ND Oil & Gas Research Program North Dakota Pipeline Authority

Justin J. Kringstad January 23, 2014 - Bismarck, ND

ND Drilling Stats

2 JJ Kringstad - North Dakota Pipeline Authority

US Williston Basin Oil Production - 2013

3

3 JJ Kringstad - North Dakota Pipeline Authority 3

November 2013

Estimated Williston Basin Oil Transportation

4

4 JJ Kringstad - North Dakota Pipeline Authority 4

Cushing $96.74

Brent $108.18 WTI + $11.44

Crude Oil Prices – Jan. 22, 2014

5 JJ Kringstad - North Dakota Pipeline Authority

Estimated Williston Basin Oil Transportation

6

6 JJ Kringstad - North Dakota Pipeline Authority 6

Estimated ND Rail Export Volumes

7 JJ Kringstad - North Dakota Pipeline Authority 7

Williston Basin Oil Production & Export Capacity, BOPD

Production forecast is for visual demonstration purposes only and should not be considered accurate for any near or long term planning.

8 8 JJ Kringstad - North Dakota Pipeline Authority

Sandpiper Pipeline Open Season

9

9 JJ Kringstad - North Dakota Pipeline Authority 9

North Dakota Pipeline Company LLC - formerly known as Enbridge Pipelines (North Dakota) LLC • Open Season Dates: November 26, 2013 – January 24, 2014 • 225,000 BOPD ND Capacity to Clearbrook, MN (24”) • 375,000 BOPD Clearbrook, MN to Superior, WI (30”) • In-service Date: Q1 2016 • Project cost: $2.6 Billion

Map: Enbridge

Simple Terms Orange – Challenges on existing infrastructure Blue – Lack of pipelines

GREEN – % of gas captured and sold Orange – % flared from wells with at least one mcf sold. Blue – % flared from zero sales wells

November 2013 Data – Non-Confidential Wells Statewide

Solving the Flaring Challenge

10 JJ Kringstad - North Dakota Pipeline Authority

*

*Hess Tioga Gas Plant shut-in for 140 MMCFD expansion starting in November

Capturing the 11% Faster Well Connections

11 11 JJ Kringstad - North Dakota Pipeline Authority

12

ND Gas Gathering Statistics

12 JJ Kringstad - North Dakota Pipeline Authority

13

ND Gas Plant Capacity

13 JJ Kringstad - North Dakota Pipeline Authority

New NDPA Natural Gas Report

14 JJ Kringstad - North Dakota Pipeline Authority

Faster Connections

Target New Wells

High Volume Areas

Conclusion 1: Getting the right wells connected quickly is moving in the right direction

15 JJ Kringstad - North Dakota Pipeline Authority

Understanding Which Wells Are Flaring

16 JJ Kringstad - North Dakota Pipeline Authority

Capturing the 11% Catching Early Production

17 17 JJ Kringstad - North Dakota Pipeline Authority

Gas Plant Capacity

Looping & Compression

Maintenance & Pigging

Conclusion 2: Finding a way to quantify system enhancements would greatly assist in

understanding the timeline

18 JJ Kringstad - North Dakota Pipeline Authority

Justin J. Kringstad, Director North Dakota Pipeline Authority

600 E. Boulevard Ave. Dept. 405 Bismarck, ND 58505-0840

Phone: (701)220-6227

Fax: (701)328-2820 E-mail: jjkringstad@ndpipelines.com

Websites:

www.pipeline.nd.gov www.northdakotapipelines.com

19 JJ Kringstad - North Dakota Pipeline Authority

Contact Information

19

top related