heat load elec.xls

Post on 01-Dec-2015

59 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

heat load

TRANSCRIPT

HEAT LOAD CALCULATIONS FOR AC SYSTEM FOR 4x115MW VARAHI PROJECT

Outside Summer Cond. Desired Condition Factors Factors Factors Sun Gain Factors Partion temp (wall/roof)

### TEMP. (F) #REF! Bi pass factor #REF! People (sens) #REF! Walls (u) ### North Wall ### Vent. Room temp ###

### HUMIDITY (%) #REF! Safety Factor #REF! People (lat.) #REF! Roof (u) ### East Wall ### Diff. Temp ###

### #REF! Fan Heat Gain #REF! light #REF! Daily range ### South Wall ### Floor Factor ###

### #REF! Duct Leakage #REF! Equip. #REF! Temp. Correc. ### West Wall ### Part. Wall Factor ###

### #REF! Return Air Heat #REF! ADP #REF! Roof ###

DRY BULB TEMPERATURE 0F / 0CWETBULB TEMPERATURE 0CRELATIVE HUMIDITY (%):

CFM PER SQ. FT FLR. AREAHUMIDITY RATIO gms/kg

OF DRY AIRFRESH AIR PER PERSON (CFM)DAILY TEMPERATURE

RANGEHUMIDITY RATIO gms/kg OF DRY AIR

HEAT LOAD CALCULATIONS FOR AC SYSTEM FOR 4x115MW VARAHI PROJECT

ANNEXURE - 01

Department Name Drawing No.

Heat Load

Remarks

1 2 3 4 5 6 7

1 Dispatcher Control Room - D1

AT EL. +561.6 & +562.1M

1 Tranformer-1 Room 28.00

2 Transformer-2 Room 28.00

3 Transformer-3 Room 28.00

4 Transformer-4 Room 28.00

5 Transformer-5 Room 28.00

6 Transformer-6 Room 28.00

7 Battery Room 220V DC 1.00

8 ANTE Room - 1 0

9 ANTE Room - 2 0

10 Ventilation Room 0.50

11 cable cellar 102.00

AT EL. +565.6M

1 Battery Room 1.00

2 IMCC-05-CH-01 (68) 20.50

3 IMCC-05-CH-02 (11) 3.30

4 ANTE ROOM

5 Battery charger Room 1.00

6 IMCC-04-CH-01 (31) 9.30

7 HT MCC -02 (40) 20.00

8 CMCC-04-CH-01 (7) 2.10

9 CMCC-05-CH-01 (17) 5.10

10 PDB-04-CH-01 (10) 2.00

11 PCC-04-CH 10.80

12 PCC-05-CH 9.00

13 PCC-06-CH 9.00

14 ANTE ROOM

15 GENTS & LADIES TOILET 0.10

16 ELDB-1 0.20

17 ELDB-2 0.20

18 MLDB TRAFO-2 2.00

19 MLDB TRAFO-3 2.00

20 MLDB-06-CH-01 2.00

21 MLDB TRAFO-4 2.00

22 CMCP (9) 2.70

23 IMCP (13) 3.90

24 PDB-08-RM-01 0.40

AT EL. +565.6M

1 ENGG STATION 1.00

2 GAS CYLINDER ROOM 0.20

3 CONTROL ROOM 1.50

AIR CONDITIONING SYSTEM - 1 (23+ 2 DEG C & RH 55+ 5%)

Sl.No.

Type of AC Unit envisaged (Bidder to suggest the system)Equipment

(KW)People (Nos.)

IS-0-EE-669-114-E006, Rev.1

4 ELECTRIAL SHIFT OFFICE ROOM 0.50

5 GENTS & LADIES TOILET 0.10

IS-0-EE-669-114-E006, Rev.1

2 Dispatcher Control Room - D2

AT EL. +561.6 & +562.1M

1 Tranformer-1 Room 28.00

2 Transformer-2 Room 28.00

3 Transformer-3 Room 28.00

4 Transformer-4 Room 28.00

5 Transformer-4 Room 28.00

6 Ventilation Room 0.50

7 GENTS & LADIES TOILET 0.10

8 ANTE ROOM

9 ANTE ROOM

10 Cable cellar 27.00

AT EL. +565M

1 IMCC-03-CH-01 (26) 7.80

2TR. Window A/C Units

2 IMCC-03-CH-02 (45) 13.50

3 IMCC-02-CH-01 (51) 15.30

4 IMCC-02-CH-02 (30) 9.00

5 CMCC-02-CH-01 (13) 3.90

6 PDB-02-CH-01 (1) 0.20

7 PDB-03-CH-01 (4) 0.80

8 ELDB-1 0.20

9 PCC-02-CH 9.00

10 PCC-03-CH 10.50

11 TRAFO-1 MLDB 2.00

12 MLDB-03-CH-01 0.20

13 TRAFO-2 MLDB 2.00

14 Ventilation Room 0.50

15 ANTE ROOM

16 BATTERY ROOM 1.00

17 IMCP 0.30

AT EL. +571.1M

1 GAS CYLINDER ROOM 0.20

2 Electrical Shift Office Room 0.50

3 LADIES TOILET 0.10

4 GENTS TOILET 0.10

5 CONTROL ROOM 1.50

IS-0-EE-669-114-E007, Rev.1

3 Dispatcher Control Room - D3

2TR. Window A/C Units

AT EL. +561.6 & +562.1M

1 TRAFO-1 28.00

2 TRAFO-2 28.00

3 TRAFO-3 28.00

4 TRAFO-4 28.00

5 Ventilation Room 0.50

6 Store Room 0.20

7 GENTS & LADIES TOILET 0.10

8 ANTE ROOM

9 ANTE ROOM

10 Cable cellar 80.00

AT EL. +565.6M

1 HT-MCC-02 (31) 15.50

2 MLDB TRAFO-1 2.00

3 MLDB-07-RM-01 0.20

4 MLDB TRAFO-2 0.20

5 ELDB - 1 0.20

6 MLDB TRAFO-5 2.00

7 MLDB-08-RM-02 0.20

8 MLDB TRAFO-6 2.00

9 ELDB-2 0.20

10 MLDB TRAFO-5 2.00

11 MLDB-08-RM-02 0.20

12 MLDB TRAFO-6 2.00

13 ELDB-2 0.20

14 MLDB TRAFO-5 2.00

15 MLDB-08-RM-02 0.20

16 MLDB TRAFO-6 2.00

17 DCDB 1

18 Battery charger 1

19 PDB-08-RM-01 (4) 0.8

20 PCC-07-RM 9.7

21 220V DC Battery room 1

22 PCC-08-RM 11.2

23 CMCC-08-RM-01 (12) 3.6

24 Ventilation Room 1

25 Electrical Shift Office Room 0.5

26 GENTS & LADIES TOILET 0.1

27 PDB-07-RM-01 0.2AT EL. +571.1M

1 UPS Battery Room 1

2 Ladies & Gents toilet 0.1

3 Pantry 0.2

4 Corridor 0.2

IS-0-EE-669-114-E008, Rev.1

AT EL. +575.1M

1 IMCC-07-RM-03 (20) 0.6

2 IMCC-08-RM-01 (21) 6.3

3 IMCC-07-RM-01 (28) 8.4

4 IMCC-07-RM-02 (32) 9.6

5 CCVM 0.5

6 IMCP-07, RM-01 0.3

7 IMCP-08, RM-01 0.3

8 IMCP-08, RM-02 0.3

9 IMCP-08, RM-03 0.3

10 IMCP-08, RM-04 0.3

11 UPS 0.5

12 RIO 0.5

13 PACKAGE AC ROOM 1

14 GAS CYLINDER ROOM 0.1

15 GENTS TOILET 0.1

16 CORRIDOR 0.2

171.5

18 ENGG STATION 1

191.5

IS-0-EE-669-114-E008, Rev.1

CONFERENCE ROOM WITH FALSE CEILING

DESPATCHER CONTROL ROOM WITH FALSE CEILING & AC (25 Deg)

ANNEXURE - 01

Department Name Drawing No.

Heat Load

Remarks

1 2 3 4 5 6 7

4 Dispatcher Control Room - D4

AT EL. +561.6 & +562.1M

1 TRAFO-1 28.00

2 TRAFO-2 28.00

3 TRAFO-3 28.00

4 TRAFO-4 28.00

5 Ventilation Room 0.50

6 ANTE ROOM

7 ANTE ROOM

8 Cable cellar 29.00

AT EL. +565.6M

1 IMCP-03, RM-01 0.30

2 IMCP-03, RM-02 0.30

3 IMCP-03, RM-03 0.30

4 IMCP-03, RM-04 0.30

5 IMCP-03, RM-05 0.30

6 IMCP-03, RM-06 0.30

7 IMCP-03, RM-07 0.30

8 IMCP-03, RM-08 0.30

9 IMCP-03, RM-09 0.30

10 IMCP-03, RM-10 0.30

11 RIO 0.50

12 UPS 0.50

13 BATTERY ROOM 1.00

14 PDB-03-RM-01 (14) 2.80

15 CMCC-4-RM-01 (13) 3.90

16 ELDB 0.20

17 MLDB TRAFO 2.00

18 MLDB-03-RM-01 0.20

19 MLDB TRAFO 2.00

20 PCC-03-RM 10.50

21 PCC-04-RM 9.00

22 IMCC-04-RM-01 (18) 5.40

23 IMCP-04, RM-01 0.30

24 IMCP-04, RM-02 0.30

25 IMCP-04, RM-03 0.30

26 IMCP-04, RM-04 0.30

27 IMCP-04, RM-05 0.30

28 IMCP-04, RM-06 0.30

AT EL. +571.1M

1 PKG AC ROOM 1.00

2 ENGG STATION 1.00

AIR CONDITIONING SYSTEM - 1 (23+ 2 DEG C & RH 55+ 5%)

Sl.No.

Type of AC Unit envisaged (Bidder to suggest the system)Equipment

(KW)People (Nos.)

IS-0-EE-669-114-E011, Rev.1

3 1.50

4 GAS CYLINDER ROOM 0.10

5 Electrical Shift Office Room 0.50

6 GENTS & LADIES TOILET 0.10

IS-0-EE-669-114-E011, Rev.1

DESPATCHER CONTROL ROOM WITH FALSE CEILING & AC (25 Deg)

5 Dispatcher Control Room - D5

AT EL. +561.6 & +562.1M

1 Tranformer-1 Room 28.00

2 Transformer-2 Room 28.00

3 Transformer-3 Room 28.00

4 Transformer-4 Room 28.00

5 Transformer-4 Room 28.00

6 Ventilation Room 0.50

7 GENTS & LADIES TOILET 0.10

8 ANTE ROOM

9 ANTE ROOM

10 Cable cellar 25.00

AT EL. +565M

1 IMCC-09-RM-01 (47) 14.10

2TR. Window A/C Units

2 IMCC-10-RM-01 (31) 9.30

3 IMCC-10-RM-02 (30) 9.00

4 IMCC-10-RM-03 (42) 12.60

5 CMCC-09-RM-01 (15) 4.50

6 PDB-10-RM-01 (7) 1.40

7 PDB-03-CH-01 0.00

8 ELDB-1 0.20

9 PCC-02-CH 9.00

10 PCC-03-CH 10.20

11 TRAFO-1 MLDB 2.00

12 MLDB-03-CH-01 0.20

13 TRAFO-2 MLDB 2.00

14 Ventilation Room 0.50

15 ANTE ROOM

16 BATTERY ROOM 1.00

AT EL. +571.1M

1 GAS CYLINDER ROOM 0.20

2 Electrical Shift Office Room 0.50

3 LADIES TOILET 0.10

4 GENTS TOILET 0.10

5 CONTROL ROOM 1.50

IS-0-EE-669-114-E010, Rev.1

6 Dispatcher Control Room - D6

2TR. Window A/C Units

AT EL. +561.6 & +562.1M

1 TRAFO-1 28.00

2 TRAFO-2 28.00

3 TRAFO-3 28.00

4 TRAFO-4 28.00

5 TRAFO-5 28.00

6 TRAFO-6 28.00

7 Ventilation Room 0.50

10 ANTE ROOM

11 ANTE ROOM

12 Cable cellar 45.00

AT EL. +565.6M

1 IMCC-02-RM-01 (41) 12.30 35DEG

2 IMCP-02-RM-01 0.30

3 RIO 0.50

4 UPS 0.50

5 BATTERY ROOM 1.00

6 PKG AC ROOM 1.00

7 Electrical Shift Office Room 0.50

8 GENTS & LADIES TOILET 0.10

9 CMCC-02-RM-01 (25) 7.50

10 CMCC-05-RM-01 (21) 6.30

11 PDB-02-RM-01 (5) 1.00

12 MLDB, TRAFO-1 2.00

13 MLDB-06-RM-01 0.20

14 MLDB, TRAFO-2 2.00

15 ELDB-1 0.2

16 PCC-02-RM 9

17 PCC-05-RM 8.2

18 PCC-06-RM 8.9

19 TRAFO-1, MLDB 2

20 MLDB-06-RM-01 0.2

21 TRAFO-2, MLDB 2

22 ELDB-2 0.2

23 Ventilation Room 0.5

24 IMCC-05-RM-WT01 0

25 IMCC-05-RM-WT02 0

26 IMCC-06-RM-WT03 0

27 IMCC-06-RM-WT04 0

28 PDB-06-RM-01 (24) 4.8AT EL. +571.1M

1 GAS CYLINDER ROOM 0.2

2 GENTS & LADIES TOILET 0.1

31.5

4 ENGG STATION 0.5

5 PACKAGE A/C ROOM 1

IS-0-EE-669-114-E002, Rev.1

DESPATCHER CONTROL ROOM WITH FALSE CEILING & AC (25 Deg)

ANNEXURE - 01

Department Name Drawing No.

Heat Load

Remarks

1 2 3 4 5 6 7

1 MCC ROOM- 1,2,3,4

AT EL. +561.6 (GROUND FLR)

1 RIO 0.50

2 RIO 0.50

3 PLC 1.00

4 PLC 1.00

5 UPS 0.50

6 UPS BATTERY ROOM 1.00

7 PACKAGE A/C ROOM 1.00

8 IMCC 0.00

9 HYD. POWER PACK 1.00

10

FIRST FLOOR

1 CONTROL CABIN 0.50

1 ECR ROOM E-1

AT EL. +561.6 & +562.1M

1 TRAFO-1 28.00

2 TRAFO-2 28.00

3 TRAFO-3 28.00

4 TRAFO-4 28.00

5 TRAFO-5 28.00

6 TRAFO-6 28.00

7 Ventilation Room 0.50

8 ANTE ROOM

9 ANTE ROOM

10 GENTS & LADIES TOILET 0.10

11 BATTERY ROOM

12 Cable cellar 42.00

2TR. Window A/C Units

AIR CONDITIONING SYSTEM - 1 (35 DEG C max & RH 70 % max)

Sl.No.

Type of AC Unit envisaged (Bidder to suggest the system)Equipment

(KW)People (Nos.)

IS-3-EL-669-114-E020, Rev.0

IS-0-EE-669-114-E002, Rev.1

AT EL. +565.6

2TR. Window A/C Units

1 PCC-07-CH 8.90

2 PCC-11-RM 9.30

3 PCC-12-RM 10.00

4 CMCC-11-RM-01(24) 7.20

5 ELDB-1 0.20

6 TRAFO-1, MLDB 2.00

7 MLDB-11-RM-01 0.20

8 TRAFO-2, MLDB 2.00

9 TRAFO-3, MLDB 2.00

10 MLDB-07-CH-01 0.20

11 TRAFO-4, MLDB 2.00

12 CMCP-12, RM-01 0.30

13 CMCP-12, RM-02 0.30

14 CMCP-12, RM-03 0.30

16 CMCP-12, RM-04 0.30

17 CMCP-12, RM-05 0.30

18 CMCP-12, RM-06 0.30

19 CMCP-12, RM-07 0.30

20 CMCP-12, RM-08 0.30

21 CMCP-12, RM-09 0.30

22 IMCP-11, RM-01 0.00

23 IMCP-11, RM-02 0.00

24 IMCP-11, RM-03 0.00

25 IMCP-11, RM-04 0.00

26 IMCP-11, RM-05 0.00

27 IMCP-11, RM-06 0.00

28 IMCP-12, RM-01 0.30

29 IMCP-12, RM-02 0.30

30 IMCP-7, RM-01 0.30

31 IMCP-7, RM-02 0.30

32 IMCP-7, RM-03 0.30

33 IMCP-7, RM-04 0.30

34 IMCC-12-RM-01 (10) 3.00

35 IMCC-07-CH-01 (13) 3.90

36 IMCC-07-CH-02 (8) 2.40

37 IMCC-10-RM-01 0.30

38 ELECTRICAL SHIFT OFFICE ROOM 0.50

39 IMCC-10-RM-(4) 1.20

AT EL. +565.6

1 PACKAGE A/C ROOM 1.00

1 ECR ROOM E-2

AT EL. +561.6 & +562.1M

1 TRAFO-1 28.00

2 TRAFO-2 28.00

3 BATTERY ROOM 1.00

4 Ventilation Room 0.50

5 ANTE ROOM

6 cable cellar 15.00

AT EL. +565.6

1 IMCP-02, LD-01 0.30

2 IMCP-02, LD-02 1

3 RIO 0.50

IS-0-EE-669-114-E002, Rev.1

IS-0-EE-669-114-E003, Rev.1

4 UPS 0.50

5 IMCC-02-LD-01 (45) 13.50

6 PACKAGE A/C ROOM 1.00

7 TRAFO-1, MLDB 2

8 MLDB-02-LD-01 0.2

9 TRAFO-2, MLDB 2

10 CMCC-02-LD-01(17) 5.1

11 DCDB 0.5

12 BAT. CHARGER 1

13 PDB-02-LD-01 0.2

14 PCC-02-LD 9.2

15 HT STAND ALONE PNL 0.5

16 ELECTRICAL SHIFT OFFICE ROOM 0.5

17 VENTILATION ROOM 0.5

IS-0-EE-669-114-E003, Rev.1

ANNEXURE - 01

Department Name Drawing No.

Heat Load

Remarks

1 2 3 4 5 6 7

1

AT EL. -7.8 M

2

AT EL.

3

AT EL.

4

AT EL.

5

AT EL.

AIR CONDITIONING SYSTEM - 1 (35 DEG C max & RH 70 % max)

Sl.No.

Type of AC Unit envisaged (Bidder to suggest the system)Equipment

(KW)People (Nos.)

Mechanical GA with Load Data of Convyr J47C1 (Tunnel)

NMDC/BHEL/01/55/DE/--/116

Mechanical GA with Load Data of Convyr J59C1 (Tunnel)

NMDC/BHEL/01/55/DE/--/147

Mechanical GA with Load Data of Convyr J60C1 (Tunnel)

NMDC/BHEL/01/55/DE/--/152

GA of Conveyor Tunnel for J1C1/C2 (Tunnel)

NMDC/BHEL/01/35/DE/--/3962

GA of Conveyor Tunnel for J2C1/C2 (Tunnel)

NMDC/BHEL/01/35/DE/--/3965

BUILDINGS

1 WORKERS REST ROOM WITH TOILET

2 AREA SUB STORES

3 AREA REPAIR SHOP

4 ELECTRICAL REPAIR SHOP

5 PUMP HOUSES

6 LABORATORY

NMDC/BHEL/01/35/DE/--/4140

MEC/11/20/Q6QZ/CTS/RMHS/001

top related