quarry: bukit batuLABORATORIUM BAHAN DAN KONTRUKSI LABORATORIUM BAHAN DAN KONTRUKSI
FAKULTAS TEKNIK FAKULTAS TEKNIK UNIVERSITAS TANJUNGPURA UNIVERSITAS TANJUNGPURAPEMERIKSAAN KADAR LUMPUR PEMERIKSAAN KADAR LUMPUR
T 1 85 Berat WadahT 2 0.5 Berat Benda Uji
Kadar Lumpur 0.5847953216 Berat Benda Uji + Wadah keringBerat Benda Uji Kering
Kadar Lumpur
-
LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURAPEMERIKSAAN KADAR LUMPUR
Berat Wadah 230.4Berat Benda Uji 500Berat Benda Uji + Wadah kering 729.5
Berat Benda Uji Kering 499.1Kadar Lumpur 0.18
-
LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURA
PEMERIKSAAN KADAR AIR AGREGAT HALUS
A Berat wadah
B Berat wadah + benda uji
C Berat benda uji (B-A)
D Berat benda uji kering
Berat kering+wadah halus
KADAR AIR
-
LABORATORIUM BAHAN DAN KONTRUKSI LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURA UNIVERSITAS TANJUNGPURA
PEMERIKSAAN KADAR AIR AGREGAT HALUS PEMERIKSAAN KADAR AIR AGREGAT KASAR
280.2 A Berat wadah
2280.2 B Berat wadah + benda uji
2000 C Berat benda uji (B-A)
1988.6 D Berat benda uji kering
2268.8 Berat kering+wadah kasar
0.57 KADAR AIR
-
LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURA
PEMERIKSAAN KADAR AIR AGREGAT KASAR
202.7
Berat wadah + benda uji 2702.7
Berat benda uji (B-A) 2500
Berat benda uji kering 2483.6
Berat kering+wadah kasar2686.3
KADAR AIR0.656
-
LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURAPEMERIKSAAN GRADASI AGREGAT ( PASIR )
No saringan Berat Tertahan % TertahanKumulatif
Tertahan Lolos9.50 0.00 0.00 0.00 100.004.75 0.00 0.00 0.00 100.002.38 14.20 0.71 0.71 99.291.18 406.20 20.31 21.02 78.980.59 549.60 27.48 48.50 51.500.30 697.20 34.86 83.36 16.640.15 286.70 14.34 97.70 2.31pan 46.10 2.31jmlh 2000.00 100.00 251.285
Fine Modulus 2.51
No Saringan Berat isi
9.50 525.6 525.6 04.75 516.8 621.9 02.38 495.5 509.7 14.21.18 458.8 865 406.20.59 420.7 970.3 549.60.295 391.3 1088.5 697.20.149 373.3 660 286.7pan 274.2 320.3 46.1
2000 2000
Berat Persaringan
Berat isi Persaringan
-
LABORATORIUM BAHAN DAN KONTRUKSI No Saringan Hasil Analisa Batas Bawah Batas AtasFAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURA 9.50 100.00 100 100PEMERIKSAAN GRADASI AGREGAT ( PASIR ) 4.75 100.00 95 100
2.38 99.29 80 1001.18 78.98 50 85
100.00 0.59 51.50 25 6095 - 100 0.30 16.64 10 3080 - 100 0.15 2.31 2 1050 - 85 0.00 0.00 0 025 - 6010 -. 302 - .10
Grad Spesific ASTM C 33
9.504.752.381.180.590.300.150.000102030405060708090100
Sieve Analysis of Fine Aggregate (Sand)(ASTM C 136 92)
Batas Bawah Batas Atas Hasil Analisa
Percent passing (%)
sieve number
-
9.504.752.381.180.590.300.150.000102030405060708090100
Sieve Analysis of Fine Aggregate (Sand)(ASTM C 136 92)
Batas Bawah Batas Atas Hasil Analisa
Percent passing (%)
sieve number
-
LABORATORIUM BAHAN DAN STRUKTUR FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718
LABORATORIUM BAHAN DAN KONSTRUKSI FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURAGRADASI AGREGAT GABUNGAN BATU
AGREGAT & LOLOS AGREGAT CAMPURAN 100 % CAMPURAN50% 50%mm Uk 1-1 Uk 1-2 Uk 1-1 Uk 1-237.5 100.00 100.00 50.00 50.00 100.00 25.4 100.00 91.72 50.00 45.86 95.86 19.1 55.34 13.80 27.67 6.90 34.57 12 5.55 1.30 2.78 0.65 3.43 9.5 0.62 0.25 0.31 0.12 0.43 4.75 0.15 - 0.07 - 0.07
UKURAN SARINGAN
37.525.419.1129.54.750 - 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00
Sieve Analysis of Coarse Aggregate (Stone)(ASTM NO.07)
Column V Column W Column X
Percent passing (%)
sieve number
-
LABORATORIUM BAHAN DAN STRUKTUR FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718
LABORATORIUM BAHAN DAN KONSTRUKSI FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURAGRADASI AGREGAT GABUNGAN BATU
100 % CAMPURAN
100.00 100 95.86 90-100 34.57 20-55 3.43 0-10 0.43 0-5 0.07
SPESIFIKASI (ASTM N0. 07 )
37.525.419.1129.54.750 - 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00
Sieve Analysis of Coarse Aggregate (Stone)(ASTM NO.07)
Column V Column W Column X
Percent passing (%)
sieve number
-
37.5 100.00 100.00 100.00 25.4 90.00 100.00 95.86 19.1 20.00 55.00 34.57
12 0 10.00 3.43 9.5 0 5.00 0.43
4.75 0 0 0.07 0 0 0 0
-
0.15 5.15 10.15 15.15 20.15 25.15 30.15 35.15 40.15 -
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
UKURAN SARINGAN ( MM)
PERSENTASE LOLOS ( % )
Gradasi campuran
-
261.7 207.1 234.366 2.34366
48 5624 45 28
0.2
-
GRADASI AGREGAT GABUNGAN BATU PECAH DENGAN PASIR0.15 5.15 10.15 15.15 20.15 25.15 30.15 35.15 40.15
-
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
UKURAN SARINGAN ( MM)
PERSENTASE LOLOS ( % )
Gradasi campuran
-
GRADASI AGREGAT GABUNGAN BATU PECAH DENGAN PASIR
-
GRADASI AGREGAT GABUNGAN BATU PECAH DENGAN PASIR
-
GRADASI AGREGAT GABUNGAN BATU PECAH DENGAN PASIR
-
LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURAPEMERIKSAAN GRADASI AGREGAT ( BATU )
Berat Tertahan % TertahanKomulatif
Tertahan Lolos25.40 0 0.00 0.00 100.0019.10 1116.4 44.66 44.66 55.3412.00 1244.8 49.79 94.45 5.559.50 123.3 4.93 99.38 0.624.75 11.8 0.47 99.85 0.15pan 3.7 0.15jmlh 2500 100.00 338.34
fine modulus : 3.38336
No Saringan berat persaringan berat isi
25.40 542 542 019.1 510.4 1626.8 1116.412 602.7 1847.5 1244.89.5 523.6 646.9 123.34.75 516.2 528 11.8pan 274.2 277.9 3.7
jumlah 2500
No Saringan
brt isi persaringan
-
LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK
No Saringan Batas Bawah Batas Atas Hasil AnalisaUNIVERSITAS TANJUNGPURA
PEMERIKSAAN GRADASI AGREGAT ( BATU ) 25.4 100 100 100.0019.1 90 100 55.3412 20 55 5.559.5 0 15 0.624.75 0 5 0.15
0 0 0 0
Grad Spesific ASTM C 33
25.419.1129.54.7500
10
20
30
40
50
60
70
80
90
100
Sieve Analysis of Coarse Aggregate (Stone)(ASTM C 33)
batas bawah batas atas hasil analisa
Percent passing (%)
sieve number
-
25.419.1129.54.7500
10
20
30
40
50
60
70
80
90
100
Sieve Analysis of Coarse Aggregate (Stone)(ASTM C 33)
batas bawah batas atas hasil analisa
Percent passing (%)
sieve number
-
LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURAPEMERIKSAAN GRADASI AGREGAT ( BATU )
Berat Tertahan % TertahanKomulatif
Tertahan Lolos37.50 0 0.00 0.00 100.0025.40 207 8.28 8.28 91.7219.10 1948.1 77.92 86.20 13.8012.00 312.3 12.49 98.70 1.309.52 26.4 1.06 99.75 0.25pan 6.2 0.25jmlh 2500 100.00 292.93
fine modulus : 2.92932
No Saringan berat persaringan berat isi
37.50 542 542 025.4 500.6 707.6 20719.1 510.5 2458.6 1948.112 566 878.3 312.3
9.52 523.6 550 26.4pan 274.3 280.5 6.2
jumlah 2500
No Saringan
brt isi persaringan
-
LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK
No Saringan Batas Bawah Batas Atas Hasil AnalisaUNIVERSITAS TANJUNGPURA
PEMERIKSAAN GRADASI AGREGAT ( BATU ) 37.5 100 100 100.0025.4 90 100 91.7219.1 20 55 13.8012 0 15 1.30
9.52 0 5 0.250 0 0 0
Grad Spesific ASTM C 33
37.525.419.1129.5200
10
20
30
40
50
60
70
80
90
100
Sieve Analysis of Coarse Aggregate (Stone)(ASTM C 33)
batas bawah Batas Atas+'Gradasi Stone 1.2'!$J$4:$J$9Hasil Analisa
Percent passing (%)
sieve number
-
37.525.419.1129.5200
10
20
30
40
50
60
70
80
90
100
Sieve Analysis of Coarse Aggregate (Stone)(ASTM C 33)
batas bawah Batas Atas+'Gradasi Stone 1.2'!$J$4:$J$9Hasil Analisa
Percent passing (%)
sieve number
-
LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURABERAT JENIS AGREGAT ( PASIR )
A brt pikno 181B brt cnth knds SSD 500C brt pikno+air+cnth SSD 989D brt pikno + air 681.1E bert contoh kering 496.5
apperent specific gravity 2.633bulk kering 2.585bulk SSD 2.603absorbsi 0.705
CATATANbrt wadah 55.4 .brt wadah+ ssd kering 551.9
-
LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURABERAT JENIS AGREGAT ( BATU )
A Berat SSDB berat contoh dalam airC berat contoh kering di udara
apperent specific gravitybulk keringbulk SSDabsorbsi
CATATANBerat keranjang 467.8Berat keranjang dalam air 412Berat keranjang dalam air + batu 3538Berat keranjang + batu kering 5410.3
-
LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURABERAT JENIS AGREGAT ( BATU )
Berat SSD 5003.1berat contoh dalam air 3126berat contoh kering di udara 4942.5
apperent specific gravity 2.721bulk kering 2.633bulk SSD 2.665absorbsi 1.226
-
LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURABERAT VOLUME AGREGAT ( PASIR )
A Volume Mould 10B Berat Mould 4.67C Berat Pasir Kondisi Gembur 18.68D Berat isi kondisi Gembur 1.401E Berat Pasir Kondisi Padat 19.53F Berat isi Kondisi Padat 1.486
Rata-Rata 1.4435
-
LABORATORIUM BAHAN DAN KONTRUKSI FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURABERAT VOLUME AGREGAT ( BATU )
A Volume Mould 10B Berat Mould 4.66C Berat Batu Kondisi Gembur 19.83D Berat isi kondisi Gembur 1.517E Berat Batu Kondisi Padat 21.2F Berat isi Kondisi Padat 1.654
Rata-Rata 1.5855
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
MIX DESAIN RANCANGAN CAMPURAN BETON
KONTRAKTOR :PT.PRABA
PEKERJAAN :PEMBANGUNAN PLTU III KALBAR
METODE ACI K 250
PENETAPAN VARIABEL PERENCANGAN
1 Mutu rencana
2 Rencana Slump
3 Kekuatan tekan rencana beton
4 Modulus kehalusan pasir
5 Ukuran maksimum agregat kasar
6 Specifific Gravity halus SSD
7 Specifific Gravity kasar SSD
8 Berat volume agregat kasar
9 Specifific Gravity semen
10 Specifific Gravity air
11 Nilai Margin
12 Faktor Koreksi
PERHITUNGAN KOMPOSISI UNSUR BETON
13 Rencana air adukan /m3 beton
14 Prersentase udura yang terperangkap
15 W/C (Tabel)
16 W/C (Grafik)
17 W/C perencanaan (yang terkecil dari (15) dan (16))
18 Berat Semen = (13) / (17)
-
19 Volume agregat kasar perlu/m3 beton
20 Berat agregat kasar (19) x (8)
21 Volume semen/m3 beton =
22 Volume air/m3 beton =
23 Volume agregat kasar beton =
24 Volume udara terperangkap/m3 beton = (14)
25Volume perlu agregat halus/m3 beton
= 1m3 - ((21) + (22) + (23) + (24))
001,0)10()13(
001,0)7()20(
001,0)9()18(
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI BERAT UNSUR ADUKAN KONDISI SSD / m BETON
26 Semen = (18)27 Air (13)28 Agregat halus kondisi SSD = (25) x (6) x 1000
29 Agregat kasar kondisi SSD = (20)
30 Agregat kasar Uk.1/1 50%
31 Agregat kasar Uk.1/2 50%
32 SIKA
33 Jumlah semen = (26) / 50
Total
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER ZAK (50 kg)
32 Semen
33 Air
34 Agregat halus
35 Agregat kasar
Total
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER m(50 kg)
37 Semen
38 Air
39 Agregat halus
40 Agregat kasar
Total
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
MIX DESAIN RANCANGAN CAMPURAN BETON
KONTRAKTOR :PT.PRABA
PEKERJAAN :PEMBANGUNAN PLTU III KALBAR
METODE ACI K 250
PENETAPAN VARIABEL PERENCANGAN
25 N/mm2
7,5-10 cm 3.28
33.25 N/mm2
2.513
20.0 mm
2.603 t/m3
2.665 t/m3
1.5855 kg/m2
3.150 t/m3
1 t/m3
8.25 kg/cm2
1.00
PERHITUNGAN KOMPOSISI UNSUR BETON
193 kg/m3
1.5 %
0.48
0.48
0.48
402.083 kg
-
72 %
1141.560 kg
0.128 m3
0.193 m3
0.428 m3
0.02 m3
0.251 m3
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI BERAT UNSUR ADUKAN KONDISI SSD / m BETON
300.000 kg164 kg
638.000 kg
1198.000 kg
599.000 kg
599.000 kg
0.300 kg
6.00000 Zak
2300.000 kg
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER ZAK (50 kg)
50.000 kg
27.333 kg
106.333 kg
199.667 kg
383.333 kg
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER m(50 kg)
0.016
0.027
0.041
0.075
0.159
m
m
m
m
m
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
Sambungan
KOMPOSISI PEMBUATAN SAMPEL
43 Banyak benda uji
44 Volume benda uji/benda uji
45 Semen
46 Air
47 Agregat halus
48 Agregat kasar
49 Agregat kasar Uk. 1/1 50%
50 Agregat kasar Uk. 1/2 50%
51 SIKA
Pontianak, 24 April 2013
Laboratorium Bahan dan Konstruksi
Fakultas Teknik Untan
Kepala
IR.DHARMA SARDJANA , MT
NIP. 1952 0214 1987 10 1001
-
4.5
2.46
9.57 200
17.97 100
0.0736635492 0.081
0.1259329339 0.1056
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI PEMBUATAN SAMPEL
9 Buah
0.005300 m3
14.310 kg
7.823 kg
30.433 kg
57.145 kg
Agregat kasar Uk. 1/1 50% 28.572 kg
Agregat kasar Uk. 1/2 50% 28.572 kg
SIKA 0.014 kg
Pontianak, 24 April 2013
Laboratorium Bahan dan Konstruksi
Fakultas Teknik Untan
Kepala
IR.DHARMA SARDJANA , MT
NIP. 1952 0214 1987 10 1001
-
Trial+20 %
17.17 10.94 6.23
9.39 5.98 3.41
36.52 23.26 13.26
68.57 43.33 25.24
34.29 21.83 12.46
34.29 21.83 12.46
0.02 36
-
JUMLAH KEBUTUHAN AGREGAT DALAM CAMPURAN BETON ( BUKIT BATU FC.25 )
JUMLAH KEBUTUHAN AGREGAT DALAM M3
SEMEN 300
AIR 164
PASIR 638
BATU 1198
BATU UK 1/1 50% 599
BATU UK 1/2 50% 599
-
JUMLAH KEBUTUHAN AGREGAT DALAM CAMPURAN BETON ( BUKIT BATU FC.25 )
JUMLAH KEBUTUHAN AGREGAT DALAM 9 SAMPEL
SEMEN 17.17
AIR 9.39
PASIR 36.52
BATU 68.57
BATU UK 1/1 50% 34.29
BATU UK 1/2 50% 34.29
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
MIX DESAIN RANCANGAN CAMPURAN BETON
KONTRAKTOR :PT.PRABA
PEKERJAAN :PEMBANGUNAN PLTU III KALBAR
METODE ACI K 250
PENETAPAN VARIABEL PERENCANGAN
1 Mutu rencana
2 Rencana Slump
3 Kekuatan tekan rencana beton
4 Modulus kehalusan pasir
5 Ukuran maksimum agregat kasar
6 Specifific Gravity halus SSD
7 Specifific Gravity kasar SSD
8 Berat volume agregat kasar
9 Specifific Gravity semen
10 Specifific Gravity air
11 Nilai Margin
12 Faktor Koreksi
PERHITUNGAN KOMPOSISI UNSUR BETON
13 Rencana air adukan /m3 beton
14 Prersentase udura yang terperangkap
15 W/C (Tabel)
16 W/C (Grafik)
17 W/C perencanaan (yang terkecil dari (15) dan (16))
18 Berat Semen = (13) / (17)
-
19 Volume agregat kasar perlu/m3 beton
20 Berat agregat kasar (19) x (8)
21 Volume semen/m3 beton =
22 Volume air/m3 beton =
23 Volume agregat kasar beton =
24 Volume udara terperangkap/m3 beton = (14)
25Volume perlu agregat halus/m3 beton
= 1m3 - ((21) + (22) + (23) + (24))
001,0)10()13(
001,0)7()20(
001,0)9()18(
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI BERAT UNSUR ADUKAN KONDISI SSD / m BETON
26 Semen = (18)27 Air (13)28 Agregat halus kondisi SSD = (25) x (6) x 1000
29 Agregat kasar kondisi SSD = (20)
30 Agregat kasar Uk.1/1 50%
31 Agregat kasar Uk.1/2 50%
32 Jumlah semen = (26) / 50
Total
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER ZAK (50 kg)
32 Semen
33 Air
34 Agregat halus
35 Agregat kasar
Total
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER m(50 kg)
37 Semen
38 Air
39 Agregat halus
40 Agregat kasar
Total
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
MIX DESAIN RANCANGAN CAMPURAN BETON
KONTRAKTOR :PT.PRABA
PEKERJAAN :PEMBANGUNAN PLTU III KALBAR
METODE ACI K 250
PENETAPAN VARIABEL PERENCANGAN
25 N/mm2
7,5-10 cm 3.28
33.25 N/mm2
2.513
20.0 mm
2.603 t/m3
2.665 t/m3
1.5855 kg/m2
3.150 t/m3
1 t/m3
8.25 kg/cm2
1.00
PERHITUNGAN KOMPOSISI UNSUR BETON
193 kg/m3
1.5 %
0.48
0.48
0.48
402.083 kg
-
72 %
1141.560 kg
0.128 m3
0.193 m3
0.428 m3
0.02 m3
0.251 m3
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI BERAT UNSUR ADUKAN KONDISI SSD / m BETON
360.000 kg170 kg
680.000 kg
1150.000 kg
575.000 kg
575.000 kg
7.20000 Zak
2360.000 kg
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER ZAK (50 kg)
50.000 kg
23.611 kg
94.444 kg
159.722 kg
327.778 kg
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER m(50 kg)
0.016
0.024
0.036
0.060
0.136
m
m
m
m
m
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
Sambungan
KOMPOSISI PEMBUATAN SAMPEL
43 Banyak benda uji
44 Volume benda uji/benda uji
45 Semen
46 Air
47 Agregat halus
48 Agregat kasar
49 Agregat kasar Uk. 1/1 50%
50 Agregat kasar Uk. 1/2 50%
Pontianak, 24 April 2013
Laboratorium Bahan dan Konstruksi
Fakultas Teknik Untan
Kepala
IR.DHARMA SARDJANA , MT
NIP. 1952 0214 1987 10 1001
-
5.4
2.55
10.2 200
17.25 100
0.0654273948 0.081
0.1007393391 0.1056
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI PEMBUATAN SAMPEL
9 Buah
0.003375 m3
10.935 kg
5.164 kg
20.655 kg
34.931 kg
Agregat kasar Uk. 1/1 50% 17.466 kg
Agregat kasar Uk. 1/2 50% 17.466 kg
Pontianak, 24 April 2013
Laboratorium Bahan dan Konstruksi
Fakultas Teknik Untan
Kepala
IR.DHARMA SARDJANA , MT
NIP. 1952 0214 1987 10 1001
-
Trial+20 %
13.12
6.20
24.79
41.92
20.96
20.96
-
JUMLAH KEBUTUHAN AGREGAT DALAM CAMPURAN BETON ( BUKIT BATU FC.25 )
JUMLAH KEBUTUHAN AGREGAT DALAM M3
SEMEN 402.083
AIR 192.220
PASIR 653.340
BATU 1141.560
BATU UK 1/1 50% 570.780
BATU UK 1/2 50% 570.780
-
JUMLAH KEBUTUHAN AGREGAT DALAM CAMPURAN BETON ( BUKIT BATU FC.25 )
JUMLAH KEBUTUHAN AGREGAT DALAM 9 SAMPEL
SEMEN 13.12
AIR 6.20
PASIR 24.79
BATU 41.92
BATU UK 1/1 50% 20.96
BATU UK 1/2 50% 20.96
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
MIX DESAIN RANCANGAN CAMPURAN BETON
KONTRAKTOR :PT.PRABA
PEKERJAAN :PEMBANGUNAN PLTU III KALBAR
METODE ACI K 250
PENETAPAN VARIABEL PERENCANGAN
1 Mutu rencana
2 Rencana Slump
3 Kekuatan tekan rencana beton
4 Modulus kehalusan pasir
5 Ukuran maksimum agregat kasar
6 Specifific Gravity halus SSD
7 Specifific Gravity kasar SSD
8 Berat volume agregat kasar
9 Specifific Gravity semen
10 Specifific Gravity air
11 Nilai Margin
12 Faktor Koreksi
PERHITUNGAN KOMPOSISI UNSUR BETON
13 Rencana air adukan /m3 beton
14 Prersentase udura yang terperangkap
15 W/C (Tabel)
16 W/C (Grafik)
17 W/C perencanaan (yang terkecil dari (15) dan (16))
18 Berat Semen = (13) / (17)
-
19 Volume agregat kasar perlu/m3 beton
20 Berat agregat kasar (19) x (8)
21 Volume semen/m3 beton =
22 Volume air/m3 beton =
23 Volume agregat kasar beton =
24 Volume udara terperangkap/m3 beton = (14)
25Volume perlu agregat halus/m3 beton
= 1m3 - ((21) + (22) + (23) + (24))
001,0)10()13(
001,0)7()20(
001,0)9()18(
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI BERAT UNSUR ADUKAN KONDISI SSD / m BETON
26 Semen = (18)27 Air (13)28 Agregat halus kondisi SSD = (25) x (6) x 1000
29 Agregat kasar kondisi SSD = (20)
30 Agregat kasar Uk.1/1 50%
31 Agregat kasar Uk.1/2 50%
32 Jumlah semen = (26) / 50
Total
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER ZAK (50 kg)
32 Semen
33 Air
34 Agregat halus
35 Agregat kasar
Total
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER m(50 kg)
37 Semen
38 Air
39 Agregat halus
40 Agregat kasar
Total
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
MIX DESAIN RANCANGAN CAMPURAN BETON
KONTRAKTOR :PT.PRABA
PEKERJAAN :PEMBANGUNAN PLTU III KALBAR
METODE ACI K 250
PENETAPAN VARIABEL PERENCANGAN
25 N/mm2
7,5-10 cm 3.28
33.25 N/mm2
2.513
20.0 mm
2.603 t/m3
2.665 t/m3
1.5855 kg/m2
3.150 t/m3
1 t/m3
8.25 kg/cm2
1.00
PERHITUNGAN KOMPOSISI UNSUR BETON
164 kg/m3
1.5 %
0.48
0.48
0.4
410.000 kg
-
72 %
1141.560 kg
0.130 m3
0.164 m3
0.428 m3
0.02 m3
0.278 m3
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI BERAT UNSUR ADUKAN KONDISI SSD / m BETON
411 kg164 kg640 kg
1188 kg
356.4 kg
831.6 kg
8.2 Zak
2403.0 kg
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER ZAK (50 kg)
50.000 kg
19.951 kg
77.859 kg
144.526 kg
292.336 kg
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER m(50 kg)
0.016
0.020
0.030
0.054
0.120
m
m
m
m
m
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
Sambungan
KOMPOSISI PEMBUATAN SAMPEL
43 Banyak benda uji
44 Volume benda uji/benda uji
45 Semen
46 Air
47 Agregat halus
48 Agregat kasar
49 Agregat kasar Uk. 1/1 50%
50 Agregat kasar Uk. 1/2 50%
Pontianak, 24 April 2013
Laboratorium Bahan dan Konstruksi
Fakultas Teknik Untan
Kepala
IR.DHARMA SARDJANA , MT
NIP. 1952 0214 1987 10 1001
-
6.165
2.46 831.6
9.6 200 356.4
17.82 100
43.357664234
101.16788321
0.0539375689 0.081 0.2433090024
0.0911545553 0.1056
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI PEMBUATAN SAMPEL
9 Buah
0.003375 m3
12.484 kg
4.982 kg
19.440 kg
36.086 kg
Agregat kasar Uk. 1/1 50% 18.043 kg
Agregat kasar Uk. 1/2 50% 18.043 kg
Pontianak, 24 April 2013
Laboratorium Bahan dan Konstruksi
Fakultas Teknik Untan
Kepala
IR.DHARMA SARDJANA , MT
NIP. 1952 0214 1987 10 1001
-
Trial+20 %
14.98
5.98
23.33
43.30
21.65
21.65
-
JUMLAH KEBUTUHAN AGREGAT DALAM CAMPURAN BETON ( BUKIT BATU FC.25 )
JUMLAH KEBUTUHAN AGREGAT DALAM M3
SEMEN 402.083
AIR 192.220
PASIR 653.340
BATU 1141.560
BATU UK 1/1 50% 570.780
BATU UK 1/2 50% 570.780
-
JUMLAH KEBUTUHAN AGREGAT DALAM CAMPURAN BETON ( BUKIT BATU FC.25 )
JUMLAH KEBUTUHAN AGREGAT DALAM 9 SAMPEL
SEMEN 14.98
AIR 5.98
PASIR 23.33
BATU 43.30
BATU UK 1/1 50% 21.65
BATU UK 1/2 50% 21.65
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
MIX DESAIN RANCANGAN CAMPURAN BETON
KONTRAKTOR :PT.PRABA
PEKERJAAN :PEMBANGUNAN PLTU III KALBAR
METODE ACI K 250
PENETAPAN VARIABEL PERENCANGAN
1 Mutu rencana
2 Rencana Slump
3 Kekuatan tekan rencana beton
4 Modulus kehalusan pasir
5 Ukuran maksimum agregat kasar
6 Specifific Gravity halus SSD
7 Specifific Gravity kasar SSD
8 Berat volume agregat kasar
9 Specifific Gravity semen
10 Specifific Gravity air
11 Nilai Margin
12 Faktor Koreksi
PERHITUNGAN KOMPOSISI UNSUR BETON
13 Rencana air adukan /m3 beton
14 Prersentase udura yang terperangkap
15 W/C (Tabel)
16 W/C (Grafik)
17 W/C perencanaan (yang terkecil dari (15) dan (16))
18 Berat Semen = (13) / (17)
-
19 Volume agregat kasar perlu/m3 beton
20 Berat agregat kasar (19) x (8)
21 Volume semen/m3 beton =
22 Volume air/m3 beton =
23 Volume agregat kasar beton =
24 Volume udara terperangkap/m3 beton = (14)
25Volume perlu agregat halus/m3 beton
= 1m3 - ((21) + (22) + (23) + (24))
001,0)10()13(
001,0)7()20(
001,0)9()18(
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI BERAT UNSUR ADUKAN KONDISI SSD / m BETON
26 Semen = (18)27 Air (13)28 Agregat halus kondisi SSD = (25) x (6) x 1000
29 Agregat kasar kondisi SSD = (20)
30 Agregat kasar Uk.1/1 50%
31 Agregat kasar Uk.1/2 50%
32 Jumlah semen = (26) / 50
Total
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER ZAK (50 kg)
32 Semen
33 Air
34 Agregat halus
35 Agregat kasar
Total
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER m(50 kg)
37 Semen
38 Air
39 Agregat halus
40 Agregat kasar
Total
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
MIX DESAIN RANCANGAN CAMPURAN BETON
KONTRAKTOR :PT.PRABA
PEKERJAAN :PEMBANGUNAN PLTU III KALBAR
METODE ACI K 250
PENETAPAN VARIABEL PERENCANGAN
25 N/mm2
7,5-10 cm 3.28
33.25 N/mm2
2.513
20.0 mm
2.603 t/m3
2.665 t/m3
1.5855 kg/m2
3.150 t/m3
1 t/m3
8.25 kg/cm2
1.00
PERHITUNGAN KOMPOSISI UNSUR BETON
170 kg/m3
1.5 %
0.48
0.48
0.47
361.702 kg
-
72 %
1141.560 kg
0.115 m3
0.170 m3
0.428 m3
0.02 m3
0.287 m3
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI BERAT UNSUR ADUKAN KONDISI SSD / m BETON
300.000 kg180 kg
750.000 kg
1120.000 kg
560.000 kg
560.000 kg
6.00000 Zak
2350.000 kg
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER ZAK (50 kg)
50.000 kg
30.000 kg
125.000 kg
186.667 kg
391.667 kg
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER m(50 kg)
0.016
0.030
0.048
0.070
0.164
m
m
m
m
m
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
Sambungan
KOMPOSISI PEMBUATAN SAMPEL
43 Banyak benda uji
44 Volume benda uji/benda uji
45 Semen
46 Air
47 Agregat halus
48 Agregat kasar
49 Agregat kasar Uk. 1/1 50%
50 Agregat kasar Uk. 1/2 50%
Pontianak, 24 April 2013
Laboratorium Bahan dan Konstruksi
Fakultas Teknik Untan
Kepala
IR.DHARMA SARDJANA , MT
NIP. 1952 0214 1987 10 1001
-
4.5
2.7
11.25 200
16.8 100
0.0865950814 0.081 0.3333333333
0.1177336277 0.1056
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI PEMBUATAN SAMPEL
9 Buah
0.003375 m3
9.113 kg
5.468 kg
22.781 kg
34.020 kg
Agregat kasar Uk. 1/1 50% 17.010 kg
Agregat kasar Uk. 1/2 50% 17.010 kg
Pontianak, 24 April 2013
Laboratorium Bahan dan Konstruksi
Fakultas Teknik Untan
Kepala
IR.DHARMA SARDJANA , MT
NIP. 1952 0214 1987 10 1001
-
Trial+20 %
10.94
6.56
27.34
40.82
20.41
20.41
-
JUMLAH KEBUTUHAN AGREGAT DALAM CAMPURAN BETON ( BUKIT BATU FC.25 )
JUMLAH KEBUTUHAN AGREGAT DALAM M3
SEMEN 402.083
AIR 192.220
PASIR 653.340
BATU 1141.560
BATU UK 1/1 50% 570.780
BATU UK 1/2 50% 570.780
-
JUMLAH KEBUTUHAN AGREGAT DALAM CAMPURAN BETON ( BUKIT BATU FC.25 )
JUMLAH KEBUTUHAN AGREGAT DALAM 9 SAMPEL
SEMEN 10.94
AIR 6.56
PASIR 27.34
BATU 40.82
BATU UK 1/1 50% 20.41
BATU UK 1/2 50% 20.41
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
MIX DESAIN RANCANGAN CAMPURAN BETON
KONTRAKTOR :PT.PRABA
PEKERJAAN :PEMBANGUNAN PLTU III KALBAR
METODE ACI K 250
PENETAPAN VARIABEL PERENCANGAN
1 Mutu rencana
2 Rencana Slump
3 Kekuatan tekan rencana beton
4 Modulus kehalusan pasir
5 Ukuran maksimum agregat kasar
6 Specifific Gravity halus SSD
7 Specifific Gravity kasar SSD
8 Berat volume agregat kasar
9 Specifific Gravity semen
10 Specifific Gravity air
11 Nilai Margin
12 Faktor Koreksi
PERHITUNGAN KOMPOSISI UNSUR BETON
13 Rencana air adukan /m3 beton
14 Prersentase udura yang terperangkap
15 W/C (Tabel)
16 W/C (Grafik)
17 W/C perencanaan (yang terkecil dari (15) dan (16))
18 Berat Semen = (13) / (17)
-
19 Volume agregat kasar perlu/m3 beton
20 Berat agregat kasar (19) x (8)
21 Volume semen/m3 beton =
22 Volume air/m3 beton =
23 Volume agregat kasar beton =
24 Volume udara terperangkap/m3 beton = (14)
25Volume perlu agregat halus/m3 beton
= 1m3 - ((21) + (22) + (23) + (24))
001,0)10()13(
001,0)7()20(
001,0)9()18(
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI BERAT UNSUR ADUKAN KONDISI SSD / m BETON
26 Semen = (18)27 Air (13)28 Agregat halus kondisi SSD = (25) x (6) x 1000
29 Agregat kasar kondisi SSD = (20)
30 Agregat kasar Uk.1/1 50%
31 Agregat kasar Uk.1/2 50%
32 Jumlah semen = (26) / 50
Total
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER ZAK (50 kg)
32 Semen
33 Air
34 Agregat halus
35 Agregat kasar
Total
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER m(50 kg)
37 Semen
38 Air
39 Agregat halus
40 Agregat kasar
Total
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
MIX DESAIN RANCANGAN CAMPURAN BETON
KONTRAKTOR :PT.PRABA
PEKERJAAN :PEMBANGUNAN PLTU III KALBAR
METODE ACI K 250
PENETAPAN VARIABEL PERENCANGAN
25 N/mm2
7,5-10 cm 3.28
33.25 N/mm2
2.513
20.0 mm
2.603 t/m3
2.665 t/m3
1.5855 kg/m2
3.150 t/m3
1 t/m3
8.25 kg/cm2
1.00
PERHITUNGAN KOMPOSISI UNSUR BETON
193 kg/m3
1.5 %
0.48
0.48
0.48
402.083 kg
-
72 %
1141.560 kg
0.128 m3
0.193 m3
0.428 m3
0.02 m3
0.251 m3
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI BERAT UNSUR ADUKAN KONDISI SSD / m BETON
402.083 kg192.228 kg653.450 kg
1141.560 kg
570.780 kg
570.780 kg
8.04167 Zak
2389.322 kg
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER ZAK (50 kg)
50.000 kg
23.904 kg
81.258 kg
141.956 kg
297.118 kg
BETON NORMAL KOMPOSISI UNSUR ADUKAN PER m(50 kg)
0.016
0.024
0.031
0.053
0.124
m
m
m
m
m
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
Sambungan
KOMPOSISI PEMBUATAN SAMPEL
43 Banyak benda uji
44 Volume benda uji/benda uji
45 Semen
46 Air
47 Agregat halus
48 Agregat kasar
49 Agregat kasar Uk. 1/1 50%
50 Agregat kasar Uk. 1/2 50%
Pontianak, 24 April 2013
Laboratorium Bahan dan Konstruksi
Fakultas Teknik Untan
Kepala
IR.DHARMA SARDJANA , MT
NIP. 1952 0214 1987 10 1001
-
6.03125
2.88342
9.8017538058 200
17.1234 100
0.0562923884 0.081
0.0895336788 0.1056
-
LABORATORIUM BAHAN DAN KONSTRUKSI
FAKULTAS TEKNIK
JURUSAN TEKNIK SIPIL
UNIVERSITAS TANJUNGPURA
Jalan Jenderal Achmad Yani 78124 Telepon ( 0561 ) 577718 Kotak Pos 1049
KOMPOSISI PEMBUATAN SAMPEL
9 Buah
0.003375 m3
12.213 kg
5.839 kg
19.849 kg
34.675 kg
Agregat kasar Uk. 1/1 50% 17.337 kg
Agregat kasar Uk. 1/2 50% 17.337 kg
Pontianak, 24 April 2013
Laboratorium Bahan dan Konstruksi
Fakultas Teknik Untan
Kepala
IR.DHARMA SARDJANA , MT
NIP. 1952 0214 1987 10 1001
-
Trial+20 %
14.66
7.01
23.82
41.61
20.80
20.80
-
JUMLAH KEBUTUHAN AGREGAT DALAM CAMPURAN BETON ( BUKIT BATU FC.25 )
JUMLAH KEBUTUHAN AGREGAT DALAM M3
SEMEN 402.083
AIR 192.220
PASIR 653.340
BATU 1141.560
BATU UK 1/1 50% 570.780
BATU UK 1/2 50% 570.780
-
JUMLAH KEBUTUHAN AGREGAT DALAM CAMPURAN BETON ( BUKIT BATU FC.25 )
JUMLAH KEBUTUHAN AGREGAT DALAM 9 SAMPEL
SEMEN 14.66
AIR 7.01
PASIR 23.82
BATU 41.61
BATU UK 1/1 50% 20.80
BATU UK 1/2 50% 20.80
-
KEMENTERIAN PENDIDIKAN NASIONALUNIVERSITAS TANJUNGPURA
FAKULTAS TEKNIKLABORATORIUM BAHAN DAN KONSTRUKSI
Jenderal A. Yani - Pontianak 78124 Phone: (0561) 740186, 0561 57718Nomor : /TEST-KUB/LB&K/VIII/2013Sample : Kubus 15x15x15 cm Pekerjaan : Pembangunan Lokasi :
No. KODE TANGGAL COR TEKAN
1 K.225 30/07/13 02/08/13 3 9.96 8.15 2252 K.225 30/07/13 02/08/13 3 9.96 8.10 2253 K.225 30/07/13 02/08/13 3 9.96 8.10 2254 K.225 30/07/13 02/08/13 3 9.96 8.09 225
= 295.51 (Kg/cm)
= 5.18 (Kg/cm)
= 289.50 (Kg/cm)
TANGGAL TEST
UMUR (HARI)
SLUMP (cm)
BERAT (Kg)
LUAS BIDANG
(cm2)
-
KEMENTERIAN PENDIDIKAN NASIONALUNIVERSITAS TANJUNGPURA
FAKULTAS TEKNIKLABORATORIUM BAHAN DAN KONSTRUKSI
Jenderal A. Yani - Pontianak 78124 Phone: (0561) 740186, 0561 57718Kontraktor : PT. Dihitung : Laboratorium Bahan dan Konstruksi
Fakultas Teknik UNTAN
BEBAN
P Load 28 HARI(KN) (Kg) (Kg/cm) (Kg/cm)350 35677.88 158.57 288.31 -7.21 51.95365 37206.93 165.36 300.66 5.15 26.51360 36697.25 163.10 296.54 1.03 1.06360 36697.25 163.10 296.54 1.03 1.06
1,182.06 80.58
Pontianak,5 Agustus 2013Laboratorium Bahan dan KonstruksiFakultas Teknik UNTANKepala
BEBAN MAKSIMUM
KUAT TEKAN
KUAT TEKAN (b'-bm')
(Kg/cm)(b'-bm') (Kg/cm)
-
Ir.Dharma Sardjana MTNIP. 19520214 1987 101001
-
Tabel 1 W/C Ratio Berdasarkan Jenis Konstruksi dan Kondisi Lingkungan
Jenis Konstruksi
KONDISI LINGKUNGAN
Kondisi Normal
0.53
*
-
*
*
*W/C ratio ditentukan berdasarkan persyaratan kekuatan tekan rencana beton Tabel II atau Grafik I
Konstruksi Langsing atau yang hanya mempunyai penutup tulangan kurang dari 2.5 cm
Struktur dinding penahan tanah, pilar, balok
Beton yang tertanam dalam air, pilar, balokStruktur lantai beton diatas tanahBeton yang terlindung dari perubahan udara (konstruksi interior )
-
Tabel 1 W/C Ratio Berdasarkan Jenis Konstruksi dan Kondisi LingkunganKONDISI LINGKUNGAN
0.49 0.4
0.53 0.44
0.44 0.44
- -
- -
*W/C ratio ditentukan berdasarkan persyaratan kekuatan tekan rencana beton Tabel II atau Grafik I
Basah Kering Berganti-ganti
Mendapat Pengaruh Sulfat dan Air Laut
-
Tabel II Hubungan Antara W/Ratio Dengan Kuat Tekan Beton
Kekuatan Tekan Beton Umur 28 Hari ( kg/cm) Nilai Rata-rata W/C
420 0.44350 0.53280 0.62210 0.73140 0.89
*Nilai pada tabel II berdasarkan atas ukuran terbesar agregat kasar berdiameter 2.5 cm
-
*Nilai pada tabel II berdasarkan atas ukuran terbesar agregat kasar berdiameter 2.5 cm
-
Tabel III Ukuran SLUMP yang dianjurkan bagi berbagai jenis konstruksi
URAIAN SLUMP ( cm )maksimun minimum
8,00 2,50
8,00 2,50
pelat, balok, kolom, dan dinding 10,00 2,50
pekerasan jalan 8,00 2,50pembetonan masal 5,00 2,50
Dinding pelat pondasi dan pondasi telapak bertulang pondasi telapak tidak bertulang, kaison dan konstruksi dibawah tanah
* Nilai pada tabel III berlaku untuk pemadatan menggunakan alat penggetar. Untuk cara pemadatan yang lain, nilai slump dapat dinaikan 2,5 cm lebih besar.
kadar lumpurkadar airGradasi Sandcombin 2 stoneGradasi Stone 1.1Gradasi Stone 1.2Berat JenisBerat VolumeBG.FANNYc15c30c25JMF 250kuat tekan k.250Tabel ITabel IITabel III
top related