Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Sand

31 * Das (2016), Principles of Foundation Engineering, 8th edition

Michael Tomlinson and John Woodward (2008), Pile Design and Construction Practice.

High-displacement driven = Large displacement piles

Low-displacement driven = Small displacement pilesBored or jetted = Replacement pilesCoyle and Castello (1981)

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Sand

32

High displacement driven piles

Low displacement driven piles

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Sand - SPT

33 * Das (2016), Principles of Foundation Engineering, 8th edition

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Sand - CPT

34 * Das (2016), Principles of Foundation Engineering, 8th edition

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Sand - Example

* Das (2016), Principles of Foundation Engineering, 8th edition

= 6.1 m

f (z = 0) = 0

f (z = 6.1) = 75.9

f ( 6.1 < z < 20) = 75.9 constant (= 75.9) from 6.1 m to 20 m

Next page

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Sand - Example

* Das (2016), Principles of Foundation Engineering, 8th edition

40

50

45

≃ 0.4

by projection

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Sand - Example

37 * Das (2016), Principles of Foundation Engineering, 8th edition

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Sand - Example - CPT

38

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Clay - Lamda (𝜆)

39

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Clay - Alpha (𝛼)

40

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Clay - Alpha (𝛼)0.25

This is shown graphically in Figure 9.21. For cuy !o9 $ 1,

41

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Clay - Beta (𝛽)

42

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Clay - Example

43

cupa

= 0.25

cupa

= 0.4

cupa

= 0.9

↵ = 0.87

↵ = 0.51

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Clay - Example

44

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Clay - Example

45

442 Chapter 9: Pile Foundations

Example 9.7Refer to the pipe pile in saturated clay shown in Figure 9.24. For the pile,

a. Calculate the skin resistance sQsd by (1) the ! method, (2) the " method, and (3) the # method. For the # method, use $R9 5 308 for all clay layers. The top 10 m of clay is normally consolidated. The bottom clay layer has an OCR 5 2. (Note: diameter of pile 5 457 mm)

b. Using the results of Example 9.2, estimate the allowable pile capacity sQalld. Use FS 5 4.

SolutionPart a(1) From Eq. (9.59),

Qs 5 o!cu pDL

Table 9.13 Typical Values of Angle of Friction $9 of Rocks

Type of rock Angle of friction, f9 (deg)

Sandstone 27–45Limestone 30–40Shale 10–20Granite 40–50Marble 25–30

Groundwatertable

A1 5 72

A2 5 512.16

A3 5 1392.8

z

(a) (b)20 m 180.23

98.3310 m

3 m48

!9o (kN/m2)

3 mSaturated clay

Clay7 m

10 m

Diameter 5457 mm

cu(2)"sat

5 40 kN/m2

5 17 kN/m3

cu(1)"

5 25 kN/m2

5 16 kN/m3

Claycu(3)"sat

5 90 kN/m2

5 18 kN/m3

Figure 9.24 Estimation of the load bearing capacity of a driven-pipe pile

Copyright 2016 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.

a MethodAccording to the

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - Clay - Example

46

Piled Foundation - Pile Capacity - Skin Resistance (Qs) - CPT

47

Piled Foundation - Pile Capacity - Qp - Rock

48

Piled Foundation - Pile Capacity - Negative Skin Friction

49

Piled Foundation - Pile Capacity - Negative Skin Friction

50

Piled Foundation - Pile Capacity - Negative Skin Friction - Example

51

Piled Foundation - Pile Capacity - Negative Skin Friction - Example

52

Piled Foundation - Group Piles - Group Efficiency

53

Piled Foundation - Group Piles - Group Efficiency

54

Piled Foundation - Group Piles - Group Efficiency

55

Piled Foundation - Group Piles - Group Efficiency

lb to kip in to feet

(next page)

56

Piled Foundation - Group Piles - Group Efficiency

8 8.57