NAT accessibilité

New rolling stock in Ile de France

Regional Structuring Bus Network RIR

Extended provision: night services

New services tramway T3 and tram-train T4

STIF Paris Ile de France

New rolling stock in Ile de France

2

mars 2006 matériel roulant SNCF 3

SNCF Rolling Stock Pulled VehiclesDouble decker automotiveRolling stock to cast aside

6% (4 ans)Z2N (20900) Z2N (20500 24% (13 ans) 6%Z2N (8800) (21ans) 7%

Z2N (5600) (23 ans)

MI79

(25 ans)5%

Z6400 (29 ans) 8%

5% (37 ans)Z5300Z6100 9% (36 ans) (28 ans)VB2N 14%

7% (8 ans) MI2N (22500)

(28 ans) 9%RIB/RIO

As of 2006

20% are climate controlled (Clim) 40% have a 10 years design (Design)

ClimDesign

Design

Design

ClimDesign

Design

4

New SNCF Rolling Stock in Ile de France NAT

• The SNCF fleet (3900 vehicles) is in average 22 years old

• Since decentralisation (effective march 2006), STIF contributes to the funding of the rolling stock and is involved in the procurement process:

• Project includes:

– 172 specifically designed trainsets for IDF (NAT) as a first phase of procurement of new rolling stock (20% of the fleet)

– 24 AGC trainsets, and

– the renovation of 137 double deck trainsets.

5

NAT

• Funding is 50% STIF (including State funds) and 50% SNCF for a total amount of € 2billion.

• Specifications of the NAT are the result of a cooperation between the operator SNCF and STIF,

• Emphasis has been put on technical performances and capacity, comfort, security and accessibility.

NAT

6

7

NAT accessibility

• The floor of the vehicle is 97cm high • to accomodate low platfoms (55cm) NAT is equipped wih

removable steps,• to ensure level access for wheel chair users, a specific sliding

plate at the first vehicle bridges the horizontal gap provided the station platform has been raised (partially or totally) at 92cm,

• on board visual and audio information is given by screens and dynamic map showing the route in progress.

8

NAT accessibility

NAT accessibility

9

Level access by raising the platform Boarding plate to bridge horizontal gap

10

NAT accessibility

11

NAT accessibility

Regional Structural Bus Network RIR

12

13

Regional Structural Bus Network

• Objectives:– Draw a recognisable bus network for the users at regional level

– Take into account urban development as it is an the need for bypasses

– Apply same criteria for selecting the routes

– Deliver same quality of service and frequency across the Structural Bus Network

– Allow space for improvements according to first results

– Budget for the first year: €70million

14

Regional Structural Bus Network

• Description:– The project is the result of a large consultation with operators

(RATP,SNCF,Optile) and counties

– In the outer suburbs, bus routes connect main interchanges and activity centres

– In the close suburbs emphasis is put on bypasses to allow suburban to suburban juorneys

– Emphasis in Paris is to connect the city to the suburbs

– Regional Structural Bus Network is supplementary to the rail network

– Regional Structural Bus Network may evolve

15

Regional Structural Bus Network

• Implementation:– Outer suburbs: 39 routes and 9 million km more per year

– Close suburbs : 13 bypass routes plus 7 radial routes representing 3,1million km more per year

– Paris : 10 Mobilien routes (existing trunk lines) plus 8 routes connecting with the suburbs representing 2,5 million km per year

16

Regional Structural Bus Network in outer suburbs

Regional Structural Bus Network close suburbs

17

Stuctural Regional Bus network in Paris

18

Extended provision: night services

19

20

Night services

• Since 2007, on the metro network :– trains run until 2:15 am on Fridays, Saturdays and in the night

before bank holidays

– the 1 hour extension represents 1 366 612 train –km more

– and an increase of 3,1% of the level of provision in the contract STIF-RATP

– the decision applies to 296 stations and involves 600 employees working successively between 2:20 am and 3:15 am

Night services

Noctilien bus service:• every night from 0:30 am to 5:30 am

• every 17mn on week days and every 10 mn on week ends

• 35 lines: 2 circles lines in Paris, 8 suburban to suburban lines and 25 radials from Paris to suburbs

• 175 municipalities served with 1950 stops

• 2,6 million passengers since 2005

• operational costs € 8,5 million

• extension is planned to cover at night the RER network

21

New services: Tramway and Tram-train

22

Tramway back in Paris

New tramway line T3:• Since the opening on 16 December 2006

T3 is very popular among travellers

• More than 5 million passengers in 3 month time or 80000 passengers/day (30000 /day with previous bus line)

• Every 5mn in peak hours

• Runs from Pont du Garigliano to Porte d’Ivry

• Investment costs: 215million € infrastructure plus 44million € for urban renewal and 53 million € for rolling stock

• Carefully designed the project is a symbol of clean and modern transport on a previously noisy and polluted avenue

23

Tram-train T4 Aulnay-Bondy

• 8 km line serving eastern suburbs of Paris

• former heavy rail line has been closed then upgraded (double tracks all long)

• 11 stations : 8 existing, 3 new

• New rolling stock Avanto Siemens

• Headway at peak hours reduced from 15 to 6 mn

• Investment costs : infrastructure 55 million € rolling stock 70 million €