pom_company presentation-2015

Post on 07-Aug-2015

137 Views

Category:

Documents

4 Downloads

Preview:

Click to see full reader

TRANSCRIPT

2005: Established POM Precision Mold factory.

2012: Established World Top Mould CO., LTD for Large Mold.

2011: UL Certified WTP for Inj. Molding & Assembly Dep.

2010: Established World Top Technology CO., LTD

1996: Establishment of Power On Mould in Dongguan.

About us

2013: Set-up Clean Room for Inj. Molding & Assembly.

2014: ISO 13485 : 2012 certified. Take application for TS16949.

Total Employees: 358

World Top Industrial Co., Ltd.

Power On Mould

Power On Mould:

Medium Size and prototype

Mold Factory

Power On Mould:

Precision mold factory

World Top Mould:

Large size mold factory

Bring your ideas to reality

3 Mould Factories

1 Plastic Injection Molding Factory

Materials:

PA6, PA66, PC, ABS, POM, PC/ABS, PP, PA+30GF/50GF,

PP+20Talc/40Talc, PBT+30%GF, PPS+40%GF, PEEK, LCP, etc.

Clean Room Injection Molding

Clean Room Assembly

Bring your ideas to reality

1.Medical Parts Assembly

2.Electronic Parts Assembly

3.Automotive Parts Assembly

Others

Sales 100% Exported Molds to Europe, North America etc.

60 sets molds can be produced per Month.

Capacity

Capacity

2K Injection Machines are available for Mold Trial and Production.

10K class Clean Room for Injection Molding.

100K Class Clean Room for Assembly.

Capacity

Capacity

3 Tooling Workshops.1 injection and assembly workshopCapacity

What we do

Business scopePlastic injection mould90%

Multi cavity mold 2K mold

Stack mold Multi-Hyd.Core pulls mold

Business scope

Die casting mould5% Silicone rubber mould5%

Business Categories

Automotive parts55%

Ventilator Mirror holder Fuel pipe

Blower WheelOthers GrilleGMT9XX Flange Cup

Business Categories

Medical parts15%

Medical consumables Medical Instrument

Medical Instrument Medical Instrument

Business Categories

Electronic parts15%

Business Categories

Home Appliances10%

Business Categories

Others Parts5%

Business Introduction

Turnover

0

2,000,000

2008 2009 2010 2011 2012 2013 2014

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

14,000,000

16,000,000

其中塑胶产品占80%

(USD)

70% for mold, 30% for plastic parts

2015

13M

8M

8.5M

10M

11

M

13M

15M

15.5

M

EST.

16M

Business Introduction

Marketing distribution

USA

Canada

Brazil

Peru

Japan

Sweden

Holland

DanmarkEngland

GermanyFrance

SwitzerlandSpain

Israel

Main Customer

Mercedes-Benz

BMW

Volkswagen

Ford

Dorel France

ATMOR

Leviton Mfg.

Roush Manufacturing

Interacoustics A/S

Tec Air

Engineer Department Power On Mould has a professional staff of 40 that have design & manufacturing

experience of moulds for exporting to Europe, USA, etc. POM has built a large

design and manufacturing database to ensure prompt, effective and accurate design

and manufacturing.

We use UG software and can

deal with STEP, Parasolid, IGES,

DWG, DXF, CADL, NFL, SAT

data etc.

Project Engineers---------------------1001

Mould designers-----------------------3002

CAM\CNC Programmers------------1003

Engineer Department

3D Product design

2D/3D Mould design

A good design is the heart of a

mould. Therefore, POM has

invested in both people and

technology to ensure that our

design meets your highest

expectation.

Manufacture Department

POM has been well-known in the

industry for capability to

manufacture simple and complex

moulds, as well as injection

molding. POM builds tools from

single cavity to 192 cavities.

POM’s continuous investment in

mould making facilities has kept

the company as a worldwide-

preferred mould supplier.

Precision Mold FactoryMedium-sized Mold Factory

Large Mold Factory

Large mould factory

Manufacture Department

Manufacture Department

Manufacture Department

Manufacture Department

Manufacture Department

Inj.Molding Department

Project Management

Power On Mould appoints a project

manager to each individual project and client.

The project manager is in charge of the entire

project from start to finish and provides

direct communication to the client.

All project management teams communicate

in English and are qualified engineers

Project Management

Flowchart

Project Management

Schedule & Dim Inspection Report

Q.C DepartmentQuality Assurance

Quality moulds yield quality parts. POM has a high degree of in-process

Control on mould manufacturing and final mould qualification.

Q.C DepartmentMain QC Procedure

1.Mold Design control

2.Steel Dimension Inspection

3.Electrodes inspection

4.Steel Hardness Checking

5.Mold Pre-Assembly inspection

6.Samples dimension and structure inspection

7.FAI/CPK/SPC Study, PPAP partially.

8.Mold Pre-shipment final Inspection

Q.C DepartmentQuality Facility

Customer Service

Quality requirements

On time delivery

Favorable Cost

Reliability

Total customer

satisfaction

Our product meets the

following criteria

Customer first,

Excellent in quality,

Delivery on time,

Competitive price.

Power On Mould will continue to meet and exceed our customers' expectations by seeking ways to improve our technology and process, by providing ongoing training for our employees, to ensure the high quality in our products and service!

Our service promises

Service tenet

Customer Service

Mold Inspection&Approval Report

Full 3D Mold Drawing

BOM

FAI

Steel Certification

Heat Treatment Certification

2D Assembly Mold Drawing

HRS Specification

Wiring Diagram

Service Menu

Contact us

E-Mail:

Sales: sales@poweron-mould.com

Engineer: engineer@poweron-mould.com

Complaint: Gary.chen@poweron-mould.com

Tel&Fax:

Tel: +86 (769)-82068892 ext.68

Fax: +86 (769)-87735374

Address:

Address: Sha Ni Bridge, Qing Xi Town, Dongguan City,

Guangdong Province, China.

Qinghu Industrial Zone, Qingxi Town, Dongguan

City, Guangdong Province, China.

Website: www.poweron-mould.com

Thank you ^_^

Bring your ideas to reality

top related