GENERAL DEMOLITION NOTES

1. DEMOLITION PLANS INDICATE SOME OF THE SCOPE-OF-WORK INVOLVED FOR THE DEMOLITION PHASE OF THIS PROJECT. CONTRACTOR SHALL REVIEW ALL SHEETS FOR ADDITIONAL DEMOLITION SCOPE.

2. CONTRACTOR SHALL VERIFY EXISTING SITE AND BUILDING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO DEMOLITION ACTIVITIES AND WORK.

3. CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES IN WRITING.4. CONTRACTOR SHALL NOTIFY ARCHITECT AND OWNER OF ANY POSSIBLE ASBESTOS

CONTAINING MATERIALS DISCOVERED BEFORE PROCEEDING WITH WORK.5. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS BEFORE COMMENCING WORK.6. AFTER AWARD OF THE CONTRACT, CHANGE ORDER REQUESTS FOR ADDITIONAL

MONEY WILL NOT BE APPROVED IF THE WORK COULD HAVE BEEN ANTICIPATED DURING A SITE VISIT BY THE CONTRACTOR.

7. CONTRACTOR SHALL NOT SCALE DRAWINGS.8. CONTRACTOR SHALL PROVIDE ALL NECESSARY TEMPORARY SHORING, TEMPORARY

BRACING, AND OR TEMPORARY SUPPORTS AS REQUIRED TO MAINTAIN STRUCTURAL INTEGRITY OF EXISTING STRUCTURE TO REMAIN AND OR EXISTING BUILDING ELEMENTS TO REMAIN.

9. CONTRACTOR IS TO VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES PRIOR TO DEMOLITION ACTIVITIES AND WORK.

10. CONTRACTOR SHALL REMOVE TRASH AND DEBRIS REGULARLY AS NECESSARY TO ELIMINATED INTERFERENCE WITH ROADS, STREET, WALKS, AND ALL OTHER ADJACENT FACILITIES.

11. CONTRACTOR SHALL REMOVE TRASH AND DEBRIS FROM THE SITE ON A DAILY BASIS.12. CONTRACTOR SHALL REPAIR, REPLACE, OR PATCH EXISTING BUILDINGS, DRIVEWAYS,

SIDEWALKS, CANOPIES, AND OR PARKING AREAS DAMAGED, MODIFIED, AND OR DISTURBED BY DEMOLITION WORK AT NO COST TO THE OWNER.

13. ALL EXISTING EQUIPMENT THAT REMAINS SHALL BE PROTECTED DURING DEMOLITION AND OR CONSTRUCITON TO PREVENT DAMAGE. ANY DAMAGE TO REMAINING EXISTING EQUIPMENT SUSTAINED DURING DEMOLITION AND OR CONSTRUCITON SHALL BE EQUIVALENTLY REPLACED OR EQUIVALENTLY REPAIRED AT NO COST TO THE OWNER.

14. CONTRACTOR SHALL PROVIDE TRAFFIC HANDLING MEASURES TO PROTECT THE GENERAL PUBLIC AT ALL TIMES, AS NECESSARY AND AS REQURED BY AUTHORITIES HAVING JURISDICTION.

15. DO NOT INTERRUPT EXISTING UTILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING UTILITIES, AS ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION.

16. WHEN UTILITY SERVICES ARE REQUIRED TO BE REMOVED, RELOCATED, OR ABANDONED, PROVIDE BYPASS CONNECTIONS TO MAINTAIN CONTINUITY OF SERVICE BEFORE PROCEEDING WITH DEMOLITION.

17. CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES INCLUDING BUT NOT LIMITED TO THE FOLLOWING: ELECTRIC, GAS, WATER, TELEPHONE, STORM SEWER, AND SANITARY SEWER FOR FIELD LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITY LINES. PRIOR TO COMMENCEMENT OF ANY DEMOLITION WORK, CONTRACTOR SHALL IDENTIFY ALL ELECTRICAL CIRCUITS SERVICING THE AREA INVOLVED WITH THIS DEMOLITION. THOSE CIRCUITS SHALL THEN BE LOCKED OUT AND TAGGED OUT IF THEY DO NOT SERVICE ANY OF THE REMAINING BUILDING. THOSE CIRCUITS WHICH ARE IDENTIFIED TO SERVICE BOTH THE AREA TO BE DEMOLISHED AND THE REMAINING BUILDING SHALL BE SPLIT SO AS TO KILL ALL ELECTRICAL POWER TO THE AREA TO BE DEMOLISHED WHILE MAINTAINING POWER TO THE REMAINDER OF THE BUILDING.

18. PROTECT EXISTING SITE ELEMENTS AND EXISTING LANDSCAPING TO REMAIN. PROTECTION SHALL INCLUDE BUT NOT BE LIMITED TO EXISTING TREES AND OTHER EXISTING VEGETATION INDICATED TO REMAIN IN PLACE AGAINST UNNECESSARY CUTTING, BREAKING, OR SKINNING OF ROOTS, SKINNING OR BRUISING OF BARK, SMOTHERING OF TREES BY STOCKPILING CONSTRUCTION MATERIAL OR EXCAVATED MATERIAL WITHIN DRIP LINES.

19. CONTRACTOR SHALL REGRADE AND HYDROMULCH AREAS AFFECTED BY DEMOLITION.20. OWNER HAS RIGHT OF FIRST REFUSAL OF ALL ITEMS REMOVED AS PART OF THE

SOCPE OF WORK, WHETHER IDENTIFIED AS SALVAGE OR NOT.21. NOTIFY THE BUILDING OWNER OF ANY MATERIALS, FIXTURES, ETC. TO BE REMOVED

THAT ARE DEEMED SALVAGEABLE. TURN OVER ANY REQUESTED ITEMS TO THE BUILDING OWNER IN GOOD AND CLEAN CONDITION.

22. ALL FURNITURE WILL BE REMOVED OR RELOCATED BY THE OWNER AS NECESSARY PRIOR TO THE DEMOLITION WORK OF THIS PROJECT. CONTRACTOR SHALL COORDINATE WITH OWNER AS REQUIRED.

23. REMOVE EXISTING CONSTRUCTION TO THE EXTENT INDICATED ON THE DRAWINGS. SHOULD ANY DAMAGE OCCUR TO ANY EXISTING CONSTRUCTION TO REMAIN, THE CONTRACTOR SHALL REPAIR THE DAMAGE TO MATCH EXISTING AND OR ADJACENT CONSTRUCTION AT NO COST TO THE OWNER.

24. ALL DASHED LINES ARE DEMOLITION LINES U.N.O.

DEMOLISH EXISTING

ADMINISTRATION BUILDING

REMOVE GRASS TO EXTEND SIDEWALK SOUTH APROX. 6'

REMOVE OVERHEAD

CANOPY AND STRUCTURAL

COLUMNS

HERITAGE TREE TO BE SAVED AND RELOCATED

SIG

N

REMOVE SIDEWALK AND CURB UP TO

THIS POINT

PORTION OF EXISTING RETAINING WALL TO REMAIN

EXISTING STAIR TO REMAIN

REMOVE TREE

REMOVE TREES

PLANTER RETAINING WALL (ENTIRE PERIMETER) TO REMAIN

EXISTING BENCH TO REMAIN

REMOVE PLANTER CONCRETE WALLS

SIGN

GL

GL

GL

GL

GL

LP

SIG

N

SIG

N

LPLP

EXISTING CONCRETE WALL TO REMAIN

REMOVE PLANTER CONCRETE WALLS

EXISTING PALM TREE TO REMAIN

REMOVE SIDEWALK

REMOVE STAIRS

REMOVE SIDEWALK

REMOVE STAIRS

REMOVE AND SALVAGE LIGHT POLE FOR OWNER REUSE

REMOVE CURB

DISASSEMBLE SIGN AND SALVAGE FOR OWNER REUSE

REMOVE CONCRETE WALLS

REMOVE FLAG POLE BASE. DISASSEMBLE FLAG POST

AND SET ASIDE TO SAVE FOR OWNER

REMOVE CURB AND SIDEWALK

F.H.

PROTECT FIRE HYDRANT

REMOVE SIDEWALK UP TO THIS POINT

DISASSEMBLE SIGN AND SALVAGE FOR OWNER REUSE

REMOVE SIDEWALK UP TO THIS POINT

REMOVE SIDEWALK UP TO THIS POINT

REMOVE SIDEWALK UP TO THIS POINT

EXISTING OVERHEAD CANOPY TO REMAIN

PROTECT EXISTING TREES TO REMAIN

REMOVE AND SALVAGE LIGHT POLE FOR OWNER REUSE

EXISTING BENCH TO REMAIN REMOVE SIDEWALK UP

TO THIS POINT

PROTECT EXISTING TREES TO REMAIN

STUDENT CENTER

LEARNING

RESOURCES

CENTER

INLET

DISASSEMBLE SIGN AND SALVAGE FOR OWNER REUSE

E.B.

VAULT

W.V.

W.V.W.V.

VAULT

INLETINLET

REMOVE AND SALVAGE LIGHT FOR OWNER REUSE

PROTECT EXISTING INLETS DURING DEMOLITION, MAINTAIN SITE DRAINAGE

PROTECT EXISTING INLETS DURING DEMOLITION, MAINTAIN SITE DRAINAGE

PROTECT EXISTING INLETS DURING DEMOLITION, MAINTAIN SITE DRAINAGE

TREE LEGEND

TREES TO REMAIN

DEDICATED TREES TO BE RELOCATED

TREES TO REMOVE

LANDSCAPE LEGEND

GRASS

PLANTER

NEW CONCRETE SIDEWALK, RETAINING WALLS, STAIRS AND RAMPS

EXISTING SIDEWALK TO REMAIN

Other

Architect

CIVIL

ARCHITECT PBK Architects, Inc.

LANDSCAPE VERDANT

STRUCTURAL DALLY + ASSOCIATES

MEPT

DATE

PROJECT NUMBER

CLIENT

REVISIONS

Interim Notification

This document is incomplete and is for interim review only

Not for regulatory approval, permitting, or construction

1200

N.

AM

BU

RN

RO

AD

T

EX

AS

CIT

Y ,

TX

77

591

PBK.com

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

26310 OAKRIDGE DR., SUITE 3THE WOODLANDS, TX 77380

832-861-9014 P

9800 RICHMOND AVE., SUITE 3HOUSTON, TX 77042

713-337-8881 P 713-337-8882 F

THE WOODLANDS10200 Grogans Mill Road, Suite 230

The Woodlands, TX 77380281-528-1697 P281-882-2385 FTX Firm: F-1608

11 Greenway Plaza, Suite 1510Houston, TX 77046

713-940-3300 P 713-961-4571 FTX Firm: F-18672

LEAFE N G I N E E R S

A COMPANYPBK

9800 RICHMOND AVE. SUITE 460HOUSTON, TX 77042

713-337-8881 P 713-337-8882 F

DALLY + ASSOCIATES

(ORIGINAL PAPER SIZE: ARCH E1 30"x42")

UNDER SEPARATE CONTRACT - FOR REFERENCE ONLY

5/1

0/2

01

9 6

:07:5

2 P

M

C:\U

sers

\lbu

rden

\Do

cum

ents

\1840

4_C

OM

ST

UD

EN

T S

UC

CE

SS

_A

17_

lburd

en.r

vt

AD

MIN

IST

RA

TIO

N B

UIL

DIN

G

DE

MO

L IT

ION

PA

CK

AG

E

AD0.01

SITE DEMOLITION

PLAN

MAY 10, 2019

18404

COLLEGE OF THE MAINLAND

DEMOLITION PACKAGE

Aut

hor

Che

cker

MAY 10, 2019

ALAN STILTSArchitectural Registration No.24363

DE

MO

LIT

ION

PA

CK

AG

E

1" = 20'-0"6 DEMOLITION SITE PLAN

No. Description Date

astilts
Rectangle
BWiggins2
Line
BWiggins2
Line
BWiggins2
Line
BWiggins2
Line
BWiggins2
Line
BWiggins2
Line
BWiggins2
Line
BWiggins2
Polygon
BWiggins2
Typewritten Text
SEE SITE PLAN FOR CONTINUATION OF FENCE
BWiggins2
Typewritten Text
SEE SITE PLAN FOR CONTINUATION OF FENCE

top related