improvement in inward productivity
Post on 06-Apr-2018
222 Views
Preview:
TRANSCRIPT
-
8/2/2019 Improvement in Inward Productivity
1/36
-
8/2/2019 Improvement in Inward Productivity
2/36
Improvement in InwardProductivity
with respect to
system enhancementand
productivity standards
-
8/2/2019 Improvement in Inward Productivity
3/36
INTRODUCTION
TO SUPPLY CHAINMANAGEMENT
-
8/2/2019 Improvement in Inward Productivity
4/36
y Supply chain management (SCM) is the management of a network ofinterconnected businesses involved in the ultimate provision of productand service packages required by end customers.
y Supply Chain Management spans all movement and storage of rawmaterials, work-in-process inventory, and finished goods from point oforigin to point of consumption (supply chain).
-
8/2/2019 Improvement in Inward Productivity
5/36
Future Supply Chain Solutions Ltd
y Future Supply Chain Solutions Ltd, the logistics and supply chainvertical ofFuture Group, is India's first end - to - end Consumer
Logistics Company.
y FSCSL provides various solutions like warehousing transportation
reverse logistics international logistics and scm.
-
8/2/2019 Improvement in Inward Productivity
6/36
Futuresupplychains
solutionslimited
Food supplychain
Fashionsupply chain
Homesupplychain
GeneralMerchandisesupplychain
-
8/2/2019 Improvement in Inward Productivity
7/36
PROJECT GOAL
y This project was basically done in FSCSL warehouse which mainlyworks on five processes INWARD, PUTAWAY, PICKING, PUT TO
LIGHT, and finally the OUTWARD.
y This project focuses the INWARD FUNCTION, how its productivity canbe improved by setting a target which can be achieved in normal
conditions and how the system should be enhanced in order to boostthe productivity.
-
8/2/2019 Improvement in Inward Productivity
8/36
PROCESS CARRIED OUT IN WAREHOUSE
y INWARD
y PUTAWAY
y PICKING
y PUT TO LIGHT
y OUTWARD
-
8/2/2019 Improvement in Inward Productivity
9/36
INWARD
-
8/2/2019 Improvement in Inward Productivity
10/36
PUT-AWAY
-
8/2/2019 Improvement in Inward Productivity
11/36
PICKING
-
8/2/2019 Improvement in Inward Productivity
12/36
-
8/2/2019 Improvement in Inward Productivity
13/36
SYSTEMANALYSIS
-
8/2/2019 Improvement in Inward Productivity
14/36
WORKING OF HAND HELD UNIT
-
8/2/2019 Improvement in Inward Productivity
15/36
PROCESS
y START
y Enter the hht name, server name, user login, password
y Enter the warehouse number (i.e. select the ware house)
y Enter into the menu Pre receiving , Receipt, Put Away, Picking
y Select 0 for pre receiving then 1 for pre-receipt
y Enter asn no, lane id, pallet id, total quantity of box , damage box
y If more number of boxes are present then repeat
y If the process is complete then go back using escape till inbound gp and
y Enter 2 for generating gp
-
8/2/2019 Improvement in Inward Productivity
16/36
FLAWS and SOLUTION
y Every time the for each delivery the system has to login enter thehht name, server name user login and password so thats timeconsuming instead there should be a option for new delivery
y If there are more number of pallets for one delivery then it has torepeat the process from beginning that is entering the asn no, laneid, pallet id, then tot box and damage box etc instead we shouldkeep an option where it asks for if more number of tot boxes if yesproceed else break.
y No option to go to generate igp directly after the pre- receiving iscomplete instead after the completion of pre receiving it shouldshow the menu from where it can enter into generate igp
-
8/2/2019 Improvement in Inward Productivity
17/36
SOLUTION GIVEN TO THE WORKING OFHAND HELD UNIT
-
8/2/2019 Improvement in Inward Productivity
18/36
WMS WORKING
y Enter using the user id
y Select the warehouse
y Go into inbound logistics and then asn/receipt
y Then paste the delievery number and get the asn no
y Start with the pre receiving
y Enter all the details:- invoice no, invoice quantity, vehicle no, expectedboxes for a particular asn
y Give the appointment time to the delievery in order to show tthat thegoods has reached the warehouse and get the asn no assigned to it.
-
8/2/2019 Improvement in Inward Productivity
19/36
-
8/2/2019 Improvement in Inward Productivity
20/36
SAP PROCESS
y Login the process
y Get the general delivery list by entering the out bound deliveries
y Enter the goods movement date and date pass no
y Get the item view and header view for delivery details (quantity anddate), SU, quantity.
y Maintain a spread sheet for the delivery details
y Manually fill the details of delivery no article description category,su, asn no, quantity, no of boxes
-
8/2/2019 Improvement in Inward Productivity
21/36
-
8/2/2019 Improvement in Inward Productivity
22/36
SUGGESTIONS
y Making a common database system which importsthe required details from the sap and add the asn no,
no of boxes and quantity from wms system
y This can be done using any compatible databasesystem and keeping the delivery number as the
primary key since both the system has it andimporting the required details.
-
8/2/2019 Improvement in Inward Productivity
23/36
SOLUTION
-
8/2/2019 Improvement in Inward Productivity
24/36
-
8/2/2019 Improvement in Inward Productivity
25/36
PRODUCTIVITY
STANDARDS
-
8/2/2019 Improvement in Inward Productivity
26/36
UNLOADING: 225 boxes/manhr.
SRNO DATA BOXES/MANHR
BOXES/HR
1 25 mins---210 boxes 252 504
2 25 mins----30 boxes 516 1032
3 34 mins----431 boxes 380 760
4 10 mins----187 boxes 561 1122
5 20 mins----351 boxes 527 1053
6 10 mins----150 boxes 450 900
7 35 mins----580 boxes 497 994
AVG 454 909
-
8/2/2019 Improvement in Inward Productivity
27/36
y As per observations Average boxes per car is around 350to 550 and it takes on an average half hr to unload so
y
454 boxes /half hr == 450boxes/half hr
y 909boxes/half hr==900/hr
y 900 boxes can be done by four men working together
i.e 225 boxes per person per hour
-
8/2/2019 Improvement in Inward Productivity
28/36
UNLOADING WITH PRE-RECEIVING:110boxes/manhr
SRNO DATA BOXES/HR
1 60 mins416 boxes 416
2 50 mins342 boxes 410
3 60 mins359 boxes 359
4 45 mins410 boxes 546
5 50 mins------399 boxes 479
AVG 442
-
8/2/2019 Improvement in Inward Productivity
29/36
y As per observations
If the truck is unloaded and pre receiving is done atthe same time then it takes 440 boxes /hr.
y Even this 440 boxes were unloaded by 4 men.
y
Thus 110 boxes per person per hour.
-
8/2/2019 Improvement in Inward Productivity
30/36
PRE RECEIVING: 30 pallets/manhr
-
8/2/2019 Improvement in Inward Productivity
31/36
y Max to Max say every truck takes 18 to 20 pallets
y Each pallet takes 2 mins
y Therefore 20 pallets takes 40 mins
y
In one hr one man can do 30 pallets
-
8/2/2019 Improvement in Inward Productivity
32/36
UNWRAPPING: 130 boxes/hr.
y When observed regularly for a week it was observedthat on an average in initial part of day the workerscan unwrap more boxes . There capacity to workreduces as the day comes to an end.
y Considering the fact of human capacity to performtheir activities reduces as the day
y 8 different readings taken at different times (180boxes/hr,162boxes/hr, 145 boxes/hr, 132 boxes/hr,117 boxes/hr, 105 boxes/hr, 95 boxes/hr)
-
8/2/2019 Improvement in Inward Productivity
33/36
SEGREGATION: 130 boxes/hr.
y Observation for segregation process was also carried outin similar pattern to unwrapping.
y 8 different readings taken at different times(200boxes/hr,157boxes/hr, 150 boxes/hr, 132 boxes/hr,122 boxes/hr, 100 boxes/hr)
y AFTERTHE OBSERVATIONIT WAS SEENTHATUNWRAPPING AND SEGREGATIONTAKESMORE ORLESS TAKE SAME TIME
-
8/2/2019 Improvement in Inward Productivity
34/36
RECEIVING: 50 skus/hr.
-
8/2/2019 Improvement in Inward Productivity
35/36
Productivity standards
y Thus following productivity standards/measures were achieved after keenobservations
y 1 UNLOADING: 225 boxes/manhr.
y
2 UNLOADING WITH PRE RECEIVING: 110 boxes/manhr.
y 3 PRE RECEIVING: 30 pallets/manhr
y 4 UNWRAPPING: 130 boxes/hr.
y
5 SEGREGATION: 130 boxes/hr.
y 6 RECEIVING: 50 skus/hr.
-
8/2/2019 Improvement in Inward Productivity
36/36
THANK YOU
HAVE A NICE
DAY
..
top related