Harnessing energy from the Severn Estuary

Hannah Burke & Steven Payne

The Severn Estuary

The Severn EstuaryThe Severn estuary has a lot of potential for harnessing a large quantity of energy, it is one of the largest estuaries in Europe, it has:The second largest tidal range in the world of

up to 14m.A peak tidal current exceeding 2m/s.

Background InformationIn 2008 the UK Government, Welsh Assembly Government and South West Regional Development Agency started a two year feasibility study into tidal power in the Severn Estuary.

The aim was to investigate whether it would be economically and environmentally viable to harness tidal energy in the Estuary.

Environmental ProtectionThe Severn Estuary :Assigned the status of a Special Area of

Conservation in December 2009.Designated a Special Protection Area in July 1995

after it was identified as an area of national and international importance for breeding, feeding, wintering and migration of rare and vulnerable birds.

Appointed a Ramsar Site in July 1995.Gained status as a Site of Special Scientific Interest.National Nature Reserve which is an area of high

nature conservation value.

Species in the River Severn

Salmon Eels Pike

Fish Species

Bird Species

Dunlin Curlew Short-eared Owl

Proposed PlansSeveral schemes have been proposed that harness the Severn Estuary’s power in different ways. Some of the proposed plans include:The Severn barrage (there have been

alternative versions of the barrage proposed)Tidal lagoons (in Swansea and other available

sites)In-stream tidal turbines

The Severn Barrage - Proposal 1 Plans for the Severn Barrage were originally proposed in 2006 by

the Severn Tidal Power Group. The proposal aimed to build a barrage 10 miles long from Brean

Down, in Somerset to Lavernock Point in Cardiff. The estimated cost of this proposal is £15billion. This proposal was rejected by the government due to

environmental issues and not being economically viable .

The Severn Barrage - Proposal 2After the rejection of the first proposal for a

Severn tidal barrage, Hafren Power, a private company expressed their interest in the scheme.

Hafren Power proposed plans to build an 11 mile barrage between Lavernock Point near Penarth, Vale of Glamorgan and Brean near Weston-Super-Mare.

The cost of this proposal is £25 billion and is estimated to be capable of producing 5% of the UK's electricity needs.

Barrage would have a lifespan of at least 120 years.

Energy generated would be equal to that of 3 or4 nuclear power stations.

Environmental Impacts of the Severn Barrage proposal

The use of fossil fuels to extract the materials to manufacture the barrage will release gases such as carbon dioxide and oxides of nitrogen which contribute to global climate change and acid rain.

The barrage would decrease the tidal range which is currently 14 metres. This would lead to increased sedimentation in areas of reduced flow.

Pollutants carried by the river may build up behind the barrage.

The barrage could help prevent flooding during high tides.

Longer periods of static water could decrease turbidity and increase light penetration causing increased photosynthesis of macrophytes. This produces richer food webs.

The barrage may be an obstacle to shipping and wildlife eg. migratory salmon- this problem can be overcome with the installation of a fish ladder.

Environmental Impacts of the Severn Barrage proposal

In-Stream Tidal TurbinesThese are underwater turbines that generate electricity when the tide flows in and out. They do not require the construction of a barrage which reduces energy input, however they produce less energy. BUT Less materials are needed to manufacture the turbines therefore

less emissions released from mining activities which leads to decreased enhanced greenhouse effect.

Furthermore environmental impacts such as water levels, flow rates and sedimentation remain virtually unaffected.

Tidal Lagoon The Swansea tidal lagoon is estimated to cost £850 million and it will be the first of

five tidal lagoons to be built. It works by generating energy when the tide passes through the turbines.

Environmental Impacts: The construction of long rocky islands provide habitats for migratory birds Collected sediments would be settle and therefore reduce turbidity and increase the

amount of light levels reaching macrophytes. Less environmentally damaging on the coastline as they do not span the estuary. Large numbers of tidal lagoons built together may change the height of the tide which

could lead to protected areas flooding and therefore less habitat for migratory birds.

Referenceshttp://www.newport.gov.uk/_dc/index.cfm?fuseaction=

outdoors.biodiversity&contentid=DevXP002013http://www.severnestuary.net/asera/index.htmlhttp://wales.wwf.org.uk/what_we_do/tackling_climate_

change/the_severn_barrage_debate/?_ga=1.163648889.719863649.1422613727

Richard Genn, AQA Environmental Studies, Published in 2009

https://www.gov.uk/government/collections/severn-tidal-power-feasibility-study-conclusions

http://news.bbc.co.uk/1/hi/wales/south_east/4927744.stm

http://www.bbc.co.uk/insideout/content/articles/2008/03/18/west_severn_barrage_s13_w4_feature.shtml

http://www.bbc.co.uk/news/uk-england-somerset-11609676

top related