method statement for plunge column
Post on 06-Jul-2018
230 Views
Preview:
TRANSCRIPT
-
8/18/2019 Method Statement for Plunge Column
1/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
PROJECT: Des!" #"$ Co"s%&'(%o" o) T'""e* +e%,ee" C#"$
Po*e #"$ B#$ Co'e& #"$ &ee&s#* *"e + Se*$ TBM
U"$e&!&o'"$ Me%&o S%#%o"s #% Co% Co'e& 2 B#$
Co'e& + C'% 2 Coe& Me%o$ o" E#s%-Wes% Co&&$o&
o) J#'& Me%&o 3P#se 1B #% J#'& R#5#s%#" I"$#.
LOCATION: JAIPUR
METHOD OF STATEMENT FORCONSTRUCTION OF PLUNGE COLUMN IN
STATION
Page 1
-
8/18/2019 Method Statement for Plunge Column
2/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
P&o5e(%M#"#!e&
R6 A7ASHGANGA
INFRASTRUCTURE
Co"s%&'(%o" P%. L%$.
DGM-P*#"""!
De#&%8e"%
CEC
DPMSTATION
CEC
Se"o&M#"#!e&9A/9C
De#&%8e"%
CEC
Ce) M#"#!e&
HSEDe#&%8e"%
CEC
P&o5e(%Le#$e&
CEC
T#+*e o) Co"%e"%sS&. No. Des(&%o" P#!e No.
1.0 Purpose 03
2.0 Scope of Work 03
3.0 Site Establishment & Setting Out 03
4.0 a!or "esources to be #eplo$e% 04
4.1 Euipment to be #eplo$e% 04
4.2 anpo'er to be %eplo$e% 04
(.0 aterials 04
).0 "esponsibilit$ an% *uthorit$ 0(+.0 ,onstruction Proce%ure 0)
+.1 -rac anagement an% /arrica%ing 0)
+.2 SE easures 0)
+.3 #esign & #ra'ings 0+
+.4 Site Establishment 0+
+.( Sure$ing 0+
+.) Pre -rench 0
+.+ Plunge column boring 0
+. uck #isposal 0
+. Preparation of "ebar ,age 10
Page 2
-
8/18/2019 Method Statement for Plunge Column
3/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
+.10 ,oncreting 12
.0 ualit$ ,ontrol 5 ,ontrol *ssurance 12
.0 Enironmental anagement 12
10.0 Safet$ an% Emergenc$ Proce%ure 1311.0 *ttachments 13
1.0 PURPOSE -his etho% Statement %escribes the construction process of 1(00 mm
%iameter Plunge columns in station areas.
.0 SCOPE OF WOR7
-he scope of 'ork an% the ,onstruction Seuence for installation of permanent
Plunge ,olumn shall be as mentione% belo'6
a. -rac anagement an% /arrica%ing
b. SE easures.
c.#esign an% #ra'ings
%. Site Establishment
e. Sure$ing
f. Pre7e8caation
g. /oring into soil to the %esign %epthh. uck "emoal
Page 3
-
8/18/2019 Method Statement for Plunge Column
4/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
i. 9abrication of structural steel :ange column
!. ,age preparation an% cage lo'ering
k.-remie ;o'ering
l. ,oncreting for Plunge ,olumnm. /ack
-
8/18/2019 Method Statement for Plunge Column
5/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
. -ransit i8er 7 no
. /atching Plant C)0 cum5hrD 7 1 no
4. M#"o,e& %o +e $e*oe$
S&.
No.
C#%e!o& N'8+e&
1 ,onstruction anager 1
2 Site Engineer 2
3 , Engineer C9iel% an% ;abD 1
4 echanical Engineer 1
( Sure$or 1) 9oreman 1
+ Superisor 4
Electrician 2
Safet$ Ocer 2
10 echanic 2
>.0 MATERIALS
,oncrete as per *pproe% mi8 %esign 3( =ra%e.
"einforcement Steel conforming to speci
-
8/18/2019 Method Statement for Plunge Column
6/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
o ualit$ anuals
o ,onstruction etho%olog$
F Oerall responsible for the 'hole operation.
?. S%#%o" M#"#!e&
F e shall be oerall responsible for the 'hole procurement of en> aterial an%
achiner$ at site> inclu%ing operation planning an% a%here% 'ith 'orks
program. e shall be liaison 'ith Gtilit$ O'ning *genc$ for approal of Gtilities
#iersion Plans Cif an$D.
?.; S%e E"!"ee&
F "esponsible for site operation.
F aterial an% euipment planning.
F Ensure 'orks are carrie% out in accor%ance 'ith the metho% statement.
F Ensure 'orks follo' approe% %ra'ings an% speci
-
8/18/2019 Method Statement for Plunge Column
7/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
?.? S#)e% Pe&so""e*
• Ensure 'orks are carrie% out in a safe manner an% in accor%ance 'ith the
safet$ reuirements stipulate% in the SE plan.
• ,on%uct tool bo8 talks on the safet$ reuirements> construction risks an% its
control measures etc.
?.@ S'&eo&
• ,arr$ out setting up 'orks an% locate as per submission %ra'ings.
• ,arr$ out inspection for location an% leel of structure.
• @eep monitoring the moement of groun% an% structure.
?. 9C E"!"ee&
• Ensure 'orks are carrie% out in accor%ance 'ith speci Safet$ & ualit$ an% enclose Anspection an% -est Plan an% risk
assessment. e shall reie' the metho% statement as per site reuirement.
@. CONSTRUCTION PROCEDURE
@.1 T( M#"#!e8e"% #"$ B#&&(#$"!
-rac management shall be carrie% out as per the approe% -rac #iersion
Plan. 9or hea$ euipment mobiliHation> necessar$ precautions shall be taken to
bring the reuire% items 'ithin the 'ork area boun%ar$ b$ carefull$ managing
the trac. -he 'ork location shall be barrica%e% as per the site reuirement an%
all the euipment shall be installe% insi%e barrica%e% area.
Page +
-
8/18/2019 Method Statement for Plunge Column
8/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
@. SHE Me#s'&es
1D *ll the 'orkers shall be proi%e% 'ith reuire% PPE Csafet$ !acket> shoes> helmet>
han% gloes etc.D before the$ are engage% in the 'ork.
2D Safet$ in%uction shall be proi%e% to the superisors> engineers an% 'orkers.
3D -ool bo8 meetings shall be organiHe% eer$ %a$ b$ site superisor before start of
'ork in or%er to keep 'orkers a'are of associate% risks an% safe 'orking in
or%er to aoi% acci%ents5in!uries.
4D GnauthoriHe%5outsi%ers shall not be allo'e% to enter insi%e5sta$ near the area
barrica%e% %uring 'ork in progress.
(D 9irst ai% facilities shall be ma%e aailable at site an% male nurse shall be
aailable at principal 'ork spot to ren%er the if so reuire%.
)D Proper ;ighting arrangement shall be maintaine% %uring night 'ork Cor in %a$
time in case of lo' isibilit$D.+D ousekeeping shall be maintaine% at 'ork spot to aoi% an$ un%esirable
inci%ent.
D Emergenc$ contact number shall be aailable an% %ispla$e% at the %esignate%
locations near the 'ork spot to tackle an$ emergenc$ situation occurring at site.
D *ll the machines shall be inspecte% before %eplo$ing to the 'ork an% proper
guar%ing for moing parts
Shall be in place prior to commencement of 'ork. Operators 'ith ali% licence
C'here applicableD shall be allo'e%.
10D Silent t$pe #= sets shall be %eplo$e% at 'ork location.11D #rip tra$ shall be proi%e% un%erneath the machineries to aoi% lan%
contaminations.
12D #ust bins shall be aailable at prominent locations of 'ork site to collect
generate% 'aste out of site actiities.
13D "isk assessment shall be %iscusse% among all concerne% prior to start of the
actiit$.
14D *fter completion of 'ork at a particular stretch reuire% back
-
8/18/2019 Method Statement for Plunge Column
9/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
original con%ition.
@.; Des!" 2 D,"!s
*. -he 'ork shall be carrie% out as per the approe% %esign an% %ra'ing.
/. ,ontrolle% copies of releant %ra'ings shall be ma%e aailable at site an% shall
remain aailable 'ith site engineer throughout the 'ork.
@.4 S%e Es%#+*s8e"%
/efore starting an$ actiities> a site utiliHation plan is %ra'n sho'ing the arious
establishments at site such as location of Panel formation> Putting #=Is> Pol$mer
tanks> uck bin> oce etc. through a %etaile% sure$. -he site area shall be then
cleane% properl$ an% ma%e free from an$ on an% oer groun% obstruction an%
necessar$ barrica%ing shall be installe%. *ll plant an% euipment shall be place%
as per this plan.
@.> S'&e"!
Gpon clearing the site area> the setting outpoints shall be marke% for the
sub!ecte% Plunge ,olumn panel an% 'ith reference to that gui%e 'all> points
shall be marke% through reuisite sure$. "eference pillars shall be al'a$s
presere% for checking of constructe% gui%e 'all at later stage. *ll the sure$
points5coor%inates shall be maintaine% in sure$ sheet an% checke%5approe%
b$ Engineer prior to construction 'ork.
@.? P&e T&e"(
#uring this pre e8caation process> inestigation an% eri the same shall be %one either through local shifting or
proi%ing the local %iersion as agree% upon b$ the utilit$ o'ner. -he %iersion
Page
-
8/18/2019 Method Statement for Plunge Column
10/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
process if necessar$ shall be %one in consultation 'ith utilit$ o'ner. Gtilit$
%iersion shall be %one as per *pproe% etho% Statement. -he utilit$ %iersion
metho% statement shall proi%e %etaile% information about the un%erl$ing
utilities an% the process to be follo'e% for the %iersion process.
@.@ P*'"!e Co*'8" Bo&"!
3#Bo&"! o) So*
1.( meter %iaJ /oring of soil shall be carrie% out using a rotar$ $%raulic
pilling rig in normal soil strata to the reuire% %epth as Per #ra'ing
?o.O@A,P;7B1/7,7S,7,70411.Soil stabiliHation 'ill be ensure b$ pol$mer
-
8/18/2019 Method Statement for Plunge Column
11/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
lo'ering the ,asing 'ith crane. Kerticall$ shall be checke% an% ensure%
%uring installation.
-he casing shall then be %rien into the groun% 'ith rotar$ machine untilabout 300 mm is left protru%ing aboe the groun%.
#rilling rig is then use% to progress the e8caation to the bottom of the
casing pipe an% then pol$mer shall be a%%e% before an$ further e8caation
is ma%e.
#uring e8caation pol$mer shall be a%%e% continuall$ from the storage tank
such that leel is maintaine% 'ith in 1000mm belo' top of casing pipe.
E8caation %epth shall be foun% b$ soun%ing tape.
3ePo*8e& S*'&& P&e#%o" S%o!e #"$ (&('*#%o"
#r$ pol$mer po'%er shall be teste% an% approe% prior to the use. -he
batching plant shall be erecte% on a%euate impermeable slab. #r$
pol$mer po'%er shall be mi8e% in the mi8ing tank 'ith the 'ater. -he
mi8ing shall be achiee% b$ %e%icating a pump an% compresse% air s$stem.
-he mi8ing tank capacit$ ma$ be 1.( times the e8caationLs olume. -he
mi8ing tank shall be connecte% to the slurr$ storage tank 'ith appropriate
routing ales. -hus pol$mer slurr$ is ma%e rea%$ for use 'ith reuire%
properties.An the secon% phase the pol$mer slurr$ shall be pumpe% to the trench an%
circulate% continuousl$ till e8caation is oer. While the panel e8caation is
going on the pol$mer slurr$ continuousl$ :o's to the trench an% thus
stabiliHes the trench throughout its %epth. While e8caation> the pol$mer
slurr$ get mi8e% 'ith soil an% loses its properties. ,ontinuous circulation of
fresh pol$mer shall help to keep the properties of the pol$mer slurr$ een
then it is mi8e% 'ith the soil. -he return slurr$ shall be pumpe% into the
se%imentation tank. -he se%imentation tank shall be kept open to the top
to allo' an eas$ cleaning an% remoal of se%iments. *s se%imentation tankis inclu%e% 'ith three %e:ector ertical plates> continuous :o' of slurr$
Page 11
-
8/18/2019 Method Statement for Plunge Column
12/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
shall occur in Mcasca%eM like mo%e an% increase the spee% of the
se%imentation occurring bet'een %iNerent compartments. -he
-
8/18/2019 Method Statement for Plunge Column
13/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
thoroughl$ an% be ma%e free from muck before the truck e8its the site. *fter
remoing all the muck the area shall be cleane% using 'ater through the 'ater
pipe line arrangement at site.
@. P&e#%o" o)
Re+#& C#!e
@..1Re")o&(e8e"% S%ee* C#!e C'%%"! Be"$"!
-he reinforcement cage shall be in single piece or t'o pieces %epen%ing upon
the site con%ition an% euipment aailabilit$> the cage ma$ be fabricate% an%
lo'ere% into /ore Pile. -he reinforcement shoul% be cut an% ben% at the steel
$ar% or at site as per bar ben%ing sche%ule an% the cages shall be prepare% at
site oer a leel groun%. ?ecessar$ spacer bars> inserts an% coer
blocks shall be proi%e% along 'ith the reinforcement cage. ,are shall be takento fabricate the cage in true line an% leel 'ith coer blocks the /ar /en%ing sche%ule shall
be prepare% an% shall be submitte% for approal. -he reinforcement shall be cut
an% bent as per approe% /ar /en%ing Sche%ule in reinforcement $ar% situate%
at the casting $ar%. -he cut an% bent steel shall be shifte% to the site 'ith the
help of -railer for making the cage. -he reinforcement cage shall be fabricate% at the site. Af there is insucient
space on site> the same shall be fabricate% at the casting $ar% or other oNsite
location an% the prefab cage shall be shifte% to site through trailer. -he
reinforcement cage shall be fabricate% using the /in%ing 'ire an% 'hereer
Page 13
-
8/18/2019 Method Statement for Plunge Column
14/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
reuire% 'el%ing shall be %one. C#etails of Plunge ,olumn "einforcement are
sho'n in #ra'ing ?o. O@A,P;7B1/7,7S,7#70+2*D. -he cage shall be fabricate% oer the fabrication be% consisting either of steel
chairs> channels or 'oo%en sleepers. -he clear coer shall be maintaine% as per%esign 'hich is +( mm. ,oncrete spacers Csame gra%e as Plunge ,olumn
concrete > circular or trapeHoi%al ski% shapeD shall be
-
8/18/2019 Method Statement for Plunge Column
15/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
*fter lo'ering of reinforcement cage> tremie of minimum 200mm %ia an% length
of 1.2 to 2m shall be lo'ere% in pieces an% connecte% 'hile lo'ering for full
%epth of trench 'ith the help of serice crane an% hopper of appro8imatel$ 1.(
cum capacit$ shall be attache% to the top of tremie pipes.@.10 Co"(&e%"!
,oncrete of reuire% gra%e 3( shall be batche% in the batching plant an% same
shall be transporte% through the transit mi8er an% poure% to the hopper5tremie
pipe. Anitial setting an%
-
8/18/2019 Method Statement for Plunge Column
16/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
tra$s to be use% un%erneath compressors an% generators. Site is to be kept free
of %ust. ?oise leels shall be kept 'ell 'ithin the allo'able limits.
. E"&o"8e"%#* M#"#!e8e"%
Safet$> ealth an% Enironment CSED plan shall be follo'e% throughout theconstruction program. -he ,onstruction of Plunge ,olumn inoles the use of
hea$ machineries such as crane> e8caators an% trucks etc. an% these
machines ineitabl$ create noise. o'eer> in or%er to minimiHe the noise an%
%iscomfort to the people liing in the neighborhoo% or the shopkeepers an%
people coming to the nearb$ markets> all the machines shall be proi%e% 'ith
suitable silencers an% 'ith acoustic enclosures> ?oise barriers shall be erecte%
to minimiHe the noise pollution.
-he construction shall also inole the remoal of earth from site to %umping
areas b$ %umpers that shall use the public roa%s. #uring transportation the%umpers shall be coere% b$ tarpaulins. -he muck shall be %ispose% %uring the
night hours onl$ an% one superisor$ leel staN shall be engage% permanentl$
at %umping $ar% 'ith B,/ for leeling the upcoming soil leeling> 'hile %umping
the soil.
Simultaneousl$ the area leeling an% shall create a proper 'a$ for soil %umping.
-he use% pol$mer slurr$ shall be transporte% in %umpers.
-he 'ashing ba$ shall be installe% near each e8it gate. -hese 'ashing ba$s are
of improe% %esign using a hea$7%ut$ pump haing high hea% an% large
%ischarge. -he tires an% the un%ercarriage of the ehicles shall be 'ashe%
before the ehicle leaes the 'orking area for %umping site. An case 'ater is not
aailable %ue to 'ater scarcit$> tire shall be cleane% manuall$ 'ith 'ire brush.
"euire% persons shall be engage% to clean the si%es of the ehicles manuall$.
-he 'orking area shall be kept clean an% ti%$.
10. S#)e% #"$ E8e&!e"( P&o(e$'&es
#uring e8caation all necessar$ precautions to ensure stabilit$ to the
e8caations an% gui%e 'alls shall be taken. Af e8caation be suspen%e% for an$
reason> pol$mer in the trench shall be agitate%> perio%icall$ 'ith the grab or b$
circulation for a ma8imum perio% of 24 hrs. -his shall be follo'e% b$ back
-
8/18/2019 Method Statement for Plunge Column
17/17
CEC - UG1B CONTRACT: ICB No. :-JP/EW/1B/C1
METHOD STATEMENT FORCONSTRUCTION OF PLUNGE
COLUMN IN STATIONDOC NO:
-
JAIPUR METRO RAIL
CORPORATION LIMITEDCONTRACT UG1B
An the eent of a su%%en loss of pol$mer slurr$ or trench collapse> the
e8caation shall be imme%iatel$ stoppe% an% the trench back
top related