portable control & measurement device d0727

Post on 22-Feb-2016

55 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Aviv Rosenberg Ben-Ami Zilber Supervisor: Boaz Mizrachi (Zoran) ‏. Portable Control & Measurement Device D0727. End of Part A Presentation 12/2008. Possibility of customization and extension of feature-set in HW & SW Possibility to assemble several versions of the device - PowerPoint PPT Presentation

TRANSCRIPT

Portable Control & Measurement DeviceD0727

Aviv Rosenberg Ben-Ami Zilber

Supervisor: Boaz Mizrachi (Zoran)

End of Part A Presentation

12/2008

Overview (Reminder...)A versatile, multi-purposed, portable and low-priced measurement device that can instantly measure and display results, or store data for later re-evaluation.

The device will be easy to use and will allow some degree of monitoring and control over its environment using various measurements. In addition,

Possibility of customization and extension of feature-set in HW & SW Possibility to assemble several versions of the device Friendly interface (Cell-Phone like keyboard, LCD Display) Portable and hand-held with internal rechargeable battery Support for USB and microSD card for data transfer

So Far...

Preliminary design and characterization. Found necessary HW for all features. Detailed mechanical design in a 6.1x10x2.5cm box,

with 3D model ensuring all HW can fit in such a small

device. Electrical design for all possible hardware. (in progress) Layout.

Mechanical Design

The device with closed top.Visible: Graphic LCD, Keypad, IRt/c, UV Sensor.

Mechanical Design

The device with open top.Visible: Graphic LCD, Keypad and Main PCB, USB Port.

Mechanical Design

The device with open top, LCD and Keypad removed.Visible: Main PCB, most sensors and components.

Electrical DesignFunctional Block Diagram:

Electrical DesignExample Schematic: Accelerometer

Electrical DesignExample Simulation: Pressure Sensor

LayoutSuggested main PCB layout: Top

LayoutSuggested main PCB layout: Bottom

LayoutActual main PCB layout: Top

LayoutActual main PCB layout: Bottom

To Do...

Finish PCB layout (mid of December) Send to production (January) Start basic SW while in production (~1 Month) End of production (before end of January) HW Test and Debug (1-2 Months) More SW (all remaining time)

Any Questions...?

top related