ndt/welding inspector
Post on 09-Apr-2018
301 Views
Preview:
TRANSCRIPT
-
8/8/2019 NDT/WELDING INSPECTOR
1/9
RESUME
NDT/MECH/WELDING INSPECTOR
SENTHIL KUMAR.M
E-MAIL : - MSK2112@GMAIL.COM: -YESKEYEM@HOTMAIL.COM
MOB : - +966 563794657(KSA)RESI : - +91 4172 245511(INDIA)
A) SUMMARY:-
More than 8 years extensive experiences asNDT / MECH / WELDING Inspector in the field of
off/on-plot pipeline in water, oil, gas & petro-
chemical sectors in various SAUDI
ARAMCO,SABIC projects in KSA & INDIA
B) QUALIFICATION DETAILS:-Diploma in Electrical & Electronics Engineering
(2002)
(Directorate of Technical Education, Chennai)
Diploma In Welding Engineering & Technology
(Directorate of Distance Education)
mailto:MSK2112@GMAIL.COMmailto:YESKEYEM@HOTMAIL.COMmailto:MSK2112@GMAIL.COMmailto:YESKEYEM@HOTMAIL.COM -
8/8/2019 NDT/WELDING INSPECTOR
2/9
C) SPECIALIZATION CERTIFICATES:-
CSWIP 3.1 WELDING INSPECTOR CERT.NO:-
32669
(The welding institute.UK)
MECHANICAL INSPECTOR/WELDINGINSPECTOR
(Approved by SAUDI ARAMCO)
SAUDI ARAMCO personnel No (SAP): -
70009105
NDT INSPECTOR
ASNT Level II in,
Radiographic testing,
Radiographic film interpretation,
Dye penetrant testing,
Magnetic particle inspection,
Ultrasonic testing,
COMPUTER& OTHER SKILLS:-
MS OFFICE PACKAGE,
AUTOCAD AND BASICS OF COMPUTERS
FAMILIAR WITH INTL CODED & STANDARDS LIKE
AWS D 1.1, ASME B 31.3, ASME B 31.4,ASME B 31.8, ASME IX,API 1104, API 570, API 598, API 1110, API 5L, API 6D & SAUDIARAMCO ENGG STANDARDS.
-
8/8/2019 NDT/WELDING INSPECTOR
3/9
WORK EXPERIENCES :-
D1) NAME OF THE COMPANY :-
Mohd. AL -barghash AL-mansouri trading&contracting company,(AN ISO CERTIFIEDCOMPANY)
P.O Box NO:- 31996,AL-khobar, KSA
INCLUSIVE DATE: -
OCT 2007 TO TILL DATE,
NATURE OF BUISNESS: -
Construction of Pipelines,
DEPARTMENT: -
Q/A & Q/C (PPD)
POSITION : -
Q/A & Q/C INSPECTOR (Mech, Welding)
NDT CO-ORDINATOR & RTFI
CONTACTS FOR REFERENCE: -
MR.OMAR MERCADO (QC SUPERVISOR)
+966 5643811446
MR. BALASANKAR .S (OPERATIONS MANAGER)
balasankartuv@gmail.com
SAUDI ARAMCO PROJECTS HANDLED:-
TIE-IN NYYM # 501,502,503,504,505,506,507,509,510,
511, 512, 36, 37,38,39,41 PWI WEL HEAD & LATERAL
http://mail.live.com/?rru=compose%3Faction%3Dcompose%26to%3Dbalasankartuv@gmail.com&ru=http%3A%2F%2Fcid-bf92c00f16a0cc91.profile.live.com%2Fdetails%2F%3FContactId%3D815c629c-0c96-423c-89d6-3487c4b7b811%26ru%3Dhttp%253a%252f%252fbl154w.blu154.mail.live.com%252fmail%252fContactMainLight.aspx%253fContactFilter%253d2%2526n%253d1239686320http://mail.live.com/?rru=compose%3Faction%3Dcompose%26to%3Dbalasankartuv@gmail.com&ru=http%3A%2F%2Fcid-bf92c00f16a0cc91.profile.live.com%2Fdetails%2F%3FContactId%3D815c629c-0c96-423c-89d6-3487c4b7b811%26ru%3Dhttp%253a%252f%252fbl154w.blu154.mail.live.com%252fmail%252fContactMainLight.aspx%253fContactFilter%253d2%2526n%253d1239686320 -
8/8/2019 NDT/WELDING INSPECTOR
4/9
TIE-IN NYYM OIL #103,104,114,118,119,120,121,122,123,123,124,20
WELL HEAD & LATERAL TO NYYM GOSP # 1
16 NYYM OIL TRUNK LINE #4 TO MANIFOLD # 4 TOGOSP# 1
16 NYYM OIL TTRUNK LINE# 8 TO MANIFOLD # 8 TOGOSP# 1
16 / 12 NYYM OIL TRUNK LINE # 3 TO MANIFOLD TOGOSP#1
TIE IN OF 8 IN SDGM - 563 OIL F/L TO SDGM GOSP-3
SDGM-704 JAUF GAS WELL TIE-IN TO SDGM-462(WELLHEAD/FLOWLINE/BLOWDOWN PIPING/ANNULIRISER/CASING ANNULI/CORROSION INHIBITORLINE/CHEMICAL INJECTION LINE)
TIE-IN QATIF OIL WELL 316 TO 317 @ DRILL SITE P-13
HAWIYAH RELIEF HEADER LK 16GAS TRUNKLINE TIE-IN
TOJAUF/KHUFF GAS GATHERING MANIFOLD
TIE IN ABQQ-540 OIL WELL TO ABQQ GOSP-6
INSTALLATION OF HIPPS SYSTEM ON 12 WELLS IN ANDRAND SDGM FIELD
TIE-IN 8 ANDR-567 OIL WELL TO ANDR GOSP-4
TIE-IN 6 ANDR-560 OIL WELL HEAD TO ANDR GOSP-6
INSTALLATION OF HIPPS SYSTEMS IN ANDR-382 ANDANDR-430
WATER INJECTION 20'' HEADER EXT. FOR WELL ABQQ-291
WATER INJECTION 20'' HEADER EXT. FOR WELL ABQQ-221...
DUTIES & RESPONSIBILITIES: -
-
8/8/2019 NDT/WELDING INSPECTOR
5/9
Review and update Welding Procedure and WeldersQualification.
Responsible for all QA/QC Inspection of pipes, Mechanicaland Structural works in Saudi Aramco projects.
Prepared all reports and documentation as required by theCompany, client and QA/QC Program.
Preparation of welding procedure specification (WPS) inaccordance With ASME section IX.
Co-ordination for the qualification of the procedure and
performing Mechanical testing and preparation ofprocedure qualification Record (PQR)
Organizing the welder's qualification and preparation ofthe welder Performance qualification Record (WPQR).
Monitoring welder performance, Review of MTO andmaterial Inspection reports
o Receiving inspection of the raw material like plates
pipes, pipe Fittings and structural steel etc.
o Supervised/ Mechanical and piping works such as
Well head piping, Tie-in, manifold, TST/L, TR/L andFlow lines.
o Responsible for developing of QA/QC program foreach project in accordance with the scope of workand project requirements.
o Co-ordination with NDT inspection agencies for the
performance of the NDT evaluation and interpretationof Radiographic films
-
8/8/2019 NDT/WELDING INSPECTOR
6/9
o Supervised and performed holiday testing and heat
shrink Sleeve application for FBE, PE and PP coatedpipes.
o Performed inspection activities, receiving of incomingProject raw materials, material preparation, fit-up andassembly, Welding inspection. Before during andafter, dimensional Painting and dispatch of completedspools.
o Supervised and performed inspection during and
after Hydro test of pipeline and checked documents
such as Approved Hydro test procedure, calibration ofrelief valve, Pressure gauge, temperature andpressure recorder before Hydro test.
o Supervised hydro testing of valves such as body test
and seat Test and performed calibration of pressuregauge.
o Execution of all required inspections with assigned
projects And liaison with the clients inspectors for theinspections
o Preparing inspection reports/ test result
D2) NAME OF THE COMPANY:-
INDUSTRIAL SUPPORT SERVICES, Dammam,KSA
INCLUSIVE DATE : - JUN 2006 TO JUL2007,
NATURE OF BUISNESS : - NDT INSPECTION,
-
8/8/2019 NDT/WELDING INSPECTOR
7/9
DEPARTMENT : - Shut-down inspection,
POSITION : - Ndt-inspector,
PROJECTS HANDLED:-
SAUDI-CHEVRON PHILIPS PETRO-CHEMICAL CO.,(2006 T/A),
PETRO-KEMYA PETRO-CHEMICALS (2007 T/A),
SHARQ PETRO-CHEMICALS (2007 T/A),
IBN-BAYTAR PETRO-CHEMICALS (2007 T/A),
JUBAIL PETRO-CHEMICALS (2007 T/A),
JOBS HANDLED:-
Perform in RT, MPI, LPT, UTTG and act as athird-party inspector during ndt, Hydro-test,leak-tests, and prepare & submit results toclients.
D3) NAME OF THE COMPANY:-
J.K INSPECTION SERVICES,
BHEL ANCILLARY UNIT, RANIPET-6
INCLUSIVE DATE : - DEC 2004 TO APR2006,
NATURE OF BUISNESS: - Ndt Inspection Services,
POSITION : - Ndt Technician,
-
8/8/2019 NDT/WELDING INSPECTOR
8/9
CLIENTS : - BHEL & BHEL ANCILLARYUNITS,
THIRUMALAI CHEMICALS,PARRY-WARE, GREAVES TRACTOR UNIT
JOBS - HANDLED:-
Perform in radiographic test and developing films, interpret thefilms and prepare reports o the clients,
Perform in LPT, MPI, UTTG
D4) NAME OF THE COMPANY:-
SAFE TEST ENTERPRISES,
MRPL ROAD, SURATHKAL, MANGALORE,KARNATAKA
INCLUSIVE DATE : - DEC 2002 TO OCT2004,
NATURE OF BUISNESS : - Purging of vessels, valvesinspection
Third-party inspection,
POSITION : - Ndt & third-party inspector,
CLIENTS : - HPCL, BPCL, IOCL
CONTACTS FOR REFERENCE: -
MR.SEKAR.M (HPCL T/M) msekar@hpcl.com
mailto:msekar@hpcl.commailto:msekar@hpcl.com -
8/8/2019 NDT/WELDING INSPECTOR
9/9
MR.PANDIYAN (BPCL T/M)pandiyanm@bharatpetroleum.co.in
JOBS - HANDLED:-
PERFORM AS THIRD-PARTY INSPECTORDURING VALVE TESTINGS (HYDRO-TEST)
PERFORM AS THIRD-PARTY INSPECTORDURING PURGING OF L.P GAS VESSELS,
PERFORM AS THIRD-PARTY INSPECTORDURING NDT (MPI, PT)
PREPARE & SUBMIT REPORTS TO THECLIENTS
E) PERSONNEL DETAILS :-
SEX : MALE
MARITAL STATUS : SINGLE
DATE OF BIRTH : 15 -10-1983
NATIONALITY : INDIAN
LANGUAGE ABILITY : ENGLISH, HINDI, TAMIL,
KANNADA, MALAYALAM
PASSPORT NO : F 4410583
SENTHIL KUMAR.M
ABQAIQ, KSA
mailto:pandiyanm@bharatpetroleum.co.inmailto:pandiyanm@bharatpetroleum.co.in
top related