© 2013 Fire & Safety Consulting, LLC © 2013 Fire and Safety Consulting

Photo Album for Augusta, ME

Job # 26899 W/O # 15925384

November 1, 2013 This week in Appleton, the chassis finished assembly

and was being prepared for shipment to Florida. At the

Bradenton facility, the pump manifold had plumbing

installed as the body continued with fabrication. Next

week the chassis should be in transit to Florida, the

pump house may begin initial assembly and the body

should finish fabrication and begin the paint process.

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC02327 DSC02328

DSC02329 DSC02330

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC02331 DSC02332

DSC02333 DSC02334

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC02335 DSC02336

DSC02337 DSC02338

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC02339 DSC02340

DSC02341 DSC02342

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC02343 DSC02344

DSC02345 DSC02346

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC02347 DSC02348

DSC02349 DSC02350

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC02351 DSC02352

DSC02353 DSC02354

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC02355 DSC02356

DSC02357 DSC02358

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC02359 DSC02360

DSC02361 DSC02362

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC02363 DSC02364

DSC02365 DSC02366

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC08197 DSC08198

DSC08199 DSC08200

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC08201 DSC08202

DSC08203 DSC08204

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC08205 DSC08411

DSC08412 DSC08413

© 2013 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC08414 DSC08415

DSC08416 DSC08417

top related