Integrated Transport System Project
1
Southwest ITS
South ITS
2
With the worsening traffic situation, DOTr and this administration are pressed to deliver immediate solutions for traffic congestion and lack of reliable
public transportation.
Rationale
Location of Existing PUB Stops/ Terminals
Pasay Rotonda, Pasay City
Cubao – Kamuning, Quezon City
Manila
Balintawak, Quezon City
North EDSA, Quezon City
Buendia Area, Pasay City
Terminals: • 85 provincial bus terminals in MM• Ave. capacity of 90 buses• 46 terminals are located along
EDSA
Background
Southwest ITS2,009 daily bus
volume
North ITS3,217 daily bus
volume Prov Bus
Facts :13,609 buses ply Metro Manila• 8,266 are provincial buses• 5,343 are city buses• 3,711 city buses ply EDSA
.
Monumento
Baclaran South ITS4,224 daily bus volume
NLE
X
5
The Intermodal Transport System is the optimal solution to traffic congestion.
• To provide effective interconnections betweentransport modes and services, therebyensuring efficient and seamless travel for thecommuting public
• To lessen vehicle density by preventingprovincial buses from entering Metro Manila
– In 2013, there are 8,285 registered provincial buses bus units plying MM
6
Objectives of Integrated Transport System
Legal Basis
Executive Order No. 67 (EO 67)
Mandate: Establishment of 3 mass transportation intermodal terminals at the outskirts of Metro Manila
1. Southwest Terminal to serve passengers from the Cavite sidePhilippine Reclamation Area (PRA) near UniwideCoastal Mall in Paranaque City
2. South Terminal to serve passengers from the Laguna/Batangas side Food Terminal Incorporated (FTI) Site in Taguig City
3. North Terminal to serve passengers from northern LuzonNear the Northern segment of EDSA
7
Project Benefits
An integrated bus terminal provides for: • State-of-the-art amenities for passengers and bus
operators• Seamless transfers for the passengers
– Fixed departure schedules for provincial buses– Centralized ticketing system for provincial buses– Availability of other transport modes (city bus, PUJ,
AUV) at one location
• Helps in eradication of illegal bus operations• Increased tourism using public transport
8
Key Features
• Separate Embarking (Departure) and Disembarking (Arrival) Bays for provincial and city buses
• Drop-off and pick-up areas for other public utility vehicles
• Public Information Systems
• Facilities for Persons with Disabilities
• Parking areas for private vehicles, taxis, and PUVs
• Wi-Fi, Drinking water, comfort rooms, etc.
9
Information Display & Passenger Waiting Area
Key Features
Centralized Ticketing Area
Key Features
Perspectives – Passenger Waiting Area
Key Features
Integrated Transport System Projects
• Southwest ITS (Ongoing Construction)
• South ITS (For DED Completion)
• North ITS (For Feasibility Study)
Southwest Terminal Project for the
Integrated Transport System
14
Southwest ITS Project Overview
15
Objective Provide for the establishment of an integrated transport terminal to provide an effective interconnection between different transport modes to serve passengers from the Cavite side
Scope 1. Construction of the Southwest Terminal2. Construction of access roads3. Operations and maintenance of the terminal facilities
Project Structure Build-Transfer-and-Operate
Project Cost PHP2.5B
Project Concessionaire
MWM Terminals, Inc.• Megawide Construction Corporation• WM Property Management, Inc.
Concession Period 35 years from Construction Start Date
Status • Concession Agreement signed on 24 April 2015• On-going (Pile diving completed)
Target Completion Date
• APRIL 2018
TO CAVITE
TO MANILA
R-1 EXPRESSWAY
PROJECT SITE- PART 1(2.9 HECTARE)
DIOSDADO MACAPAGAL BOULEVARD
PROJECT SITE- PART 2(1.69 HECTARE)
Location of Proposed
LRT Station
TOTAL PROJECT SITE- 4.59 HECTARE
Access Roads to be developed by the Concessionaire
16
Southwest Terminal Project Site
PREVIOUS TO DATE
Ongoing Construction Activities
TERMINAL AREA
TOTAL PROJECT LOT – PART 1 2.9 ha
TOTAL FLOOR AREA (4 FLOORS PODIUM)
90,176 sqm
TOTAL FLOOR AREA WITH TOWERS 169,110 sqm
TOTAL FLOOR AREA TERMINAL 24,852 sqm
TOTAL WAITING FLOOR AREA 15,944 sqm
TOTAL RETAIL FLOOR AREA 12, 445 sqm
TOTAL PARKING FLOOR AREA 36,925 sqm
STAGING AREA
TOTAL PROJECT LOT – PART 2 1.69 ha
TOTAL CAPACITY 100 BUSES
GROUND FLOOR (Departure Area):
FLOOR AREA (in sq.m)
TERMINAL 12,416.09
PODIUM LEASABLE 2,975.23
COMMON / WAITING AREA* 7,849.94
SUPERMARKET** 1,851.93
OFFICE LOBBY/ENTRANCE
1,055.68
GF TOTAL 25,878.87
*Common / Waiting areas will include Ticketing Booths, Bathrooms, Changing Area etc.
**Can be converted to bus bays should there be a requirement for additional bus bays in the future.
VEHICLE NO. OF BAYS
BUSES PROVINCIAL 30
METRO 6
AUVS 16
JEEPNEYS 5
FLOOR AREA (in sq.m)
TERMINAL 11,283.92
PODIUM LEASABLE 5,501.20
COMMON / WAITING AREA
7,599.41
OFFICE LOBBY/ENTRANCE 776.72
UTILITIES 1,472.54
2F TOTAL 26,663.79
VEHICLE NO. OF BAYS
BUSES PROVINCIAL 17
METRO 6
SECOND FLOOR (Arrival Area):
*Common / Waiting areas will include Ticketing Booths, Bathrooms, Changing Area etc.
FLOOR AREA (in sq.m)
PARKING* 23,023.33
RETAIL LEASABLE 653.87
COMMON / WAITING AREA
494.79
OFFICE LOBBY/ENTRANCE 1,106.20
UTILITIES 1,355.60
3F TOTAL 26,663.79
THIRD FLOOR (Parking Area/LRT Interface):
*Total of Parking Slots of 3rd Level of 562
FLOOR AREA (in sq.m)
PARKING* 13,967.94
OFFICE LOBBY/ENTRANCE 12,665.85
4F TOTAL 26,663.79
FOURTH FLOOR (Parking Area/Office Tower)
*Total of Parking Slots of 4th Level of 289
TOTAL REMAINING FLOOR AREA PER OFFICE TOWER (in sq.m) **
76, 651.16
*includes areas and rooms located at the roof deck
South Terminal Project for the
Integrated Transport System
23
South Terminal:Project Overview
24
Objective Provide for the establishment of an integrated transport terminal to provide an effective interconnection between different transport modes to serve passengers from the Laguna/Batangas side
Scope 1. Construction of the South Terminal2. Operations and maintenance of the terminal facilities
Project Structure Build-Transfer-and-Operate
Project Cost PHP4B (NEDA approved cost)
Project Concessionaire
ARCA South Integrated Terminal, Inc. (Ayala Land, Inc.)
Concession Period 35 years from Construction Start Date
Status • Concession Agreement signed on 26 January 2016
Target Start Date • SEPTEMBER 2017
Target Completion Date
• MARCH 2019
South Terminal Project Site
25
26
Development Parameters
South ITS
Site Devt. Portion GLA (SQM) GFA (SQM) GPA (SQM) CFA (SQM)
North Parcel & Holding Area 29,613 29,613
South Parcel - Site devt. 15,800 15,800
Others 3,884 3,884
Total 3,884 45,413 49,297
Building Portion GLA (SQM) GFA (SQM) GPA (SQM) CFA (SQM)
Retail 8,264 13,509 13,509
Passenger Concourse 5,928 5,928 5,928
Retail Required Parking 4,083 4,083
ITS Required Parking 15,872 15,872
Total 14,192* 19,437 19,955 39,392Total Development 14,192 23,321 65,368 88,689