• Presentation• Project Review• Transit Center Needs• Transit Center Concepts

• Q&A and Feedback on Concept Elements• Next Steps

• Q&A

Agenda

3

Project Goals• Develop a Master Plan that

will:

• Identify a preferred solutionthat will eliminate the at-grade crossing at CastroStreet and the railroad tracks

• Improve the functionality ofthe Transit Center andsupport future growth

4

• Accommodate the expected growth in train service andstation usage

• Train service to more than double over the next 10–15 years

• Relieve delays at the railroad crossing on Castro• Railroad gate blockages in peak hours to double

• Improve safety and access for pedestrians and bicyclists• Support the economic vitality and future growth of

downtown Mountain View• Accommodate changes in transportation patterns and

services

Why Is It Needed?

5

Re-direct Castro at Tracks

6

Where we are now

7

Mountain View Transit Center

8

• Almost 9,000 daily Caltrain boardings and alightings• Almost 3,000 daily VTA bus and LRT boardings and

alightings• Almost 1,500 daily shuttle boardings and alightings

Existing Activity

9

AM Activity at Transit Center

10

PM Activity at Transit Center

11

• Insufficient shuttle space• 147 shuttles visit transit center in peak periods each day

• Insufficient bike parking• Bikes attached to trees, poles, and benches due to lack of available bike

parking

• Challenging pedestrian movements• Over 300 pedestrians and bicycles cross Central Expressway in peak

hours

• Parking infringes on neighborhoods• Parking lot fills up between 7 and 8 AM

• No pick-up/drop-off area• Pick-up/drop-off occurs in the parking lot

Current Transit Center is Over Capacity

12

• Electrification of Caltrain will increase train frequencyand ridership

• Longer trainsets to increase Caltrain capacity• Year 2040 ridership projected to be 97% greater than Year

2015 levels

• Modified bus routes with VTA Next Network• Anticipated further growth in shuttles• Continued growth in bicycle and walk access• Surge in ride hailing services (Uber/Lyft)

Future Needs

13

• Grade-separated pedestrian crossings of Central Expressway andCaltrain tracks

• Extended Caltrain platforms• Bus and shuttle area to allow for future growth• Curb space for pick-up/drop-off• Parking garage – shared parking with downtown• Enclosed bike parking areas• Public spaces• Areas for transit-oriented development

Components of the Master Plan

14

• Developed 4 concepts• Differ in the following ways:

• Location of platforms• Configuration of bus/shuttle area• Location of pick-up/drop-off areas• Location and configuration of parking garage• Parking garage access• Plaza configuration and size

• Concept 1 reflected least change from existing. Council StudySession suggested focusing on Concepts 2-4 as they best achieveproject objectives

Development of Concepts

15

Concept 1

16

Concept 2

17

Concept 3

18

Concept 4

19

Evaluation of Concepts• Bicycle/pedestrian circulation• Bus/shuttle operations• Flexibility for future needs• Ease of transfers• Integration with downtown Mountain View and Moffett area• Auto access and circulation• Cost• Construction impacts• Phasing feasibility

20

• All Concepts provide enough curb space for anticipated futureneeds

• Concept 4 provides the most curb space with lots of pick-up/drop-offspace on Evelyn

• Concept 2 is likely the least expensive to construct• Concept 4 provides a slightly larger plaza than other concepts• Concept 4 provides greatest space for development

opportunities due to parking below ground• Because of underground parking, Concept 4 is highest cost

• Central Expressway ramp would be utilized by approximately25% of existing auto access to station

• Cost of ramp estimated at $25-$30 Million

Preliminary Evaluation Findings

21

Pick-Up/Drop-Off Areas and Routes

22

Pick-Up/Drop-Off Areas and Routes

23

Pick-Up/Drop-Off Areas and Routes

24

Central Expressway Access

25

Central Expressway Access

26

Central Expressway Access

27

Parking

28

Bicycle/Pedestrian Access

29

Bicycle/Pedestrian Access

30

Bicycle/Pedestrian Access

31

Bicycle/Pedestrian Access

32

Bicycle/Pedestrian Access

33

Bicycle/Pedestrian Access

34

Bicycle/Pedestrian Access

35

Bicycle/Pedestrian Access

36

Plaza Configuration

37

Transit-Oriented Development

38

Next Steps• Refinement of Concepts• Concept Evaluation• City Council Study Session - March 21st

• Prepare Master Plan• City Council - May 23rd

39