gridpp: executive summary
Post on 31-Dec-2015
26 Views
Preview:
DESCRIPTION
TRANSCRIPT
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
Outline• Exec2 Summary• Grid status• High level view • 2006 Outturn• Performance Monitoring• Outlook for 2007• Beyond GridPP2
2007
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
Exec2 Summary• 2006 was the second full year for the UK Production Grid • More than 5,000 CPUs and more than 1/2 Petabyte of disk
storage• The UK is the largest CPU provider on the EGEE Grid, with
total CPU used of 15 GSI2k-hours in 2006• The GridPP2 project has met 69% of its original targets
with 92% of the metrics within specification• The initial LCG Grid Service is now starting and will run for
the first 6 months of 2007• The aim is to continue to improve reliability and
performance ready for startup of the full Grid service on 1st July 2007
• The GridPP2 project has been extended by 7 months to April 2008
• The outcome of the GridPP3 proposal to PPARC is awaited• We anticipate a challenging period from Sept. 2007
onwards
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
Grid OverviewAim: by 2008 (full year’s data
taking)- CPU ~100MSI2k (100,000
CPUs)- Storage ~80PB - Involving >100 institutes
worldwide
- Build on complex middleware being developed in advanced Grid technology projects, both in Europe (Glite) and in the USA (VDT)
1. Prototype went live in September 2003 in 12 countries
2. Extensively tested by the LHC experiments in September 2004
3. February 2006 25,547 CPUs, 4398 TB storage
Status in February 2007: 177 sites, 32,412 CPUs, 13,282 TB storageMonitoring via Grid Operations
Centre
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
htt
p:/
/ww
w3
.egee.c
esg
a.e
s/gri
dsi
te/a
ccounti
ng/C
ESG
A/t
ree_e
gee.p
hp
Resources2006 CPU Usage
by Region
Via APEL accounting
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
2006 OutturnDefinitions:• "Promised" is the total that was planned at the Tier-
1/A (in the March 2005 planning) and Tier-2s (in the October 2004 Tier-2 MoU) for CPU and storage
• "Delivered" is the total that was physically installed for use by GridPP, including LCG and SAMGrid at Tier-2 and LCG and BaBar at Tier-1/A
• "Available" is available for LCG Grid use, i.e. declared via the EGEE mechanisms with storage via an SRM interface
• "Used" is as accounted for by the Grid Operations Centre
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
Resources Delivered
CPU KSI2K Storage TB
Promised Delivered Ratio Promised Delivered Ratio
Brunel 155 480 310% 21 6.3 30%
Imperial 1165 807 69% 93.3 60.3 65%
QMUL 917 1209 132% 58.5 18 31%
RHUL 204 163 80% 23.2 8.8 38%
UCL 60 121 202% 0.7 1.1 149%
Lancaster 510 484 95% 86.7 72 83%
Liverpool 605 592 98% 80.3 2.8 3%
Manchester 1305 1840 141% 372.6 145 39%
Sheffield 183 183 100% 3 2 67%
Durham 86 99 115% 5 4 79%
Edinburgh 7 11 152% 70.5 20 28%
Glasgow 246 800 325% 14.8 40 270%
Birmingham 196 223 114% 9.3 9.3 100%
Bristol 39 12 31% 1.9 3.8 200%
Cambridge 33 40 123% 4.4 4.4 101%
Oxford 414 150 36% 24.5 27 110%
RAL PPD 199 320 161% 17.4 66.1 381%
London 2501 2780 111% 196.7 94.4 48%
NorthGrid 2602 3099 119% 542.6 221.8 41%
ScotGrid 340 910 268% 90.3 64 71%
SouthGrid 880 745 85% 57.5 110.6 192%
Total 6322 7534 119% 887.1 490.8 55%
Tier-1 1604 1034 64% 1495 712 48%
Tier-1 and Tier-2 total delivery is impressive and usage is improved
Available
CPU: 8.5 MSI2k
Storage: 1.7 PB
Disk: 0.54 PB
Delivery of Tier-1 disk
Used
CPU: 15 GSI2k-hours
Disk: 0.26 PB
Usage of Tier-2 CPU, disk
Request: PPARC acceptance of the 2006 outturn
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
Available (KSI2K) Used (KSI2K Hours) Ratio
1Q06 2Q06 3Q06 4Q06 1Q06 2Q06 3Q06 4Q06 1Q06 2Q06 3Q06 4Q06
Brunel 116 116 116 480 12,811 105,014 159,082 643,806 0.70% 41.30% 62.60% 61.20%
Imperial 203 203 203 642 16,828 83,627 82,593 557,943 2.20% 18.80% 18.60% 39.70%
QMUL 281 1209 1209 1209 214,335 612,564 459,427 1,259,446 13.70% 23.10% 17.40% 47.60%
RHUL 163 163 163 163 25,085 21,940 176,046 147,360 17.20% 6.10% 49.30% 41.30%
UCL 121 121 121 121 42,217 51,106 73,763 156,576 16.00% 19.30% 27.80% 59.10%
Lancaster 485 476 473 473 248,463 402,774 210,432 297,550 14.90% 38.60% 20.30% 28.70%
Liverpool 572 592 592 592 56,218 455,727 40,551 164,222 11.80% 35.20% 3.10% 12.70%
Manchester 480 720 1152 1840 380,857 1,042,154 248,704 370,567 0.30% 66.10% 9.90% 9.20%
Sheffield 240 183 183 183 38,411 59,860 78,795 127,039 2.00% 15.00% 19.70% 31.80%
Durham 72 80 80 80 36,699 58,185 33,671 59,123 4.30% 33.20% 19.20% 33.70%
Edinburgh 6 6 6 6 14,829 4,637 3,641 4,918 34.40% 35.30% 27.70% 37.40%
Glasgow 104 104 47 800 75,774 50,462 72,105 155,986 6.30% 22.20% 70.10% 8.90%
Birmingham 62 23 23 23 38,473 31,795 28,299 53,930 13.20% 62.00% 55.20% 105.20%
Bristol 1 7 7 7 842 7,208 8,982 6,593 15.10% 45.70% 57.00% 41.80%
Cambridge 40 38 38 38 654 2,228 2,442 1,811 0.00% 2.70% 2.90% 2.20%
Oxford 67 65 65 65 94,093 92,841 82,284 63,959 34.30% 65.40% 58.00% 45.10%
RAL PPD 73 73 320 320 106,919 132,046 143,648 235,172 59.90% 82.10% 20.50% 33.60%
London 884 1812 1812 2615 311,276 874,251 950,911 2,765,131 10.30% 22.00% 24.00% 48.30%
NorthGrid 1777 1971 2399 3087 723,949 1,960,515 578,482 959,378 10.10% 45.40% 11.00% 14.20%
ScotGrid 182 190 133 886 127,302 113,284 109,417 220,027 6.40% 27.20% 37.60% 11.30%
SouthGrid 243 207 453 453 240,981 266,118 265,655 361,465 31.00% 58.80% 26.80% 36.40%
Total Tier-2 3086 4179 4797 7041 1,403,508 3,214,168 1,904,465 4,306,001 12.20% 35.10% 18.10% 27.90%
Tier-1 415 620 651 848 624,636 1,089,917 1,393,022 992,106 68.70% 80.20% 97.60% 53.40%
LCG CPU Usage
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
(measured by UK Tier-1 for all VOs)
~90% CPU efficiency due to i/o bottlenecks is OK Concern that this is currently ~75%
Efficiency
Each experiment needs to work to improve their
system/deployment practice anticipating e.g. hanging
gridftp connections during batch work
target
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
(Tier-1 CPUs brought online on Jan 10)
• Tier-1 CPU fully utilised throughout 2006 (Grid & non-Grid)• Added 64 Intel twin dual-core Woodcrests on Jan 10• Busy with Grid jobs within 30 minutes
Utilisation
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
120.00%
06/0
2/20
04
06/3
0/04
07/2
8/04
08/2
5/04
09/2
2/04
10/2
0/04
11/1
7/04
12/1
5/04
01/1
2/20
05
02/0
9/20
05
03/0
9/20
05
04/0
6/20
05
05/0
4/20
05
06/0
1/20
05
06/2
9/05
07/2
7/05
08/2
4/05
09/2
1/05
10/1
9/05
11/1
6/05
14/1
2/20
05
11/0
1/20
06
08/0
2/20
06
08/0
3/20
06
05/0
4/20
06
03/0
5/20
06
01/0
6/20
06
29/0
6/20
06
27/0
7/20
06
24/0
8/20
06
21/0
9/20
06
22/1
0/20
06
Date
% j
ob
slo
ts u
sed
% EGEE slots used % UK slots used
(Estimated utilisation based on gstat job slots/usage)
UKI mirrors overall EGEE utilisation Average Utilisation for Q306: 66%Compared to target of ~70%CPU utilisation was a major T2 issue, but now improving..
Utilisation
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
CPU by experiment
Used at Tier-2 (KSI2K Hours) Used at Tier-1 (KSI2K Hours)
1Q06 2Q06 3Q06 4Q06 1Q06 2Q06 3Q06 4Q06
ALICE 0 432 187 9031 17122 30139 36757
ATLAS 852014 1131060 569879 800194 156114 323195 256979 253869
CMS 125794 236409 489122 368427 77025 176198 407072 170784
LHCb 164339 1237858 718268 1072838 21210 404707 634341 396417
BaBar 41854 72932 9159 31454 254775 61636 15853 501
CDF 1 5 17
D0 93373 102602 40541 221069 95963 53091 22433 27515
H1 3851 44018 23013 8460 3058 17083 18459 80
ZEUS 4965 23170 4140 60736 6906 20953 1353 19815
Other 115407 232299 4867 11341 548 15932 6384 478
LHC 1142147 2605327 1777701 2241646 263380 921222 1328531 857827
Total 1401597 3080349 1859426 2574723 624630 1089917 1393013 906216
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
ALICE1%
ATLAS34%
CMS16%
LHCb35%
Other3%
H11%
ZEUS1%
D05%
BaBar4%
CDF0%
2006 CPU Usage
by experiment
UK Resources
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
LCG Disk Usage
Available (TB) Used (TB) Ratio
1Q06 2Q06 3Q06 4Q06 1Q06 2Q06 3Q06 4Q06 1Q06 2Q06 3Q06 4Q06
Brunel 1.5 1.1 4.7 0.1 0.2 4.3 6.70% 18.10% 91.10%
Imperial 0.3 3.2 5.6 35.4 0.3 2.2 2.9 25.5 88.80% 69.40% 51.70% 72.00%
QMUL 18.2 15.9 18.2 18.2 14.3 3.6 3.4 4.8 78.40% 22.60% 18.40% 26.40%
RHUL 2.7 2.7 2.7 5.5 2.5 0.3 0.2 1.5 90.50% 10.60% 7.70% 27.30%
UCL 1.1 0 1 2 0.9 0 0.3 1.4 82.60% 54.30% 32.60% 70.00%
Lancaster 63.4 53.1 47.7 60 29.9 13.1 26.9 12.8 47.10% 24.70% 56.30% 21.30%
Liverpool 2.8 0.6 2.8 0 0 0.1 1.4 0.80% 16.30% 50.00%
Manchester 66.9 67.6 176.8 0 1.9 3.9 5.4 2.80% 5.80% 3.10%
Sheffield 4.5 3.9 2.3 2.2 4.4 1.2 0.3 0.1 95.80% 32.10% 12.40% 4.50%
Durham 1.9 1.9 3.5 3.5 0.6 1.3 0.9 1.2 30.90% 68.10% 25.40% 34.30%
Edinburgh 31 30 29 20 16.6 13.5 2.8 3.9 53.60% 45.10% 9.50% 19.50%
Glasgow 4.3 4.3 1.6 34 3.8 0.6 1.1 4.1 89.90% 15.00% 70.80% 12.10%
Birmingham 1.8 1.8 1.9 1.8 1.3 0.6 0.8 1.3 73.30% 31.80% 41.60% 72.20%
Bristol 0.2 0.2 2.1 1.8 0.2 0 0.3 0.4 89.60% 12.00% 16.00% 22.20%
Cambridge 3.2 3.2 3 3.1 3.1 0 0.8 2.1 94.70% 0.60% 26.30% 67.70%
Oxford 3.2 1.6 3.2 3.2 2.5 0 0 0.5 80.10% 1.10% 0.00% 15.60%
RAL PPD 6.8 6.8 6.4 16.6 6.4 0.6 0.3 13.5 93.50% 9.40% 4.20% 81.30%
London 22.4 23.4 28.7 65.8 17.9 6.2 7 37.5 80.30% 26.60% 24.40% 57.00%
NorthGrid 67.9 126.7 118.2 241.8 34.2 16.2 31.2 19.7 50.40% 12.80% 26.40% 8.10%
ScotGrid 37.1 36.2 34.1 57.5 21 15.5 4.8 9.2 56.60% 42.80% 14.00% 16.00%
SouthGrid 15.2 13.6 16.6 26.5 13.4 1.3 2.2 17.8 88.60% 9.30% 13.20% 67.20%
Total Tier-2 142.5 199.8 197.5 391.6 86.6 39.2 45.1 84.2 60.70% 19.60% 22.80% 21.50%
Tier-1 121.1 114.4 123.1 145.3 56.4 107.2 149.4 177.7 46.60% 93.70% 121.40% 122.30%
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
(individual rates)
0
100
200
300
400
500
600
700
800
900
Lanc
aster
RALPP
Birming
ham
Glasgo
w
Edinbu
rgh
Oxford
Man
ches
ter
Sheffie
ld
Cambridge
Bristo
l
UCL-CENTRAL
Durham
QMUL
IC-H
EP
IC-L
eSC
UCL-HEP
RHUL
Brunel
Liver
pool
Tra
nsf
er r
ate
in M
b/s
Inbound Q1 Inbound Q3 Outbound Q1 Outbound Q3
Aim: to maintain data transfers at a sustainable level as part of experiment service challenges
http://www.gridpp.ac.uk/wiki/Service_Challenge_Transfer_Test_Summary
File Transfers
Current goals:>250Mb/s inbound-only>250Mb/s outbound-only >200Mb/s inbound and outbound
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
• Approval for new (shared) machine room – ETA Summer 2008. Space for 300 racks.
• Procurement – March 06: 52 AMD 270 units, 21 disk
servers (168TB data capacity)– FY 06/07: 47 disk servers (282TB disk
capacity), 64 twin dual-core Intel Woodcrest 5130 units (550kSI2K)
– FY 06/07 upcoming: further 210 TB disk capacity plus high-availability systems (redundant PSUs, hot-swappable paired HDDs)
• Storage commissioning saga– Ongoing problems with March kit.
Firmware updates have now solved problem. (Disks on Areca 1170 in raid 6 experienced multiple dropouts during testing of WD drives)
• Move to CASTOR– Very support heavy but made available
for CSA06 and performing well
General- Air-con problems with high-temperatures triggering high pressure cut-outs in refrigerator gas circuits- July security incident - 10Gb CERN line in place. Second 10Gb line scheduled in 07Q1
Tier-1 Resource
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
e.g. Glasgow: UKI-SCOTGRID-GLASGOW
• 800 kSI2k• 100 TB DPM
Needed for LHC start-upAugust 28
September 1
October 13
October 23
T2 Resources
IC-HEP•440 KSI2K•52 TB dCache
Brunel•260 KSI2K•5 TB DPM
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
GridPP Middleware incorporates..
Security
Network Monitoring
Information Services
Grid Data Management
Storage Interfaces
Workload Management
Middleware
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
MSN Outlook• The results of the GridPP2+ project extension proposal to PPARC were
made known to GridPP in November 2006 • The effects on MSN are significant and particularly damaging with the
overall effort reduced by more than a third from 13 to 8.3 FTEs • WMS testing and contributions to EGEE SA3 will reduce • GridPP work on metadata will cease and UK leadership will be lost, but
this is known to be an area the experiments are keen to see tackled • The reduction in Information and Monitoring effort will severely
impact re-engineering work and support for R-GMA and compromises UK obligations in fulfilling the EGEE contract
• GridPP has recognised the importance of finishing the R-GMA re-engineering, thus meeting the R-GMA deliverables to EGEE and has therefore agreed (in consultation with PPARC) to meet the costs of maintaining the current staffing levels to the end of EGEE-II from within existing allocations
• The reduction in networking activities is likely to impact GridPP’s ability to optimise its use of the underlying JANET network
• Staff whose contracts will not be extended beyond the end of August 2007 have been informed
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
e.g. ATLAS Tier-2 Testing
• Most of the experiments are now well advanced in highly pragmatic deployment issues, particularly in advance of the LHC data at the end of 2007
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
Applications Outlook• Products developed by GridPP are in mainstream
use, and will form a vital component of the computing system of each LHC experiment for first data-taking and analysis
• However, almost all explicit funding for the further development and support of such products will terminate in September 2007, since it is now clear that this area will be supported neither via GridPP3 (as planned) nor the Rolling Grants round (as requested)
• This is a matter of concern both for the UK collaborations and the experiments as a whole
• Recovery plans are being prepared within each experiment, attempting to use non-specialist RA effort in tension with physics and hardware support, but there will be profound negative consequences for the continuation and maintenance of these projects
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
Dissemination Outlook• Dissemination was one of the areas not fully funded in
GridPP2+ • The Dissemination Officer post was funded at 0.5 FTE (as at
present), but the PPRP did not allocate funds to continue the Events Officer position
• Due to a large number of events and activities planned for the end of 2007, we aim to fund this position for some months out of the current dissemination budget
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
Hardware OutlookPlanning for 2007..
• A profiled ramp-up of resources is planned throughout 2007 to meet the UK requirements of the LHC and other experiments
• The results are available for the Tier-1 and Tier-2s• The Tier-1/A Board reviewed UK input to
International MoU negotiations for the LHC experiments as well as providing input to the International Finance Committee for BaBar
• An impasse was reached in planning for 2007 • No new investment in the BaBar Tier A analysis
facility hardware is planned• For LCG, the 2007 commitment for disk and CPU
capacity can be met out of existing hardware already delivered
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
Timeline
Proposal Writing Proposal Defence
Apr May Jun Jul Aug Sep Oct
31st March – P
PARC Call
16th June – G
ridPP16 at Q
MUL
6th September – 1
st PPRP review
1st November – Grid
PP17
8th NovemberPPRP “visiting panel”30th November GridPP2+ outcome~FebruaryGridPP3 outcome
13th July – B
id Submitted
CB OC CB
Future?
~10 month process to propose/defend/define future programme
htt
p:/
/ww
w.g
ridpp.a
c.uk/
docs
/gri
dpp3
/
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
Scenario Planning – Resource Requirements [TB, kSI2k]
GridPP requested a fair share of global requirements, according to experiment requirements
Changes in the LHC schedule prompted a(nother) round of resource planning - presented to CRRB on Oct 24th
New UK resource requirements have been derived and incorporated in the scenario planning e.g. Tier-1
Tier1 CPU 2008 2009 2010ALICE 10230 18430 22930ATLAS 18123 28423 49573CMS 12400 16900 36900LHCb 1770 4870 6740TOTAL 42523 68623 116143
Tier1 Disk 2008 2009 2010ALICE 5220 7940 9870ATLAS 9939 19686 39488CMS 5600 8500 13700LHCb 1025 2759 3250TOTAL 21784 38885 66308
Tier1 Tape 2008 2009 2010ALICE 7030 13980 20930ATLAS 7694 14950 28698CMS 13100 23500 36600LHCb 860 3070 5864TOTAL 28684 55500 92092
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
Input to Scenario Planning –Hardware Costing
• Empirical extrapolations with extrapolated (large) uncertainties• Hardware prices have been re-examined following recent Tier-1 purchase •CPU (woodcrest) was cheaper than expected based on extrapolation of previous 4 years of data
CPU Costs
-4
-3
-2
-1
0
1
01-Jan-02 16-May-03 27-Sep-04 09-Feb-06 24-Jun-07 05-Nov-08 20-Mar-10Date
Ln
(K£/
KS
I2K
)
Past CPU Purchase
Best fit to past purchases
29 month extrapolation
20 month extrapolation
Future price estimates
Max
Min
GridPP3 submission
CERN
Disk Costs
-2
-1
0
1
2
3
01-Jan-02 16-May-03 27-Sep-04 09-Feb-06 24-Jun-07 05-Nov-08 20-Mar-10Date
Ln
(K
£/T
B)
Past Purchases
Best fit (21.7months)
24 months
19 months
Future price estimates
Upper Limit
Lower limit
GridPP3 Proposal
CERN
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
Scenario PlanningAn example 70% “minimum viable level” scenario [£m]
WG Area Item Cost WG Frac Area Item CostStaff 4.99 93% Staff 4.62Hardware 11.72 85% Hardware 7.20Staff 3.29 89% Staff 2.94Hardware 5.12 85% Hardware 4.35
C Support Staff 4.50 C 69% Support Staff 3.10D Operations Staff 1.89 D 88% Operations Staff 1.66E Management Staff 1.17 E 90% Management Staff 1.06F Outreach Staff 0.37 F 74% Outreach Staff 0.28G Travel etc Other 0.84 G 75% Travel etc Other 0.63
33.89 25.841.25 0% 0.00
35.14 25.844.15 5.172.50 2.50
41.79 33.51Full Approval CostRunning Costs
GridPP3 Proposal 70% Scenario
Working AllowanceProject Cost
B
Full Approval Cost
Working AllowanceProject CostContingencyRunning Costs
Contingency
A Tier-1
B Tier-2
Tier-1
Tier-2
A
Oversight Committee8 February 2007 Tony Doyle - University of Glasgow
Beyond GridPP2 • The separation between GridPP2+ and GridPP3 was
primarily designed to ensure an early decision could be made on the extension in order to retain key staff
• Approval for the extension was received in late November but included major cuts in the middleware support area
• This is problematic in two ways: – EU-CCLRC contractual obligation– crucial 7 month ramp-up period - the worst time to cut back
• Problems are severely compounded by the outcome of the Rolling Grant round where much of the Applications support work will be lost during this same critical period
• We currently await the outcome of the GridPP3 bid in order to be able to assess the whole picture
• We anticipate a highly challenging period from September 2007 onwards