P1545311/24/14 Meeting

What we did well● Depth and thoroughness of work● Documentation of work● Team Work● Others?

What we need to improve on● Last minute work● Team brainstorming critical design features● Documenting work● Others?

What’s NextDetailed Design/Gate Review1. EMA Detailed Design2. Secondary Requirement Design3. Test Plans4. Finalize Risks & Bill of Materials5. Make Edge Pretty6. Test Transducer

EMA Detailed Design● Analyze each component

o Screw calculatoro Ansys of mounting fixturingo Locating pins?o Load cell connection

● Team brainstorm critical components ● Select critical component design with justification ● Consult subject matter experts on designs● Finalize 3D models & 2D drawings● Identify long lead items● Expand controls flow diagram if needed

Secondary Requirements● Identify secondary requirements● Consult morph for possible solutions● Explore options strengths and weaknesses(pugh)● Create 3D/2D designs for implementation● How will information be displayed?

o Excitation voltage required?o Signal conditioning?o Sampling rate?

● Bill of materials*● Risk assessment*

*these will be added to the main document later

Test PlansEMA to have extensive test plans

● Receive parts● Install software and get operational● Communicate with EMA through controller

○ Simple movement○ Force test

● ImplementSecondary requirements are simpler but still thorough

● Bench top testingo Example: Thermocouples in hot water, compare TC readings with thermometer

Keys:Estimated times for each process helps ganttThoroughness here will lead to easier MSDII

EDGE● Make sure there isn’t anything left from the template● Update roles● Update gantt charts● Add risk assessment ● Add project plans

Test Transducer● Theoretical Analysis

o How much displacement and force will x amount of volts produce?

o Call supplier and get quote on partso Based on forces iterate fixture designo Update B.O.M.o Test plan o Risk assessment

Addition of Physical Calendar• Show

progress

• Keeps DDR in sights

Addition of Physical Action Items• Allows us to see who’s

doing what

• Allows us to see our status of completion

• If your looking for more tasks you can see who to ask