ilc americas cavity and cryomodule r&d shekhar mishra ilc program fermilab talk presented at doe...
Post on 19-Jan-2016
223 Views
Preview:
TRANSCRIPT
ILCAmericas
Cavity and Cryomodule R&D
Shekhar MishraILC Program
Fermilab
Talk presented at DOE Annual Program Review
Breakout Sessions – Wednesday, May 17
ILCAmericas ILC Cavity and Cryomodule R&D Goals
• ILC R&D at Fermilab is focused to address the high priority ILC design and technical issues as recommended by ILC-TRC and recently by ILC-GDE R&D Board.
• The main thrust of the ILC Cavity and Cryomodule R&D is to establish technical capabilities in the Superconducting Radio Frequency (SRF) Cavity and Cryomodule technology. The main goals are
– Cavity technology development in the US to routinely achieve > 35 MV/m and Q ~0.5-1e10,
– ILC Cryomodule design, fabrication (cost reduction)
– Fully tested basic building blocks of the Main Linac (Evaluate the integration, reliabilities issues and value engineering).
– LLRF, Instrumentation and Controls development for Main Linac
• Development of U.S. laboratories and industrial infrastructure for the fabrication, processing and testing of high performance SRF cavities, Coupler, Tuner, HOM and Cryomodule.
ILCAmericas Plans for 35 MV/m• Cavity Fabrication, Preparation, Surface Processing, Clean Surface and Clean
environment is the key to achieving a high gradient in the ILC cavities.
• Fermilab is leading the US effort with collaborating laboratories.
– Niobium is being scanned at Fermilab. (Need larger inventory. There are variation from batch to batch, vendor to vendor etc.)
– Cavity is being fabricated at industry under the supervision of Fermilab and Cornell. Jlab will join this soon.
– Cavity is being processed (BCP and EP) and vertical tested at Cornell, Jlab and will be processed at ANL/FNAL
• The processing infrastructure needs more focused effort. Experiences from DESY and KEK suggest that we build this facility at where cavity is dressed, horizontally tested and put in a string.
• We are in process of having this facility at Fermilab by 07.
• Fermilab is fabricating 8 (FY05), 16(FY06), 24-36 (FY07) ILC cavities. More could be needed to
• These cavities will be systematically processed and testing. We would systematically collect data during the fabrication, processing and testing.
• These data would be analyzed for co-relations to understand the process.
ILCAmericas ILC Cavity: R&D
• Material R&D: Fine, Large, Single Crystal
• Fabrication– A number of minor modifications and improvements could
be implemented without impact to the basic cavity design.
• Cavity Preparation
• Buffer Chemical Processing
• Cavity Processing R&D– Electro-polishing (EP) System– High Pressure Rinsing (HPR)– Clean Assembly Procedure
ILCAmericas Cavity Fabrication
• Industrial production of the cavity by Fermilab (ACCEL, AES)
• 8 TESLA Design Cavities ordered• 10 ILC Baseline Design Cavities in FY06
• Cavity fabrication at Jlab• 2 ILC Baseline design and Type-IV• 2 Low Loss Cavity• Several single cell for Process and Material R&D • Material R&D (Fine Grain, Large Grain, Single Crystal)
• Cavity fabrication at Cornell• Re-Entrant Cavities (70 mm)• Re-Entrant Cavities (60 mm)• Several single cell for Process R&D
• Cavity fabrication at KEK (US-Japan)• Cavities of TESLA, Low Loss and ICHIRO design
ILCAmericas
Cavity Fabrication, Processing and Testing Road Map
Cavity FabricationBy Industry
Cavity Dressing &Horizontal Testing
@ Fermilab
BCP and EPProcessing @ Cornell
BCP and EPProcessing
@ Jlab
BCP and EPProcessing @ ANL/FNAL
Vertical Testing @ Cornell
Vertical Testing @ Jlab
Vertical Testing @ FNAL
Exists
Developing
ILCAmericas Cavity Measurements
• RF measurement of the ACCEL Cavities at Fermilab.
Accelerating field amplitude in cavity axes.
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
0 200 400 600 800 1000 1200Z, mm
Am
plit
ud
e
ACCEL6 ACCEL7 ACCEL9
ILCAmericas ILC Cavity Material Grain size R&D at Jlab
• Study of Single Cell large grain niobium from CBMM, Heraeus and Ningxia
• 5 single cell cavities each from these vendors will be fabricated for statistics.
• Two 9-cell cavities are being fabricated for Fermilab using CBMM ingot.
Large Grain TESLA Cavity Shape SC, Chinese Nb
1.00E+09
1.00E+10
1.00E+11
0 5 10 15 20 25 30 35
Eacc [MV/m]
Q0
Test#1/2/3/4
Q - drop
Quench 29 MV/m
Quench @ 33.3 MV/m
Ningxia
Large Grain TESLA Cavity Shape SC, WC_Heraeus Nb
1.00E+09
1.00E+10
1.00E+11
0 5 10 15 20 25 30 35
Eacc [MV/m]
Q0
Test#2/4
Quench at 34.4 MV/m
HeraeusLarge Grain TESLA Cavity Shape SC#2, Ingot"D"
1.00E+09
1.00E+10
1.00E+11
0 5 10 15 20 25 30 35
Eacc [MV/m]
Q0
T=1.99K Series2
Test #1/2Test #1
Quench at 31.2 MV/m
ILCAmericas
50 MV/m in Single Cells !Lower Surface Magnetic Field & Lower Losses
Re-entrant
CornellKEK
Low Loss
Jlab
KEK
Tesla Shape
Need Multi-cells Next
New Shapes Breakthrough
ILCAmericas
Fabricated at Cornell
Proof of Principle Results: Eacc = 47 - 52 MV/m
/Ichiro
ILCAmericas
60 mm aperture similar to LL shape -> 16% lower Hpk/Eacc
New Reentrant Cavity Shape
Work done in Collaboration with KEK
ILCAmericas ILC Cavity Processing• We are using infrastructures at the collaborating laboratories to develop the
processing capabilities and parameters in USA to achieve 25 MV/m with BCP and 35 MV/m with EP.
• These facilities are also being used to train people.
• Cornell:– BCP and HPR – Vertical EP
• Jlab– EP
• Fermilab and ANL (New Facility)– BCP – EP
• We are also sending Fermilab staff to DESY for participation and training in surface processing, vertical and Horizontal testing.
ILCAmericas Check Reproducibility of HPR
Cornell Re-entrant Cavity
3.9.9
3.9.10
Work done in Collaboration with KEK
ILCAmericas
BCP Complete
First ACCEL ILC Cavity at Cornell
HPR Complete
3.9.3.1
ILCAmericas Vertical Test of ACCEL Cavity
Fermilab is sending engineering staff and technician to participate in the BCP and vertical testing at Cornell.
ACCEL8_21apr06
1.000E+09
1.000E+10
1.000E+11
0 5 10 15 20
Eacc (MV/M)
Q
QuenchNo Radiation
60 um BCP (nominal) + 50 um at ACCEL
Low Field: Q >1010, Eacc = 17 MV/m, (Quench)
Q
Eacc (Mv/m)
ILCAmericas Goals for EP Development at JlabEstablish EP processing for ILC 9-cell cavities at Jlab
• Commissioning EP cabinet with Spare DESY 9-cell cavity
• Perform HPR, assembly and testing with S35 cavity to analyze procedure effectiveness and reproducibility
• Investigate standard process procedures to gain a better understanding of current issues (Sulfur precipitation, HF loss during use)– Identify and develop relevant process metrics and QA steps
• Establish and document procedures– Aim is uniform reproducible etching with clean surfaces after rinsing
• Process, test, qualify and prep cavities for FNAL string assembly
ILCAmericas
HPR and Assembly
Alignment Cage
Electropolish Development for ILC
Jlab EP Cabinet
3.9.3.2
ILCAmericas
EP System Alignment Frame and Cathode with ILC Cavity 3.9.3.2
ILCAmericas
ILC Surface Processing Facility Development at ANL/FNAL
• The Joint ANL/FNAL Superconducting Surface Processing Facility (SCSPF), located at Argonne National Laboratory, is a major chemical processing facility capable of electro-polishing and buffered chemical polishing a large quantity and variety of superconducting structures.
• This BCP part of the facility is ready and going through the safety approval. It is expected to be operational end of 06.
• An initial plans has been developed for an EP facility to be build (FY06-07) at ANL/Fermilab Surface Processing Facility at ANL.
• This facility should include the knowledge of EP from the ILC Collaboration.
ILCAmericas Cryomodule Design and Fabrication
• In FY05 Fermilab started on converting the DESY/INFN design of the ILC cryomodule (Type-III+).
• We have formed an ILC Cryomodule working group that is working towards a design of an ILC cryomodule. This design will evolve.
• The Goal is to design an improved ILC cryomodule (Type-IV) and build one at Fermilab by FY08.
High Power testing of the cavities and the fabrication of 1st ILC cryomodule with new design 2008.
ILCAmericas
Cryomodule Fabrication Plans for an RF Unit test at ILCTA
Cryomodule 1 Cryomodule 2Cryomodule 3
DressedCavity Provided
By DESY
Cold MassBy DESY/INFN
CryomoduleAssembled at
Fermilab
March 07
Standard LengthCavity Purchased
By Fermilab
BCP & VTAt Cornell
EP & VTAt Jlab
Cold MassFrom ZanonBy Fermilab
Dressed and HTAt Fermilab
Dec 07 Mid 08
ILC LengthCavity Purchased
By Fermilab (AES/Jlab)
BCP & VTIn USA
EP & VTIn USA
Dressed New Design and HT
At Fermilab
Cold Mass Type-IVFrom US Company
By Fermilab
ILCAmericas
1st US Assembled Cryomodule: Fermilab, DESY and INFN
• DESY will send Fermilab eight 9-Cell 1.3 GHz dressed and horizontally tested cavities. – The present schedule for the delivery of these 8 cavities is around end
of 2006. DESY will attempt to advance this schedule.
• DESY and INFN have ordered two cold masses for Type-III cryomodules from Zanon. – DESY will send one of these cold masses to Fermilab for the 1st
cryomodule assembly at Fermilab. – It is expected that this cold mass will be available about Sept.-Oct.
2006.
• Some parts for the 1.3 GHz cryomodule are not provided by Zanon but rather by INFN. – It was agreed that INFN will send these associated parts to Fermilab
and provide parts needed for a 3rd cold mass. – INFN-DESY will also send the assembly documentation to Fermilab.
• Fermilab will work to achieve the earliest possible delivery date for the DESY four cavity 3.9 GHz cryomodule. This is currently expected to be early in 2007.
ILCAmericas ILC Cryomodule Design Considerations
• Move quad package to middle of cryomodule to achieve better support and alignment.
• Shorten cavity-to-cavity interconnect and simplify for ease of fabrication and cost reduction. Possible superconducting joint.
• Overall improved packing factor.
• Minimize direct heat load to cavity through MC.
• Simplify the assembly procedure.
• MLI redesign to reduce hands-on labor costs.
• More robust design to survive shipping.
• Reliability of tuner motors in cold operation.
• Etc. (we’ve heard many suggestions)
ILCAmericas ILC Cryomodule: Conceptual Model
ILCAmericas
Increasediameter beyond X-FEL
Increasediameter beyond X-FEL
Review 2-phase pipe size and effect of slope
Change in Cryogenic Distribution
ILCAmericas
ILC Cavity Spacing, Dimensions with Blade Tuner
Blade Tuner
35068mm1036.2 mm
Active length = 1036.2 mm x 24 cavities = 24868.6 mm
Packing Factor = 24868.6 / 35068 = 0.71
ILCAmericas 1st Cryomodule Assembly Plans
• Cavity String Assembly Procedures & Fixtures Learning at DESY (February 20 –March 3)
– A draft traveler was written during this visit. It is currently being reviewed by Axel Matheisen for comments.
– Tooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab.
– Assembly sketches, movies and took a lot of pictures and notes.
• Cryomodule #6 Assembly Procedures Learning at DESY (May-June 06)
• CAF Infrastructure ready & operational: May-June 06– MP9 Clean Room installation finished– Cold Mass and Vacuum Vessel Assembly Fixtures received at Fermilab.– Cavity String Assembly Fixtures are being fabricated to be installed
• Assemble 1st Cryomodule (4 months): Start date depends when we receive the kit from DESY
ILCAmericas
Cavity and Cryomodule Assembly Fixtures
ILCAmericas FY07 Plans: Cavities & Cryomodule
• The FY07 plan of the ART will be the continuation of the plan we are undertaking in FY07.
• Cavity Fabrication– ILC Design– New Shape (LL and RE)– Fine, Large and Single Crystal– R&D on material, fabrication etc– 3.9 GHz deflecting cavity design and fabrication
• Cavity Processing and Vertical Testing– BCP, EP and Vertical Testing at Cornell– BCP, EP and Vertical Testing at Jlab– BCP, EP and Vertical Testing at FNAL/ANL (New Facility)– R&D on surface treatment
• Cryomodule Design and Fabrication– Type III+ Fabrication– Type IV Design
• US Industrial involvement in Cavity and Cryomodule Design and Fabrication
• Enhanced University participation in ILC R&D
ILCAmericas Summary
• US-ILC Main Linac: Cavity and Cryomodule R&D program is established to address the key technology issues.– Cavity Gradient– ILC Cryomodule design and fabrication
• R&D is focused on the Baseline design of the cavity and cryomodule.
• We are also working on alternate design for Cavity and material.
• We are upgrading existing infrastructure at US laboratories to cost effectively advance the R&D program on a ambitious schedule.
• We are developing infrastructure at Fermilab for cavity processing and testing and fabrication of cryomodule.
• We are leading the ILC effort in the ILC Cryomodule design.
• We are working with US industry in fabrication.
• We are also working with US industry in ILC Cost Study.
ILCAmericas
Could lab really spend the Money Faster on ILC than its currently funded?
• Yes, Yes and Yes• Fermilab has qualified scientists and engineers who wants to
work on ILC.• We continue to defer investment that would be needed for more
focused R&D.– Cavity R&D: (This is the highest R&D priority for ILC-GDE)
• Niobium • More cavities fabrication at industry. We should fabricate enough to saturate
the pipeline at existing and upcoming processing facilities. • Electron Beam Welding• Surface Processing: We need a pre-production BCP, EP and HPR system at
Fermilab• Vendor development
– Cavity Tuning Device ( A copy of DESY Design)– Vertical testing temperature study– Cryomodule Testing– 10 MWatt Klystron– Cryogenic plant– Industrial fabrication
• US industries could fabricate an RF unit using laboratory infrastructure.
ILCAmericas FTE in ILC R&D at Fermilab: FY06 and FY07