mohammad taher_qa-qc piping-welding
Post on 16-Apr-2017
228 Views
Preview:
TRANSCRIPT
CURRICULAM VITAE
MOHAMMAD ABU TAHER
APPLY FOR : QA/QC (Senior Piping Welding Inspector)
PERSONAL DETAILS NATIONALITY : BANGLADESHI (SINGAPORE PERMANENT RESIDENT)DATE OF BIRTH : 27 JULY 1982LANGUAGES : BENGALI, ENGLISH & HINDICONTACT NO : +65 82333415, 84001048EMAIL : taherma82@gmail.com
SUMMARY OF CAREER & EXPERIENCE:
Present project FPSO OKHA (Woodside) at Sembawang shipyard. Accumulated Approximately 15 Years plus Experience with QA/QC (Mechanical, Piping, Tank Construction), Vendor Inspection of (Marine Engineering, Mechanical Engineering, Construction & Manufacturing Engineering) Excellent Knowledge and Experience in Welding Technology & Painting Inspection, Safety, Fabrication/ Erection of Piping & Pressure vessel and Mechanical Installation activities in Oil/Petrochemical construction projects, Live Plant and Shipyard. Assignments in the Construction and Expansion Projects of Oil Refineries, Power & Petrochemical Plants, Marine base Construction & Fabrication in Bangladesh, Singapore, and Brazil. Well aware and worked in ISO 9001 systems. Capable to prepare, establishes the procedures and Control the Execution and Quality Piping & welding with GDP.
EDUCATION Bachelor of Engineering (Hons) Mechanical Engineering
University of Sunderland (UOS) U.K.
Diploma in Mechanical Engineering BTEC Higher National Diploma (HND), Pearson U.K.
Adv. Diploma in Industrial Engineering & Management NGEE ANN Polytechnic, Singapore.
Diploma in Marine Engineering Bangladesh Institute of Marine Technology (BIMT)
Higher Secondary Certificate (HSC) ‘A’ level Equivalent R.K.Chowdhary Degree College, Bangladesh Secondary School Certificate (SSC) ‘O’ level Equivalent Bawany Adarsha Biddyalaya, Bangladesh
PROFICIENCY CERTIFICATION COURSES (WELDING TECHNOLOGY)
Senior Welding Inspector (CSWIP-3.2.2) Level 3
MOHAMAD ABU TAHER
Page 1
CURRICULAM VITAE
Welding Inspector (CSWIP-3.1) Level 2
Institute name: The Welding Institute (TWI), UK
ASNT Level II (RT, UT, MT, PT)
WeldTeck Inspection Services (S) Pte Ltd. Singapore
Material Test (Ferrite Number) on SS Steel
Ferritescope MP30E-S. NDT Instruments (S) Pte Ltd.
QUALITY MANAGEMENT SYSTEM (QMS):
IRCA AUDITOR / LEAD AUDITOR ISO 9001:2008
Quest Certification Private Limited, India. February 2011
OCCUPATIONAL SAFETY & HEALTH SUPERVISORY COURSES:
Risk Management Course
Absolute Kinetics Consultancy, May 2011. Singapore
Building Construction Supervisor Safety Course BCSS (MOM)
(Absolute Kinetics Consultancy, May 2011. Singapore
Oil/Petrochemical Industry Safety Course for Supervisors (MOM)
NTUC Learning Hub, December 2009. Singapore
Exxon Mobil Leadership in safety Workshop
100, Exxon Mobil Chemical, March 2009. Singapore
Safety Instruction Course for Supervisor (Manhole) MOM
NTUC Learning Hub, September 2009. Singapore
Construction Safety Orientation Course (CSOC) MOM
NTUC Learning Hub (Ministry of Manpower Accredited)
Fire Prevention & Fire Fighting. ii) Elementary First Aid
(STCW Code Table A VI/1-3 & 1-2), Singapore Polytechnic
PROFESSION ENGINEERING & TECHNICIAN MEMBERSHIP
Registered Senior Welding Inspector EngTech
Cert No: R/45741, Engineering Council UK
MOHAMAD ABU TAHER
Page 2
CURRICULAM VITAE
Full Member of Welding Technology SWS (F1881)
Singapore Welding Society
General Member of Engineering Organization. ID: 00048 (IDMEABS)
Competencies and Skills Workforce in SPT Project in Exxon Mobil
Achieving Best Supervisor Certificate month of July 2010 In-Refinery in the SPT Project Exxon Mobil Plant
Achieving the Certificate of Appreciation 20, 000, 000 Safe Work Hours without LTI in SPT ExxonMobil.
Achieving the Certificate of Completion Code of Business Conduct & Ethics 2009 & 2010 Training in FW.
Achieving the Certificate of Appreciation 14 Million Safe Work Hours without LTI in SPT ExxonMobil.
EMPLOYMENT HISTORY
Company Name: Intertek Industry Services
Owner Representative: Woodside Energy Ltd (WEL)
Position: Senior Piping Welding Inspector
Project Name: FPSO OKHA
Date: 10 Nov 2015 to till now
Responsibility:
Study the construction drawing, ISO drawing, Update the spread sheet, register welder list, WPS and monitoring the daily progress and report to the higher authority of WEL. Attended the Quality and Productivity meeting with the main contractor Sembcorp.
Daily inspection for Super Duplex Stainless Steel (A790 Gr UNS S32750), LTCS A333, A106 Gr. B Piping materials inspection heat no, cutting mark up, length and beveling of the fittings such as Elbow, Flange, Tee, Reducer for fit-up preparation .
Daily inspection for spools fit-up, no’s of tack welding, root land, Hi-Lo, alignment, dimension & orientation as per ISO drawing, 2D and model for various system e.g Seawater line, export gas line for jumper deck, offtake system, glycol system etc.
Daily in process welding monitoring, surveillance the welding technic, process, welding parameters such verify and record for interpass temperature, the heat input <100OC for root, cold, hot & capping pass against the approved WPS. Demonstrate site engineer for production and quality inspector of SCM.
Guide to the sembcrop shipyard QA/QC, welding foreman, supervisor for sound welding, purging gas flow rate, and record the Oxygen (O2) level <0.5%, sponge plug position, cleanness the joint, filler rod with Acetone prior to the welding activities & workmanship.
Monitoring the daily progress fit-up & welding, keep surveillance for the repair welding with approved repair procedure.
MOHAMAD ABU TAHER
Page 3
CURRICULAM VITAE
Final welding visual inspection, surveillance for the NDT request. Review the Radiography test Films & report and witness the Dye Penetrant (PT) test.
Daily update & track the record and direct report to the woodside QA/QC lead. Review the inspection report, endorsed and surveillance the MDR filling.
Inspection pipe support, base plate blasting with surface profile, painting (primer, 2nd coat, final coat with IP paint according to AS, SSPC & ISO standard and project ITP, spec.
Position: Technical Specialist (Mechanical/Piping)
Client Representatives: Woodgroup PSN / GS E&C Korea / Technip Malaysia / Saipem Italy
Date: Oct 2015 to Nov 2015
Responsibility:
Client and Third Party Inspector for assignments on Site and at Vendor Facilities for O&G MNC clients.
Represent Owner for Inspection and FAT. Onsite inspection for welding and NDT operations. Review WPS & PQR and ensure that specifications are adhered to. Checking of consumables used in welding to ensure compliance with specification. Monitor the Welding activities (Before, During & After) and Visual Inspection of welds. Onsite inspection to witness installation of Equipment. Third Party Inspection for Mechanical Tests (Destructive and Non-Destructive Test) and Chemical Analysis
Tests. Final Inspection, Hydrostatic Test and Pre-shipment Inspection of pressure vessels. Functional Acceptance Test of Valves. Final, Packaging and Pre-shipment Inspection of Gaskets, valves. Inspect and ensure that all work is executed as per client’s requirement and specifications. Review progress against the vendor schedule and provide daily inspection report. Review respective documents, specifications, standards, calibration certificates and approved construction
drawings and all other applicable requirements and regulations as stated in client’s specifications. Prior to shipment, perform document review on PO/packing list/material certificates for authenticity and
compliance as per client’s P.O. Check quantities, shipping mark etc. Issue inspection release note (IRN) upon satisfactory final inspection.
Company Name: GL Noble Denton (DNV-GL Oil & Gas)
Position: Mechanical / Piping Inspector (Owner Rep)
Project Name: Jack up Rig Drilling Construction B-Class (B337 (CP Latina), B338 (CP Latina), B339 (Arab Drilling), B340 (UMW Naga 5, B349 (Pemex), B350 (Pemex), B376 (UMW Naga 8) & B371 & B372 (Fecon #1 #2), B351, B352 (Arab Drilling)
Date: 05-03-2013 to Sep 2015
Responsibility:
Attend with joint inspection for Vendor supply equipment with Procurement Quality Plan.
MOHAMAD ABU TAHER
Page 4
CURRICULAM VITAE
Review and verified construction drawing such as VCD, GA, P&ID under customers approved supplier list. To
check all the certificates, Equipment physical condition such as JIS check sheet as per Project specification or
VCD. The inspection covers the Mechanical/ Structural parts dimension, piping, spare parts and workmanship
for Valve, Diverter, Oilfield Equipment etc. Prepare the Quality Observation report, Non Conformity Reports &
Punch list if the items not comply the specification.
To make sure that specific references to technical specification requirements and applicable codes and
standards such as ASME IX, B31.3 & Section VIII, Div 1, API 16D, 16C, API 6A referenced in the
specification, Purchase order and contact etc.
Attended daily basis Inspection for Piping alloy material ASTM A519 Gr 4130 such as high pressure tubing
welding with GTAW, GMAW, FCAW & SMAW welding process, preheat & PWHT, erection, line check, hydro
testing & reinstatement
Surveillance the in-progress work, project progress as per project planning schedule.
Manage the work, monitoring the Keppel Fels QMRS, piping status, NDT progress, RT film review. Guiding
the QA/QC Inspector to achieve the project & class ABS requirement.
Attended weekly management & production meeting
Surveillance and monitoring the vessel endurance test, cantilever skidding test and drill floor load test, jack up
trail and incline test before ship delivery.
Review the final reports, WPS, punch items, PCM and prepare weekly progress report, direct report to project
Manager and Director.
Company Name: Shaw Stone & Webster Asia, Inc. (EPCM)
Position: (Piping Welding Inspector & Pre Commissioning)
Project Name: SPT Olefins Recovery Project (ExxonMobil)
Date: 24-07-2012 to 01-03-2013
Responsibility:
Review the daily basis piping test packages for pre-test and post test. Review the welder performance
and NDT completion as per line class and SHAW, GP’s requirement.
Pre Commissioning and daily site basis piping inspection, surveillance, line walk-down raise and clear the
punch items.
To check and make sure before and after post test all the welding, NDT, PMI, PWHT and erected
materials MTR completed, and reported in accordance and comply the ASME & ASTM code.
Plan, organize, coordinate and monitoring and Leading subcontractor QC and give guidance to perform
the job as accordingly.
Daily completed package updated list report to direct ExxonMobil QA/QC Lead and Shaw stone QA/QC
Manager.
Attend the QC internal audit with ExxonMobil and weekly progress meeting.
MOHAMAD ABU TAHER
Page 5
CURRICULAM VITAE
Attend inspection for pre commissioning activities, such as flange box-up, re-instatement according code
ASME 16.5 & 40 and coordinate with ExxonMobil Representative.
Witness leak test, Tightness test, and final box-up, prepares rejection report for the damage items and
equipments.
Company Name: Foster Wheeler Asia Pacific Ltd (EPCM) Position: (Senior Welding Inspector)
Project Name: LanXess BTR Singapore Project
Date: 07-Dec-2011 to 23-July-2012
Responsibility:
Daily welding visual inspection for Carbon Steel, Stainless Steel 316L/304L, 22% Cr Duplex Stainless
Steel, and 25% Cr Super Duplex Stainless Steel.
Witness for PQR for the Materials such as Hastelloy C ASTM B622 (P No. 43) to A 106 Gr B (P No.1),
Duplex Stainless Steel ASTM B729 UNS N08020 beside having experience SA 790 UNS S31803 (P
no.P10H) and 25% Cr Super Duplex Stainless Steel UNS S32550 and ASTM A790 UNS S32750 with the
welding process GTAW.
Monitoring the surface preparing before welding, and checked the welding parameter, purging and heat
input rate.
Monitoring the Quality of work such as Piping, Painting, Fireproofing as per code SSPC & NACE.
Review the daily welder welding Dia-inch, Weekly welder performance and RT film review, rejection rate.
PWHT report, hardness test report and coordination on Safety matter at site Radiography test.
To make sure job is being carried out as per Foster wheeler and Laxness project spec and subcon
approved procedure.
Attend internal quality audit and meeting. Monitoring and maintain Test Pack, RT Rejection Rate
statistics. Raised QDR/NCR and report to QC Lead Engineer.
Project Name: SPT In-Refinery Project (IRF) and IC&T Project (ExxonMobil)
Date: 16-Jul 2008 to 14-Jan 2011
Responsibility:
Inspection for Shut-down Turnaround SRU-1 & 2, Oil Tankage and Subsea Line and piping welding in
Chemical plant.
Daily basis inspection on Piping oxygen line, Cement line, Impact tested Carbon steel, Acid service line and
other lines welding process for the materials UNS alloys NO4400 ('Monel 400') UNS alloys NO6600
('Inconel 600') UNS alloys N10276 ('Hastelloy C-276') UNS alloys NO8020 (‘Alloy 20’) with GTAW & SMAW,
as per WPS shall contain full details of backing gas conditions including gas composition, flowrate, closing
down type and maximum oxygen content in backing gas closure.
MOHAMAD ABU TAHER
Page 6
CURRICULAM VITAE
Surveillance and visual inspection carried out daily basis activity flange, valves conditions, valve tags on the
construction plant according to ASME B31.3, ASME IX, and API 650 and Foster Wheeler Fabrication
standard.
Review RT films, PAUT reports, PWHT report and review the piping and Tankage test package as per GP’s
requirement, Project Spec & Procedure. Regular RT performance statistics, NCR/ QDR status report to QC
Lead Engineer
Company Name: BNF Engineering
Position: Project QA Engineer
Project Name:
1. Fuel Gas Compressor System for CCPP 10 & 20 POWER SERAYA Project.
2. Power Gas Banyan OTS Project (Gas Transmission Pipe Line)
Date: 15-Aug-2011 to 06-Dec-2011
Responsibility:
Performed incoming inspection on Vendor equipment’s, Materials, Valves, Electrical Panel, Pumps,
Motors liaison with client’s engineering/QA Purchase Order & Delivery Order at workshop & site.
Prepare for design change notes, rejection criteria and non-conformance report (NCR) quality observation
reports (QOR) according to project Specification & VCD instruction.
Verified the customer purchased order package list, Vendor data & erection manuals, quantities etc.
Preparation of WPS, Construction method of statements, ITP’s and inspection test methodology, weld
joint repairing methodology, Organizing WPS, WQT and verification of test results and records, issuing
welder ID. Cards.
Review the Subcon blasting & painting procedure, HSE requirements and conducting Inspection of the
surface preparation blasting & painting, wrapping, coating, holiday testing and insulation. sign of the final
paint reports to meet the Quality requirements and code SSPC
Inspection of various types of Heat Exchangers as per ASME Section VIII Div 1
Company Name: Gammon Construction
Position: QA/QC Engineer (Lead)
Project Name: LanXess BTR Singapore Project
Date: 17-Jan 2011 to 08-July-2011
Responsibility:
MOHAMAD ABU TAHER
Page 7
CURRICULAM VITAE
Supervision of site engineering activities, Maintain quality activities of underground cooling water pipe line
& Permanent Services pipe line. Prepare daily inspection report, Coordination with NDT and prepare
MDR.
Worked with QA/QC Inspector in a project organizing and job monitoring a crew having Welding
inspectors, NDT & PWHT, painting inspector Interaction with them and reviewing their reports. Attend
internal auditing of Subcon progress reports, review Welder register, Welding consumables controlling
system , Materials receiving procedure and record keeping etc.
Attended the Quality & Safety meeting with Foster Wheeler QA Manager and report to direct Gammon
Project Manager (M&E).
Company Name: Hiap Seng Engineering Pte Ltd
Position: QC (Welding/ Piping Inspector)
Date: 09-Sep-2006 to 23-Jun-2008
Project Name: SHELL HOUDINI ECC Singapore Project
Client; ABB Lummus Global B.V, CB&I.
NWS LNG Phase V Expansion
Client: Foster Wheeler Eastern Pte Ltd
Dung Quat Refinery
Client: Emerson process Management
Responsibility:
Process control and monitoring piping and welding process like GTAW and SMAW as per the project
Specification, international Standards. Worked and Dealt with ASME B31.3, B31.1, ASME SEC VIII, ASME SEC V, ASME SEC IX, ISO 9001, AWS D1.1, API 1104, 650, 653 and various standards..
Prepare PQR, Welder performance report Welding Inspection for piping welding with GTAW, SMAW &
SAW welding process, Control daily welding and report to QC Manager.
Company Name: Jurong Shipyard Pte Ltd & Maua Jurong Shipyard Brasil Position: Marine Engineering Fitter & Assembler & QA Inspector Date: 13-July-2001 to 24-Aug-2006
Project Name: FPSO Conversion BRIGHT JEWEL
Client: Modec Int. LLC Singapore
FPSO Conversion RONCADOR Field Development (Petrobras P-54)
MOHAMAD ABU TAHER
Page 8
CURRICULAM VITAE
Client: PNBV Brasil
FPSO Conversion CNR Baobab Field Development. (T. T. NINA)
Client: Modec Int. LLC Singapore
FSO Conversion Chad Offshore Facilities (Companion)
Owner: Exxon Mobil Client: Modec Int. LLC
SEMI SUBMERSIBLE RIGS:
1. Development Driller Global SantaFe I2. Development Driller Global SantaFe II
Client: Global SantaFe Corporation
Responsibility:
Attend daily quality & safety meeting. Update the database for NDT test report and WQR
Attend Inspection in fabrication shop to check welding on piping & hull structure.
Daily basis inspection with client inspector on board and direct coordination with the Surveyor. Report to
JSL QA/QC Manager.
Study of, ISO’s, GA, P & ID’s, and project specifications in order to observe the variety, size and
thickness of pipes and structural to be welded
Daily basis Inspection for new ship building hull structural, Plate material and coordinate with the
classification surveyor such as ABS, LRS, NK, BV etc. Repair ships (Oil Tanker, LNG, LPG and Container
vessel)
SAFETY TRAINING & SEMINARS IN DIFFERENT PROJECT:
1) SOC, SMAW -3G (Shipyard_JSL)
2) ESOC/ SOC (Mom accredited) (SPT_Exxon Mobil)
3) Confined Space Entry Awareness (SPT_FWP)
4).Safety Induction at work Place (SPT_FWP)
5) Bicycle Training, CORE Behavior (SPT_FWP)
6) Working at Height & Suspension Trauma (SPT_FWP)
7) Enhance SHE rules & responsibility, SHE Supervisor (SPT_FWP)
8) Pre-start & Tool box meeting (SPT_FWP)
9) Permits to Work System (SPT& LanXess_Exxon Mobil & FW)
10) Demobilization Hazards Talk, Emergency First Aid Training (SPT_FWP)
MOHAMAD ABU TAHER
Page 9
CURRICULAM VITAE
11) NDT RT Safety Coordination (SPT_Exxon Mobil)
12) Zero Harm Training (LanXess_Gammon)
13) Harm Elimination and Recognition training (Heart) (LanXess_FW)
14) Occupational First Aid Refresher Course (LanXess_FW)
6 MONTHS JOB TRAINING ON BOARD INLAND OIL TANKER VESSEL:
Position Held: Cadet Engineer (Apprentice)
Period : 1st March 2000 to 31st August 2000
Vessel description: Name- M.T.SAIMA Type-Tanker, DWT/GRT-1230 tons Main Engine-Akasaka Diesel-800 BHP, 420 RPM Generator Engine-Yanmer Diesel Model no-6KFL, 120KVA 1200 RPM 220V, Carrying capacity-1400 tons.
Company Address: High Speed Group of Companies (Japan JV) 103, (ground floor) Motijheel C/A, Dhaka-1000. Bangladesh
End of CV
MOHAMAD ABU TAHER
Page 10
top related