item location recommendation reason€¦ · item location recommendation reason 1 30th st between...

Post on 14-Jun-2020

6 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Item Location Recommendation Reason

1

30th St between Idylwyld Dr & Ave C

(south side between Idylwyld Dr & Ave C);

Ave F between parking lot south of pool &

31st St (west side); Ave D (portions on

east side, north & south of 23rd St to

connect to existing)

Install Sidewalk Improve pedestrian safety near parks, schools, playgrounds, bus routes

2 Ave C 30th St St Change yield signs to stop signs Enhance compliance

3 Ave D & 30th StInstall "no parking" sign on 30th St (southeast corner)

10mImprove visibility for drivers northbound

4a Ave E & 30th St

Install median islands (west & south legs); install

accessibility ramps & pathway connection on north

side (Refer to picture #4a)

Improve pedestrian safety near park; reduce speeds around south curve of

park; ensure proper turning movement; provide access to park path

4b Ave E & 30th St

Install curb extension on 30th St (southwest corner) &

median island on Ave E; install accessibility ramps &

pathway connection on north side (Refer to picture

#4b)

Improve pedestrian safety near park; reduce speeds around south curve of

park; ensure proper turning movement; provide access to park path

5 29th St & Ave B Install pedestrian corridor & zebra crosswalk Improve pedestrian safety near school

6 29th St & Ave C Install zebra crosswalk Improve pedestrian safety

7 Jamieson St & Ave C Change yield sign to stop sign Enhance compliance

8 Avenue D & 23rd St

Install median island, signage, & pavement markings

to restrict northbound through movement; "no parking"

signs 10m (Refer to picture #8) (Subject to CP

approval)

Reduce collisions; provide guidance

9 Ave F & 31st StInstall curb extensions & median island on Ave F

(south side)Improve pedestrian safety near park; reduce speeds

10 Ave D & 31st St Install curb extension on Ave D (southeast corner) Improve pedestrian safety near park; reduce speeds

11 Ave F & 30th StChange yield sign to stop sign; install closer to

intersection

Enhance compliance; existing location of yield sign is far back from the

intersection

12 Ave H & 31st StInstall zebra crosswalks on 31st St (north & south

legs)Improve pedestrian safety

Call in to request

1 Enforcement (ie ignoring traffic controls; truck routes) 306-975-8068 OR 306-975-8300 (Saskatoon Police Services)

2 Parking restrictions 306-975-2454 (City of Saskatoon - Transportation)

3 Tree trimming (ie. obstructing sign; driver's view) 306-975-3300 (City of Saskatoon - Parks)

Additional improvements through other projects

1 Safety Pathway - improvements will be made at the pedestrian crossings on Ave C & Ave D as part of this project

2 23rd St/Blairmore Bikeway (temporary pinch point between Ave E/AveF; Ave H) - concerns were sent to Project Manager & will be reviewed as part of this project

TRAFFIC SIGNAL LOCATION

PEDESTRIAN ACTUATEDSIGNAL LOCATION

STOP SIGN

YIELD SIGN

BUS ROUTE

CASWELL HILL TRAFFIC PLAN

ACTIVE PEDESTRIAN CORRIDOR LOCATION

X

SEE SHEET HANDOUT

1

8

1

7

65

11

23

4

11

12

1

9

10

top related