Implementation of Energy Conservation Building Code (ECBC) in India

Kanagaraj Ganesan

23 October, 2017

GSTIC, Brussels

Outline

Introduction to Energy Conservation Building Code (ECBC) India

Implementation of ECBC

Key interventions for ECBC implementation

3

The Energy Conservation Act was enacted on 1st October, 2001.

The Bureau of Energy Efficiency (BEE) was set up on 1st March, 2002.

It is a statutory body under the Ministry of Power, under the provisions of the EC Act.

The Energy Conservation Building Code (ECBC) was developed by BEE and launched on 27th May, 2007.

It was revised and relaunched on 19th June, 2017.

Birth of the Code

Journey of the Code

4

2001 2007 2010

EC Act

ECBC

Published

EC Act

Amended

2011

ECBC

Notification

Odisha

2012

ECBC

Notification

Rajasthan

2013

ECBC

Notification

Uttarakhand

2017 2016 2014

ECBC

Notification

Karnataka &

Andhra

Pradesh

ECBC Notification

Haryana & Punjab.

Civil SoR

published by

Karnataka.

Online ECBC

approval system

by GHMC.

ECBC

Revised

From

to

Components of ECBC

5

Bu

ildin

g E

nve

lope

Components of ECBC

6

Com

fort

Syste

m &

Contr

ols

Components of ECBC

7

Lig

htin

g &

Co

ntr

ols

Components of ECBC

8

Ele

ctr

ica

l &

Ren

ew

ab

le

Energ

y S

yste

ms

Compliance Approach

9

Mandatory

Requirement

s

Prescriptive Method

Whole Building

Performance Method

Trade-off Method (for Building Envelope only)

- Building Envelope

- Comfort System &

Controls

- Lighting & Controls

- Electrical &

Renewable Energy

Systems

Required for ALL

compliance

methods

Applicable

Components

Compliance

Methods

Implementation Approach

10

Central

Government

State

Government

Local

Government

ECBC

development

and updating

Amend

ECBC to

meet state

requirement

s

Notification

of ECBC in

the State

Gazette

Revision of DCR/Model

Building Bye-laws

Revision of ULB bye-laws and approval

process

Enforcement of ECBC

ECBC Implementation Support

- Capacity Building

- Demonstration Projects

- Revision of Schedule of Rates

- Compliance Tools

- Monitoring and Verification (M&V) system,

etc.

11

Looking at ECBC through the prism of…

Technology ECB

C

2017

Development of the Code

ECBC Cell

BEP & EMIS Tool

Development of the Code

Analysis of 16 different non-residential

building typologies

Life-cycle costing

Market assessment of materials and technologies

Consulting with professional

bodies

Discussion with building sector stakeholders

Dynamic energy simulations

R&D,

Incentives,

Rating

systems

“Pull” the

Market

Minimum

Standards

“Push”

the Market

Increasing Energy Efficiency

EE

Pro

du

cts

ECBC

2007

ECBC

2017

ECBC

+

Super

ECBC

ECBC Cell

ECBC implementation and enforcement is done at the state and local level.

The cells bridge knowledge, technical and human resource gap in the state.

The composition of the cells differs in different parts of the country.

The cells have a mixture of architects and engineers from different

streams (mechanical, electrical, etc.), as per requirement of the

particular cell.

The cells mainly do three types of activities:

Regulatory Framework

Assistance

Demonstration

Projects Capacity Building

- Prepare

documentation for

notification (Supports

SDA)

- Update code to suit

local requirements

(Supports UDD)

- Update the SoR

(Supports PWD)

- Amend the bye-laws

(Supports ULB)

- Pilot projects are

done in states where

ECBC has been

notified

- Cells work with PWD

and other govt.

agencies to implement

these projects

- Provide logistical

support to SDA for

conducting training

programmes

- Conduct training

programmes for govt.

officials

16

Updating the SoR in Karnataka

SoR Schedule of Rates

SoR is a reference document followed by PWD and some Public Sector Undertakings (PSUs) for providing material and technology specifications and for cost calculations.

ECBC cell assisted Karnataka PWD in updating the SoR to include energy efficient materials and technologies.

Karnataka has two distinct SoR documents – one for civil works, another for electrical & mechanical works.

17

Existing Cells

ECBC cells have been established

in 13 states and 1 union territory

States (in green): Andhra Pradesh

Chhattisgarh

Haryana

Himachal Pradesh

Karnataka

Kerala

Punjab

Telangana

Uttar Pradesh

Union Territories

(in magenta): NCT of Delhi

Cells established by

EU (in orange): Bihar

Madhya Pradesh

Maharashtra

Odisha

18

Upcoming Cells

ECBC cells are in the process of

being established in 15 states

and 5 union territories

States (in blue): Arunachal Pradesh

Assam

Goa

Gujarat

Jharkhand

Karnataka

Manipur

Meghalaya

Mizoram

Nagaland

Rajasthan

Sikkim

Tripura

Uttarakhand

West Bengal

Union Territories

(in orange): Andaman & Nicobar Islands

Dadra & Nagar Haveli

Daman & Diu

Lakshadweep

Puducherry

BEP & EMIS Tool

Building Energy Passport

A unified identity of the

energy performance of a

building during the design,

construction and operation

phase.

A way to combine

compliance check and

rating.

Will work in coordination

with the Energy Monitoring

Information System (EMIS)

tool.

Thank you!