1

Post – Rebuild Changes

at the SFGH Campus

Beginning of Part 2 of 2

2

Campus Changes • Rebuild

• Potrero Ave. streetscape

• Campus changes after the Rebuild

• Move into new hospital

• Outpatient care centralized in existing hospital

• Retrofitting existing buildings

• New UC Research Building

San Francisco General Hospital and Trauma Center

3

Potrero Ave. Streetscape

4

New

Hospital

SFGH Campus Map

Proposed

UC

Research

Bldg Existing

Hospital

Bldg

9

Bldg.

40 Bldg

10

Bldg

20

Bldg

30

Bldg

1

Bldg

3

Bldg

80/90

Behavioral

Health

Center

Service

Bldg

Bldg

100

Parking

Garage

1”

SFGH Campus Changes

Inpatient Services Move to

New Hospital

Retrofit Existing Hospital

Outpatient Services Move to

Existing Hospital

Retrofit Buildings 80/90

Construct New UCSF

Research Building

Building 40 Used for

Construction Offices

UCSF move from Red Brick

Buildings 1, 10/20, 30/40 to

New Research Building

Retrofit Red Brick Buildings

1, 10/20, 30/40

14

SFGH Campus Changes

Inpatient Services Move to

New Hospital

Retrofit Existing Hospital

Outpatient Services Move to

Existing Hospital

Retrofit Buildings 80/90

Construct New UCSF

Research Building

Building 40 Used for

Construction Offices

UCSF move from Red Brick

Buildings 1, 10/20, 30/40 to

New Research Building

Retrofit Red Brick Buildings

1, 10/20, 30/40

15

SFGH Campus Changes

Inpatient Services Move to

New Hospital

Retrofit Existing Hospital

Outpatient Services Move to

Existing Hospital

Retrofit Buildings 80/90

Construct New UCSF

Research Building

Building 40 Used for

Construction Offices

UCSF move from Red Brick

Buildings 1, 10/20, 30/40 to

New Research Building

Retrofit Red Brick Buildings

1, 10/20, 30/40

16

SFGH Campus Changes

Inpatient Services Move to

New Hospital

Retrofit Existing Hospital

Outpatient Services Move to

Existing Hospital

Retrofit Buildings 80/90

Construct New UCSF

Research Building

Building 40 Used for

Construction Offices

UCSF move from Red Brick

Buildings 1, 10/20, 30/40 to

New Research Building

Retrofit Red Brick Buildings

1, 10/20, 30/40

17

1/4”

1/8”

1”

SFGH Campus Changes

Inpatient Services Move to

New Hospital

Retrofit Existing Hospital

Outpatient Services Move to

Existing Hospital

Retrofit Buildings 80/90

Construct New UCSF

Research Building

Building 40 Used for

Construction Offices

UCSF move from Red Brick

Buildings 1, 10/20, 30/40 to

New Research Building

Retrofit Red Brick Buildings

1, 10/20, 30/40

18

1/4”

1/8”

SFGH Campus Changes

Inpatient Services Move to

New Hospital

Retrofit Existing Hospital

Outpatient Services Move to

Existing Hospital

Retrofit Buildings 80/90

Construct New UCSF

Research Building

Building 40 Used for

Construction Offices

UCSF move from Red Brick

Buildings 1, 10/20, 30/40 to

New Research Building

Retrofit Red Brick Buildings

1, 10/20, 30/40

19

1/4”

1/8”

SFGH Campus Changes

Inpatient Services Move to

New Hospital

Retrofit Existing Hospital

Outpatient Services Move to

Existing Hospital

Retrofit Buildings 80/90

Construct New UCSF

Research Building

Building 40 Used for

Construction Offices

UCSF move from Red Brick

Buildings 1, 10/20, 30/40 to

New Research Building

Retrofit Red Brick Buildings

1, 10/20, 30/40

20

UCSF Interim Seismic Work

Proposals

12

Background Seismic Information

• City owns space, which UCSF leases or occupies in exchange for services

• UC considers SFGH an adjunct campus, subject to UC seismic policy for owned space – requires that “Poor/Very Poor” buildings be retrofitted to policy-compliant or vacated

• Seismically “Poor/Very Poor” buildings (Levels V and VI per UC Seismic Policy) occupied by UCSF labs/offices/clinics (193K ASF) in Buildings 1, 5, 9, 10, 20, 30, 40, 80/90, 100. All buildings, except Building 5, are historically significant

• UCSF will continue to occupy space in Building 3, rated “Seismically Good” (Level III)

• Consulting seismic experts recommended retrofit or vacating Very Poor buildings by 2019 and interim measures to protect life safety.

13

SFGH Campus Map and Seismic Ratings

14

Proposed UCSF Interim Seismic Work

• Temporary measures to protect the safety of workers, patients and visitors in exiting Very Poor buildings (Buildings 10 – 40 & 100) during seismic event

• Canopies over building exits (not attached to buildings)

• Landscaping or low fences at 10’ perimeter of buildings where needed

• Re-anchor some roof tile on Building 30 above exit stairway

• Clear internal exit paths and anchor interior equipment as necessary

• Timeline: As soon as City’s environmental review is completed – work may take place by end of 2013

15

16

17

Proposed UCSF Research Building at SFGH

18

Proposed UCSF Research Building

• Build New Building on B/C parking lot

– “Wet” research labs and “Dry” research and administrative offices for UCSF employees now in SFGH brick buildings (Poor/Very Poor) + off-campus leases

– Building footprint to be determined.

– Lot contains 158 parking spaces – once building footprint is determined, number of displaced spaces will be determined. We are working on a solution.

• Relocate labs and offices from Buildings 1, 9, 10, 20, 30, 40, 80/90, 100 to new B/C lot bldg.

• Replace displaced parking from B/C lot – location to be determined.

19

UCSF Research Building Site

20

21

Parking Options Under

Study

31

Next Steps: Proposed Schedule & Review Process

23

24

UC Actions

Negotiate site control with City 2013

Implement interim measures 2013

Amend LRDP & Complete EIR 2014

Approve budget, funding and design 2014

Build new B/C lot building 2016 – 2018

City Actions

Negotiate site control with UCSF 2013

Update 10-Year Capital Plan and

Institutional Master Plan 2013

SF Health Commission 2014

SF Planning Commission 2014

SF Board of Supervisors 2014

Proposed Schedule & Review Process

UCSF SFGH Community Meeting

February 11, 2013