bill of quantity (boq) - gujarat urja vikas nigam office/02052011...bill of quantity (boq) power...
Post on 06-Mar-2018
240 Views
Preview:
TRANSCRIPT
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
Section-9
Bill of Quantity (BoQ)
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
A) SCADA/DMS control centre (BoQ)
Sl.No. Specification Towns under RAPDRP project area
Equipment Unit Baro
da
Ah
md
ab
ad
Rajk
ot
Jam
nagr
Bh
avn
agar
Su
rat
Tota
l
A1 Server/ workstation Hardware
1 SCADA/DMS server No. 2 2 2 2 2 2 12
2 FEP server with interface switches No. 2 2 2 2 2 2 12
3 ISR server No. 2 2 2 2 2 2 12
4 NMS server No. 2 2 2 2 2 2 12
5 DTS server No. 1 0 0 0 0 0 1
6 Developmental server No. 1 1 1 1 1 1 6
7 Communication Server No. 2 2 2 2 2 2 12
8 Web/Directory server No. 2 2 2 2 2 2 12
9 Workstation with dual TFT Monitors No. 2 2 2 1 1 3 11
10 Remote VDUs with one TFT Monitors No. 8 7 9 5 5 7 41
11 Developmental console with one TFT No. 2 2 2 2 2 2 12
12 DTS/Workstation Console with dual TFTs No. 2 0 0 0 0 0 2
13 DLP based Video Projection system with 2X3 Module
configuration with each module at least 67" diagonal with
common projector
Set
1 1 1 1 1 1 6
Storage & Backup Devices
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
14 External RAID Mass storage device ( for 2 months online
backup)
No. 1 1 1 1 1 1 6
15 External DAT drive (160/320GB) No. 1 1 1 1 1 1 6
Switches/Routers
16 Layer II switch (SCADA/DMS LAN) No. 2 2 2 2 2 2 12
17 Layer II switch ( Development system LAN &DTS) No. 1 1 1 1 1 1 6
18 Routers for interfacing (ITDC and IT CC),SLDC ,FRTU
No. 1 1 1 1 1 1 6
19 Router at remote VDU No. 8 7 9 5 5 7 41
20 Firewall & network IPS Nos.
Other Active devices
21 GPS Time synchronization system set 0 2 2 2 2 2 10
22 Time, day & date digital displays set 0 1 1 1 1 1 5
Printers
23 A3 Color inkjet printer No 1 1 1 1 1 1 6
24 B/W Laser printer No 1 1 1 1 1 1 6
25 Color Laser printer No 0 0 0 0 0 0 0
Security system (DMZ)
26 Web server with load balancing and mail server No. 2 2 2 2 2 2 12
27 Mail server No. 0 0 0 0 0 0 0
28 Router No. 2 2 2 2 2 2 12
29 Firewall & network IDS,IPS No. 2 2 2 2 2 2 12
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
30 Layer II switch No. 2 2 2 2 2 2 12
Cabling System
31 Cable, Jacks etc. Lot 1 1 1 1 1 1 6
32 Any other hardware to meet functional /performance
requirement of MTS(One Plotter and Scanner)
Lot 1 1 1 1 1 1 6
A2 Mandatory Spares for Control Centre
33 5% of A1 % 5 5 5 5 5 5 5
A3 Software for Control Centre
34 SCADA software Lot 1 1 1 1 1 1 6
35 ISR Software Lot 1 1 1 1 1 1 6
36 DMS software Lot 1 1 1 1 1 1 6
37 DTS software Lot 1 0 0 0 0 0 1
38 Developmental software Lot 1 1 1 1 1 1 6
39 Network Management Software Lot 1 1 1 1 1 1 6
40 WEB /Network security software(Incl in web server) Lot
41 RDBMS package (incl in ISR) Lot
42 GIS Adaptor/Engine for importing data from GIS system
under IT system
Lot 1 1 1 1 1 1 6
43 Any other software to meet functional /performance
requirement of MTS (OMS etc)
Lot
A4 Network Charges
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
44
Network Connectivity Charges for Link for 1 year post
commissioning(MPLS-VPN)
p.a per
RTU/FRTU/FPI
B) SCADA/DMS DR Centre
SL.No. Specification Towns under RAPDRP project
Equipment Unit Baro
da
Ah
md
ab
ad
Rajk
ot
Jam
nagr
Bh
avn
agar
Su
rat
Tota
l
B1 DR server
1 DR server Nos 2 2
2 Communication Server Nos 2 2
3 Workstation with one TFT Monitors Nos 2 2
B2 Storage & Backup Devices
4 External storage device Nos 2 2
5 External DAT drive Nos 2 2
B3 Switches
6 Layer II switch (DR LAN) Nos 2 2
Routers
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
7 Router for interfacing at SCADA DMS Centre Nos 1 1
B4 Printers
8 Color inkjet printer Nos 2 2
9 B/w Laser printer Nos 2 2
10 Color laser printer Nos 0 0
B5 Cabling System
11 Cable, Jacks etc. Nos 1 1
12 Any other hardware to meet functional /performance
requirement of MTS
Nos 0 0
B6 Mandatory spares for DR Centre %
13 5% of B1+B2+B3+B4+B5 5 5
B7 Software for DR Centre
14 RDBMS (Included in server) 0 0
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
C) Remote terminal unit
Items Towns under RAPDRP project
SL.No. Equipment Unit Baro
da
Ah
md
ab
ad
Rajk
ot
Jam
nagr
Bh
avn
agar
Su
rat
Tota
l
1
RTU comprising panels, racks, sub-racks, Power Supply
modules, CPU analog / digital input & control output ,module as
per specification interfacing equipment, required converters &
all other required ,items/accessories including complete wiring
for all modules for locations mentioned below Nos
0 17 15 8 9 24 73
2 MFTs Nos 119 332 346 207 171 516 1691
3 CMRs Nos 1563 2918 3615 1982 1659 4922 16659
4 HDR Nos 424 851 904 534 438 1489 4640
5 Dummy Breaker Latching Relays Nos 15 17 15 8 9 24 88
6 Weather transducer - Wind speed Nos 1 1 1 1 1 1 6
7 Weather transducer – rainfall Nos 1 1 1 1 1 1 6
8 Weather transducer - Humidity Nos 1 1 1 1 1 1 6
9 Weather transducer -Temperature Nos 1 1 1 1 1 1 6
10 Weather transducer -Wind Direction Nos 1 1 1 1 1 1 6
11 modem Nos 0 0 0 0 0 0 0
12 Router Nos 0 17 15 8 9 24 73
13 Single TFT PC for LDMS with all accessories and UPS Nos 15 17 15 8 9 24 88
14 1 B/W laser printer Nos 15 17 15 8 9 24 88
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
15
Any other hardware to meet functional /performance
requirement of
MTS
Nos 0 0 0 0 0 0 0
C2 Local Data Monitoring System (LDMS)
16 LDMS Nos
17
Any other software to meet functional /performance
requirement of MTS Nos 0 0 0 0 0 0 0
C3 TEST EQUIPMENTS for RTU
18
RTU Database Configuration & Maintenance Software
tool Nos 0 1 1 1 1 2 6
19
Master Station cum RTU Simulator & Protocol analyser
software tool Nos 1 1 1 1 1 2 7
20
Laptop PC for above software tools along with
interfacing hardware including Hub Nos 1 1 1 1 1 2 7
C4 MANDATORY SPARES FOR RTU
5% of c1 Nos 5 5 5 5 5 5 5
Sub - Total (mandatory spare) -D4 Nos
C5 Bandwidth Charges Nos
Network Connectivity Charges for Primary Link (SCADA/DMS
main control centre) Nos
Sub - Total (bandwidth charges) -D5
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
RTU I/O COUNT Baroda Town
Sl.No STATION SS DS DC AI CMR HDR MFT
COM
MOD
ULE
(Serial
)
DI
MODUL
E
DO
MODULE
AI
MODUL
E
1 ATLADRA 71 7 24 8 95 26 6
2 CHHANI-A 65 9 20 8 65 20 7
3 CHHANI-B 72 7 24 8 90 25 6
4 GAJARAWADI 59 9 23 8 70 20 5
5 GORWA 67 8 20 8 65 18 5
6 GOTRI 69 9 23 8 74 24 7
7 HARNI 71 8 24 8 90 26 7
8 INDRAPURI 76 7 27 8 100 26 8
9 MAKARPURA 79 12 28 8 110 27 6
10 MOTIBAUG 72 10 25 8 70 25 7
11 NAVLAKHI 72 8 24 8 85 20 7
12 SAMA 58 6 11 8 63 15 5
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
13 SUBHANPURA 85 12 30 8 95 25 8
14 TARSALI 74 8 20 8 90 26 7
15 VIDYUTNAGAR 90 15 37 8 140 30 9
Total 1080 135 360 120 1302 353 100
Total with 20% spare 1296 162 432 144 1563 424 119
RTU I/O COUNT :Ahmdabad Town
COM DI DO AI
SNO STATION SS DS DC AI CMR HDR MFT MODULE MODULE MODULE MODULE
1 Naroda 256 40 74 8 280 75 30
2 Odhav 125 19 34 8 128 36 15
3 Muthiya 131 19 36 8 134 39 16
4 Kanbha 182 28 54 8 194 57 23
5 Bhat 146 23 42 8 153 45 19
6 Adalaj 192 29 56 8 205 59 21
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
7 Science city 134 21 38 8 139 41 16
8 Bopal 154 24 46 8 162 49 19
9 Sanathal 111 18 32 8 113 35 14
10 Sabarmati 76 12 20 8 72 23 8
11 Kathwada 118 19 34 8 122 38 13
12 Koba 118 19 34 8 121 33 12
13 Khoraj 118 19 34 8 121 37 15
14 Shela 118 19 34 8 124 34 14
15 Ambli 118 19 34 8 121 37 15
16 GopulDham 118 19 34 8 122 32 14
17 Unali 118 19 34 8 121 39 13
TOTAL 2333 366 670 136 2432 709 277
TOTAL WITH
20% SPARE 2800 440 804
164 2918 851 332
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
RTU I/O COUNT Rajkot Town
SNO STATION SS DS DC AI CMR HDR MFT COM
MODUL
E
DI
MODUL
E
DO
MODU
LE
AI
MODU
LE
1 Dudhasagar 316 50 94 8 377 96 38
2 Ghanteshwer 171 26 50 8 208 52 18
3 GIDC 262 39 76 8 312 78 31
4 KOTHRIYA 111 17 30 8 139 32 12
5 Laxminagar 219 33 64 8 263 66 26
6 Mavdi 59 9 16 8 79 18 6
7 Navagam 182 28 54 8 221 56 22
8 Popatpara 74 12 20 8 97 22 8
9 Punitnagar 256 39 76 8 306 78 31
10 Raiyadhar 139 22 40 8 170 42 17
11 Vajdi SS 198 30 58 8 239 60 23
12 Shsashtrimaidan 168 26 50 8 205 52 20
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
13 University Road 80 12 22 8 103 24 9
14 Nilkanth 119 19 36 8 149 38 13
15 Racecourse 119 19 36 8 145 39 14
TOTAL 2473 381 722 120 3013 753 288
TOTAL WITH 20% SPARE 2968 458 867 144 3615 904 346
RTU I/O COUNT Jamnagar Town
SNO STATION SS DS DC AI CMR HDR MFT COM
MODULE
DI
MODULE
DO
MODULE
AI
MODULE
1 NAGHEDI 258 39 74 8 292 76 28
2 SATRASTA 228 34 66 8 258 68 27
3 M P SHAH 197 29 58 8 222 60 23
4 C SS 153 23 46 8 172 48 19
5 HAPA 191 28 56 8 215 58 21
6 B SS 255 39 74 8 290 76 30
7 MORKANDA 102 17 30 8 115 32 14
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
8 Power house 80 13 24
8
88 27 11
Total 1464 222 428 64 1652 445 173
Total With 20%
Spare 1757 267 514
77 1982 534 207
RTU I/O COUNT : Bhavnagar Town
COM DI DO AI SNO STATION SS DS DC AI CMR HDR MFT
MODULE MODULE MODULE MODU
LE
1 Chitra 168 26 50 8 203 55 21
2 City SS 104 17 30 8 130 34 13
3 Nari road 212 33 64 8 254 68 27
4 Sidasar 169 26 50 8 204 52 20
5 Vartej 125 19 38 8 153 44 15
6 Sardar nagar 215 39 66 8 263 66 29
7 Desai nagar 73 12 22 8 94 24 10
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
8 Valket gate 66 10 18 8 82 22 8
TOTAL
1132 182 338 64 1383 365 143
Total with 20% Spare 1359 219 406 77 1659 438 171
RTU I/O COUNT : Surat Town
COM DI DO AI SNO STATION SS DS DC AI CMR HDR MFT
MODULE MODULE MODULE MODU
LE
1 66 KV TAPI 190 30 55 8 176 60 20
2 66 KV SERTHANA 156 26 30 8 171 52 18
3 66 KV PUNA 164 26 50 8 171 52 23
4 132 KV BHESTAN 230 40 75 8 245 80 35
5
66 KV PANDESRA -
A 164 26 55 8 171 52 15
6
66 KV PANDESRA -
B 187 30 70 8 176 65 18
7 66 KV GOVALAK 180 27 54 8 175 56 15
8 66 KV GODADARA 180 26 54 8 179 56 15
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
9 66 KV UDHNA 185 26 53 8 182 52 17
10 66 KV SACHIN-A 185 26 50 8 183 52 17
11 66 KV SACHIN-B 158 26 51 8 175 57 15
12 66 KV KHAJOD 110 20 55 8 145 52 10
13 66 KV KAMREJ 167 27 58 8 171 54 18
14 66 KV LASKANA 164 26 50 8 165 53 18
15 66 KV VESU 168 26 47 8 171 52 18
16 66 KV PAL 175 27 45 8 176 52 18
17 66 KV VARIYAV 173 26 50 8 175 48 18
18 66 KV KOSMADA 170 26 53 8 171 48 23
19 Pala 125 20 35 8 150 37 18
20 Ichapore 157 26 50 8 160 51 20
21 Kosad 120 21 35 8 150 36 17
22 Jiav 120 22 35 8 150 35 10
23 Vanz 170 26 50 8 171 52 24
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
24 Sachin-C 145 20 33 8 143 37 10
TOTAL 3943 622 1193 192 4102 1241 430
Total with 20% Spare 4732 746 1432 231 4922 1489 516
Note: - SS : Single status input, DS : Double status input for CBs, DC : Digital Control Output Trip / Close/Raise /lower, CMR :
Contact Multiplying Relay, HDR : Heavy Duty Relay, MFT : Multi function Transducers, CM: Communication Module , DI : Digital
input , DO : Digital Output AI: Analog module
Note: 1. MFT provide data that is to be acquired by RTU on Modbus/or IEC protocol for Voltage (phase to phase and phase to
neutral),Current (phase and neutral), Active Power, Reactive Power, Apparent Power, Power Factor, Frequency, active energy
(import & export), reactive energy (import & export) etc.
2. CMRs shall be mounted in the existing C&R panels. Wherever the space is not available in the existing panels the same
shall be mounted in the RTU panels. Heavy Duty Relays shall be provided for Digital outputs for CBs and shall be mounted
in the RTU panels itself.
3. The RTU shall be equipped for the above specified I/O (analog input MFT), digital input & digital output) point points, which
includes 20 % spare for future use . These 20 % spare points shall be terminated on terminal blocks in RTU panel.
4. All protection relay/Alarm points & CBs shall be considered for SOE.
5. Point counts include three alarms per station for auxiliary system and fire, which shall be interfaced to RTU.
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
D) Feeder Remote terminal Unit(FRTU)
Towns under RAPDRP project area
Item Unit Baro
da
Ah
md
ab
ad
Rajk
ot
Jam
nagar
Bh
avan
nagar
Su
rat
Tota
l
D1 FRTUs
Mini pole mounted FRTU base equipment along with
enclosure suitable to work in open environment (Adequate
protection from water & dust) , racks, sub-racks, Power Supply
modules with power backup , I/o modules, CPU,
interfacing equipment, required converters & all other
required items/accessories including complete wiring for all
modules for locations mentioned BELOW Set
1024 1446 950 829 493 292 5034
MFTs Nos 1254 1736 1141 995 592 351 6069
CMRs Nos 10932 11060 7440 6070 4695 3507 43704
HDR Nos 5445 6794 5736 3715 3409 2454 28696
Dummy breaker latching Relay Nos 1024 1446 950 829 493 292 5034
Modem Nos 0 0 0 0 0 0 0
Any other ITEM to meet functional /performance requirement of
MTS 0 0 0 0 0 0 0
D2 TEST EQUIPMENTS for FRTU
FRTU Database Configuration & Maintenance Software tool Nos 4 5 4 4 2 1 20
Master Station cum RTU Simulator & Protocol analyzer software
tool Nos 4 5 4 4 2 1 20
Laptop PC for above software tools along with
interfacing hardware including Hub Nos 4 5 4 4 2 1 20
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
D3 MANDATORY SPARES FOR FRTU % 5 5 5 5 5 5 5
D4 Bandwidth Charges
Network Connectivity Charges for Primary Link
(SCADA/DMS main control centre)
*CMRs and HDR are indicative and it may be considered as per requirement
FRTU IO List
Discom Town
Name
Type of
equipment
Locations SS DS DC AI CMR HDR MFT COM
MODULE
DI
MODULE
DO
MODULE
AI
MODULE
RMU 724 6082 869 2607 1738 894
MGVCL Baroda Sectionalizer 300 2520 360 360 360 10572 5445
360
RMU 661 5553 794 2380 1587 794
UGVCL Ahmdabad Sectionalizer 785 6594 942 942 942 10118 6794
942
RMU 482 4049 579 1736 1157 579
Rajkot Sectionalizer 468 3932 562 562 562 6878 5736
562
RMU 304 2554 365 1095 730 365
Jamnagar Sectionaliser 525 4410 630 630 630 5440 3715
630
RMU 289 2428 347 1041 694 347
PGVCL Bhavnagar Sectionaliser 204 1714 245 245 245 4450 3164
245
RMU 292 2453 351 1052 701 351
DGVCL Surat Sectionaliser 0 0 0 0 0 3507 2454
0
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
1. MFT provide data that is to be acquired by FRTU on Modbus/or IEC protocol for Voltage (phase to phase and phase to
neutral),Current (phase and neutral), Active Power, Reactive Power, Apparent Power, Power Factor, Frequency, active energy
(import & export), reactive energy (import & export) etc.
2. CMRs shall be mounted in the existing C&R panels. Wherever the space is not available in the existing panels the same
shall be mounted in the FRTU panels. Heavy Duty Relays shall be provided for Digital outputs for CBs and shall be mounted
in the FRTU panels itself.
3. The FRTU shall be equipped for the above specified I/O (analog input MFT), digital input & digital output) point points, which
includes 20 % spare for future use . These 20 % spare points shall be terminated on terminal blocks in FRTU panel.
4. All protection relay/Alarm points & CBs shall be considered for SOE.
5. Point counts include three alarms per station for auxiliary system and fire, which shall be interfaced to FRTU.
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
E) Communication Equipments
E2) Communication system - VPN (MLLN/ MPLS) Broadband
R-APDRP Project Area
Sl.No Item Unit Baro
da
Ah
md
ab
ad
Rajk
ot
Jam
nagar
Bh
avan
nagar
Su
rat
Tota
l
1 Network Connectivity Charges for 2Mbps MLLN-broadband Link Nos. 0 0 0 0 0 0 0
2 Network Connectivity Charges for 64Kbps MLLN-broadband Link Nos 0 0 0 0 0 0 0
3
Network Connectivity Charges for 2Mbps MPLS-broadband Link
(RTUs,SLDC, ,IT DC, CCC ,DR and Remote VDU) Nos 12 28 28 17 18 35
138
4 Network Connectivity Charges for 64Kbps MPLS-broadband Link Nos 0 0 0 0 0 0 0
5
Network connectivity charges for FRTUs &FPIs on
3G/CDMA/GPRS Nos 1865 2046 1776 1354 743 292
8076
6
Network Connectivity Charges for existing leased line from BSNL
(Actual avg charges per link per annum) Nos 15 0 0 0 0 0
15
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
E3) Communication system - MAR/Radio
R-APDRP project Area
Item Unit Baro
da
Ah
md
ab
ad
Rajk
ot
Jam
nagar
Bh
avan
nagar
Su
rat
E3A Hardware/ Equipment
MAR/Radio terminal equipment No. 0 0 0 0 0 0
Antenna 0 0 0 0 0 0
OMNI directional antenna 0 0 0 0 0 0
unidirectional antenna 0 0 0 0 0 0
Radio modems 0 0 0 0 0 0
E4) Wireless communication modems
R-APDRP Project Area
E4A Item:RMU,Sectionalizer& FPI Modems
Unit
Baro
da
Ah
md
ab
ad
Rajk
ot
Jam
nagar
Bh
avan
nag
ar
Su
rat
Tota
l
1 GPRS No. 0 0 0 0 0 0 0
2 CDMA 0 0 0 0 0 0 0
3 EDGE 0 0 0 0 0 0 0
4 3G No 1865 2046 1776 1354 743 292 8076
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
F) Auxiliary Power supply
Item Unit Baro
da
Ah
md
ab
ad
Rajk
ot
Jam
nagar
Bh
avan
nagar
Su
rat
Tota
l
F1 Main Equipments - Control centre
1 UPS with suitable rating running in parallel redundant mode* (20 KVA)
Set of
two 1 1 1 1 1 1 6
2
VRLA type Battery banks for above UPS for minimum 30 mts.backup
duration (set included in Above) set
3
DC Power Supply (DCPS) system based on SMPS (for 20 A
load plus charging current@10% capacity) Set 1 1 1 1 1 1 6
4
Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup
(Set included in above) Set
F2 Main Equipments - DR Centre
Main Equipments
5 UPS with suitable rating running in parallel redundant mode* 1 1
6
VRLA type Battery banks for above UPS for minimum 30 min. backup
duration
7
DC Power Supply (DCPS) system based on SMPS (for 20 A load plus
charging current@10% capacity) 1 1
8
Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup
(Set included in above)
F3 Mandatory Spares for UPS % 5 5 5 5 5 5 5
F4 Mandatory Spares for DCPS % 5 5 5 5 5 5 5
F5 For RTU / Data Concentrator / Communication Eqpts.
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
9 DC Power Supply (DCPS) system based on SMPS 17 15 8 9 24 73
10
Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup
(included above)
F6 For FRTU
11 48V DC Power Supply (DCPS) system based on SMPS 1024 1446 950 829 493 292 5034
12
Battery bank for above DCPS (VRLA Type) for minimum 4
hrs backup
F7 Remote VDU Locations
13 UPS (2 kVA ) No 8 7 9 5 5 7 41
List of mandatory spares shall be provided by the contractor upto 5 % of the total cost to meet the availability requirements.
Failure to maintain the same would be liable for suitable penalty. Inventory for the same shall be maintained during FMS period of
5 years.
G) Training
Sr. No Description Duration in days No. Of Trainees
A. Operator’s Training
1 Operator for SCADA/DMS Control Centre 5
1 Per workstation
console/ shift at
control centre
2 Instructor for DTS 10 3
B. Maintenance Training
1 Computer Hardware & System Software 10 2
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
2 Application Software (SCADA/DMS) 10 2
3 RTU & FRTU 5 5
4 Database & display development 5 2
6 Auxiliary Power Supply 3 2
7 Communication System including NMS 5 2
Note: Minimum training requirement are given in G, however the no.of days may change as per actual requirement
FMS
S.No. Description Duration
1 FMS charges for SCADA/DMS system (maintaining overall system availability as
per MTS)
Five Year
2 FMS charges for SCADA/DMS system (maintaining availability individual
hardware & non –critical functions as per MTS)
Five Year
3 Total FMS charges Five Year
: 1. The necessary spares required for maintenance of the system during FMS shall be provided by the contractor.
However, the consumables shall be provided by the owner.
2. FMS shall include all the supplied hardware & software under the project.
Power Finance Corporation
SCADA/DMS, system under Part A –R-APDRP
I) IMPLEMENTATION SCHEDULE
S. No. Items Completion Schedule
from the Award of
Contract
1 SCADA/DMS System 18 months
BIDDER SHALL PROVIDE IMPLEMETATION SCHEDULE INDICATING MILESTONES
*******************************End Of Document****************************
top related