bull Asset Lookup is used

bull Asset Location Popup for entering organizational attribute fields

Header Action Bar

Updatehellip button

bull Update same information on multiple Assets

bull Fields left blank will not be affected

Header Action Bar (contrsquod)

Removehellip Assets from schedule

bull Select single or multiple Assets and remove from PM schedule

Header Action Bar (contrsquod)

In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule

Exploring the PM Assets Tab Example

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Filters Assets displayed to specific Repair Centers

Repair Center specified on PM Asset record

Repair Center Filter

Control designates fields of Asset record that should be referenced for generation

If selected the following options will appear to choose from

Use Asset Defaults

If Indicator is not checked

bull Asset attributes from PM Asset record regardless of current value on Asset

bull Value stored with Asset at time of record creation

If Indicator is checked

bull Attributes of Asset at time of Work Order generation

Use Asset Defaults (contrsquod)

Addhellip Asset to schedule

bull Asset Lookup is used

bull Asset Location Popup for entering organizational attribute fields

Header Action Bar

Updatehellip button

bull Update same information on multiple Assets

bull Fields left blank will not be affected

Header Action Bar (contrsquod)

Removehellip Assets from schedule

bull Select single or multiple Assets and remove from PM schedule

Header Action Bar (contrsquod)

In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule

Exploring the PM Assets Tab Example

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Control designates fields of Asset record that should be referenced for generation

If selected the following options will appear to choose from

Use Asset Defaults

If Indicator is not checked

bull Asset attributes from PM Asset record regardless of current value on Asset

bull Value stored with Asset at time of record creation

If Indicator is checked

bull Attributes of Asset at time of Work Order generation

Use Asset Defaults (contrsquod)

Addhellip Asset to schedule

bull Asset Lookup is used

bull Asset Location Popup for entering organizational attribute fields

Header Action Bar

Updatehellip button

bull Update same information on multiple Assets

bull Fields left blank will not be affected

Header Action Bar (contrsquod)

Removehellip Assets from schedule

bull Select single or multiple Assets and remove from PM schedule

Header Action Bar (contrsquod)

In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule

Exploring the PM Assets Tab Example

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

If Indicator is not checked

bull Asset attributes from PM Asset record regardless of current value on Asset

bull Value stored with Asset at time of record creation

If Indicator is checked

bull Attributes of Asset at time of Work Order generation

Use Asset Defaults (contrsquod)

Addhellip Asset to schedule

bull Asset Lookup is used

bull Asset Location Popup for entering organizational attribute fields

Header Action Bar

Updatehellip button

bull Update same information on multiple Assets

bull Fields left blank will not be affected

Header Action Bar (contrsquod)

Removehellip Assets from schedule

bull Select single or multiple Assets and remove from PM schedule

Header Action Bar (contrsquod)

In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule

Exploring the PM Assets Tab Example

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Addhellip Asset to schedule

bull Asset Lookup is used

bull Asset Location Popup for entering organizational attribute fields

Header Action Bar

Updatehellip button

bull Update same information on multiple Assets

bull Fields left blank will not be affected

Header Action Bar (contrsquod)

Removehellip Assets from schedule

bull Select single or multiple Assets and remove from PM schedule

Header Action Bar (contrsquod)

In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule

Exploring the PM Assets Tab Example

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Updatehellip button

bull Update same information on multiple Assets

bull Fields left blank will not be affected

Header Action Bar (contrsquod)

Removehellip Assets from schedule

bull Select single or multiple Assets and remove from PM schedule

Header Action Bar (contrsquod)

In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule

Exploring the PM Assets Tab Example

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Removehellip Assets from schedule

bull Select single or multiple Assets and remove from PM schedule

Header Action Bar (contrsquod)

In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule

Exploring the PM Assets Tab Example

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule

Exploring the PM Assets Tab Example

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers

Exploring the PM Assets Tab Example (contrsquod)

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Repair Center filter is updated to include All Assets for this PM schedule

Exploring the PM Assets Tab Example (contrsquod)

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Asset is removed from schedule

Exploring the PM Assets Tab Example (contrsquod)

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Selection Box

Name

Parent Location

Route Order

Next Scheduled

Next Procedure

Enabled

Fields and Columns

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Select one or more Assets from list to update or remove

Provides revert control capability

Selection Box

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Name and ID of designated Asset displayed

Work Order generation information

Asset In-Service and PM Schedule Disabled notification

Name

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Location of Asset in the Asset Hierarchy

Field lists all locations listed above Asset Location

Parent Location

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Determines the order of Work Order generation

bull Also determines order displayed in list

bull Useful for print order

Route Order

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Displays the next scheduled date or next scheduled meter interval

bull Date can change if based on Work Order completion

Next Scheduled

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Displays next scheduled procedure to be performed for Asset

bull Helpful with multiple scheduled procedures

Next Procedure

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Indicates if schedule is enabled for individual Asset

Enabled

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Adding Assets Overview

Asset Location Module Lookup

Asset Location Popup

Adding Assets to Schedule

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Enabled Assets added to Assets tab will have Work Orders generated

Procedures also can determine which Assets will be associated with PM

Adding Assets Overview

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Addhellip button opens Asset Location Module Lookup

Use controls to find Asset(s) to be added

Asset Location Module Lookup

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Example of adding Assets to PM

Asset Location Module Lookup (contrsquod)

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Displays information to determine next scheduled maintenance

bull Route Order

bull Last Generated and Last Completed

Asset Location Popup

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

bull Meter Intervals

bull Occurrence Counter and Next Scheduled Interval Counter

Asset Location Popup (contrsquod)

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Example of Last Generated and Last Completed date

Asset Location Popup (contrsquod)

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Displays organizational attributes

bull Repair Center stock room and tool room

bull Shift

Asset Location Popup (contrsquod)

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

bull Supervisor

bull Shop department account etc

bull Enabled

Asset Location Popup (contrsquod)

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Example of field values retrieved from Asset

Asset Location Popup (contrsquod)

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule

Add Asset to Schedule Hands-On

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Locate the Root Asset (top Asset of the Tree)

Right mouse click directly on the Root Asset and select Add Asset Locationhellip

Add Asset to Schedule Hands-On (contrsquod)

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Fill in the required details for the Asset (highlighted in blue)

bull Enter PPP04TEST_YOURINITIALS for the Asset ID

bull Enter PPP04Test_YourName for the Asset Name

Save the Asset

Add Asset to Schedule Hands-On (contrsquod)

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Navigate to PM ID PPP04TEST in the Preventive Maint Explorer

Select the PM to open it in the Work Center

Navigate to the Assets Tab

Add Asset to Schedule Hands-On (contrsquod)

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Click the Addhellip button in the Action Header Bar

Add your newly created Test Asset

Add Asset to Schedule Hands-On (contrsquod)

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Review Asset generation details

Click Apply Close

Save the PM

Asset will be added to Schedule

Add Asset to Schedule Hands-On (contrsquod)

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

You have now successfully completed creating a test Asset and adding it to an existing PM Schedule

Add Asset to Schedule Hands-On (contrsquod)

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

Attach Assets to PM Schedule

Assets Tab (PM Module)

Add Asset to Schedule

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip