FY2018 NAVAJO NATION TRIBAL TRANSPORTATION IMPROVEMENT
PROGRAM
Submitted By: Navajo Division of Transportation
March 2, 2018
N31 ~ Navajo, NM N9345 ~ Wide Ruins, AZ
N55 ~ Alamo, NM N251 ~ Tselani/Cottonwood, AZ
NAVAJO DIVISION TRANSPORTATION POST OFFICE BOX 4620 TEL: 505-371-8300 WINDOW ROCK, ARIZONA 86515 FAX: 505-371-8399
Russell Begaye, President Jonathan Nez, Vice President
TABLE OF CONTENTS
Page
Executive Summary…………………………………………. 1
Completed Construction Projects FY2017………………… 2 - 3
Ongoing Construction Projects FY2017…………………… 4
Proposed Program Five Year Plan FY2018-2022…………. 5 - 9
Section 1: Operations, Maintenance & Safety…………….. 10 - 15
Project Information Sheet
Section 2: Northern Agency Project Information Sheet….. 16 - 24
Section 3: Western Agency Project Information Sheet…… 25 - 33
Section 4: Eastern Agency Project Information Sheet……. 34 - 40
Section 5: Chinle Agency Project Information Sheet……… 41 - 49
Section 6: Ft. Defiance Agency Project Information Sheet… 50 - 60
NAVAJO DIVISION TRANSPORTATION POST OFFICE BOX 4620 TEL: 505-371-8300 WINDOW ROCK, ARIZONA 86515 FAX: 505-371-8399
Russell Begaye, President Jonathan Nez, Vice President
Tribal Transportation Improvement Program
Executive Summary The Navajo Division of Transportation (Navajo DOT), in partnership with the Bureau of Indian Affairs (BIA) Division of Transportation – Navajo Region (NRDOT), is responsible for approximately 4,900 miles of Tribal roads and 6,000 miles of BIA roads across the Navajo Nation. Approximately 14 percent of these roads are paved and the vast majority (86 percent) of these roads are unimproved dirt roads. Of the 1,500 miles of paved roads, over 50% are in poor pavement condition. Additionally, there are a total of 179 bridges maintained by the BIA NRDOT and Navajo DOT, of which 38 bridges are eligible for rehabilitation and an additional 28 bridges are eligible for replacement. The Navajo DOT and BIA NRDOT are challenged with a limited budget to maintain and improve these dirt and paved roads, and also addressed the rehabilitation and replacement of bridges.
The Navajo Nation receives approximately $54 million annually from the Federal Highway Administration (FHWA) under the Tribal Transportation Program (TTP) to plan, design, build, maintain and operate Tribal and BIA-owned roadways within the Navajo Nation in order to provide connections that improve people’s lives. Guided by the 25 Coded Federal Regulations (CFR) Part 170 Subpart D under the Tribal Transportation Program (TTP) for the Transportation Planning, Tribal Transportation Improvement Program (TTIP), Long Range Transportation Plan (LRTP) development, annual update of the Tribal Transportation Facility Inventory and Public Hearings, the Navajo DOT is charged to performed the critical functions in collaboration with the BIA NRDOT, local, state and federal agencies to develop a tribal transportation priority listing.
The FY2018 Navajo Nation Tribal Transportation Improvement Program (NNTTIP) outlines a five-year program regarding how funding is used to manage the transportation system. The funding in the TTIP is a five-year, fiscally constrained program, and it must be consistent with the goals and objectives of the Long Range Transportation Plan (LRTP), in the Navajo Nation road inventory, and adhere to all relevant provisions found in the current transportation bill, Fixing America’s Surface Transportation Act (FAST Act). Projects listed on the 5 year TTIP have funds programmed for: Preliminary studies which are cultural, environmental impact studies, rights of way, centerlines
surveys and design; Construction engineering funds are for construction administration; and Construction funds to construct the roadway improvements.
Annually, the Navajo Nation TTIP priority is updated with projects that are most critical to the communities and the Navajo Nation based on the prioritization criteria and submitted to the Resources and Development Committee (RDC) for review and approval. The RDC-approved TTIP is submitted to Federal Highway Administration (FHWA) for final approval and will be included in the national transportation improvement program by FHWA.
Page 1
NAVAJO DIVISION TRANSPORTATION POST OFFICE BOX 4620 TEL: 505-371-8300 WINDOW ROCK, ARIZONA 86515 FAX: 505-371-8399
Russell Begaye, President Jonathan Nez, Vice President
Completed Construction Projects FY2017
Construction of three (3) projects listed on the FY2017 NNTTIP were completed. These three (3) projects constructed 16.1 miles of new pavement, one (1) three-span bridge, four (4) precast concrete box culverts, culvert installations, and retaining walls at a total cost of $44,299,659. These projects are listed below:
1. N9345(2)2,4 – Wide Ruins, AZ (Fort Defiance Agency)The Navajo Nation, in partnership with the BIA DOT Navajo Region, constructed 1.9 miles ofgrade and drainage work, placement of new retaining walls, placement of new pavement, andmiscellaneous construction work at a cost of $5,964,746. BIA DOT NR provided preliminaryengineering and construction engineering services. The project was constructed by the NavajoEngineering and Construction Authority under a P.L. 93-638 construction contract.
2. N55(3)1,2,4 – Alamo, NM (Eastern Agency)The Navajo Nation, in partnership with the BIA DOT Navajo Region, constructed 8.7 miles ofgrade and drainage work, new four (4) barrel precast concrete box culvert, placement of newpavement, and miscellaneous construction work at a cost of $20,836,651. BIA DOT NR providedpreliminary engineering and construction engineering services. The project was constructed byMeridian Contracting, Inc. under a commercial construction contract.
Page 2
3. N31(4)1,2,4 – Navajo, NM (Fort Defiance Agency)The Navajo Nation, in partnership with the BIA DOT Navajo Region, constructed 5.5 miles ofgrade and drainage work, new three-span bridge, concrete box culvert installation, placement ofnew pavement, and miscellaneous construction work at a cost of $17,498,262. BIA DOT NRprovided preliminary engineering and construction engineering services. The project wasconstructed by the Navajo Engineering and Construction Authority under a P.L. 93-638construction contract.
Page 3
NAVAJO DIVISION TRANSPORTATION POST OFFICE BOX 4620 TEL: 505-371-8300 WINDOW ROCK, ARIZONA 86515 FAX: 505-371-8399
Russell Begaye, President Jonathan Nez, Vice President
Ongoing Construction Projects FY2017
Four (4) projects listed on the FY2017 NNTTIP are under construction and listed in the FY2018 NNTTIP. These four (4) projects will construct 4.3 miles of new pavement, 16.4 miles of treated gravel surface, and two (2) bridges at a total cost of $32,113,653. These projects are listed below:
1. N251(1-1)(2-1)(3-1)1,2,3 – Tselani/Cottonwood, AZ (Chinle Agency)The Navajo Nation, in partnership with the BIA DOT Navajo Region, will construct 15.2 miles ofgrade and drainage work, placement of treated gravel surface, and miscellaneous constructionwork at a cost of $9,243,213.
2. N8008(1)1,2,3 – Round Rock, AZ (Northern Agency)The Navajo Nation, in partnership with the BIA DOT Navajo Region, will construct 1.2 miles ofgrade and drainage work, new six-span steel girder bridge, placement of treated gravel surface,and miscellaneous construction at a cost of $5,075,648.
3. N12(19-3) & N9(12A)(12B)2&4 – Tsaile, AZ & Pueblo Pintado, NM (Chinle & EasternAgency)The Navajo Nation, in partnership with the BIA DOT Navajo Region, will construct 3.2 miles ofgrade and paving work, and miscellaneous construction work at a cost of $2,330,000.
4. N2007(1-1)1,2,4 – Navajo, AZ (New Lands/Fort Defiance Agency)The Navajo Nation, in partnership with the BIA DOT Navajo Region, will construct 1.1 miles ofgrade and drainage work, new four-span precast prestressed girder bridge, placement of newpavement, and miscellaneous construction at a cost of $15,464,792.
Page 4
UN
OFF
ICIA
LSu
mm
ary
of
Pro
ject
s Li
stN
avaj
o N
atio
n
UN
OFF
ICIA
LP
roje
ct N
ame
Pro
ject
No
.C
on
st. Y
r2
01
82
01
92
02
02
021
20
22To
tal
N20
07
(1-1
)1,2
,4 N
666
New
La
nd
s R
io P
uer
co B
rid
ge
Rep
lace
men
t
N20
07
(1-
1)1
,2,4
N6
66
$1
5,7
64,7
92
$5
0,0
00$
0$
0$
0$
15
,81
4,7
92
20
17
N60
9(2
)2,4
Ker
ly S
tree
tN
609
(2)2
,4$
0$
0$
0$
150
,00
0$
2,6
50,
000
$2
,80
0,0
00
20
22
N64
86
(1)1
,2,3
N3
08
& N
31
4 Lo
wer
Lag
un
a C
reek
Bri
dge
R
epla
ce
N64
86
(1)1
,2,3
N
308
& N
314
$3
0,0
00$
0$
0$
0$
0$
30
,00
02
02
2
N46
(4)/
N4
74
(4)1
,2,4
to
C
ou
nse
lor
SR5
50
N46
(4)/
N4
74
(4)
1,2
,4$
15
0,0
00
$1
00
,00
0$
15
,000
,00
0$
250
,00
0$
0$
15
,50
0,0
00
20
20
N50
12
(1)1
,2,3
San
ost
ee W
ash
B
rid
ge N
20
4N
501
2(1
)1,2
,3$
15
0,0
00
$0
$3
,92
5,0
00$
0$
0$
4,0
75
,00
02
02
0
N64
61
(1-2
)/N
646
0(1
)2&
4
Den
neh
ots
o L
oo
p R
oad
N64
61
(1-
2)/
N6
46
0(1
)2&
4
$8
,00
9,3
00$
0$
0$
0$
0$
8,0
09
,30
02
01
8
N64
85
(1)2
,4N
648
5(1
)2,4
$0
$0
$0
$1
50,0
00
$5
0,0
00$
20
0,0
00
20
23
N15
(3-1
)(4
-1)2
&4
Co
rnfi
eld
s-Su
nri
seN
15(3
-1)(
4-
1)2
&4
$0
$0
$5
0,0
00$
50,
000
$1
6,3
50,0
00
$1
6,4
50
,00
02
02
2
ND
OT
2% P
lan
nin
g Fu
nd
s$
1,2
00
,000
$1
,20
0,0
00$
1,2
00
,000
$1
,20
0,0
00$
1,2
00,
000
$6
,00
0,0
00
Air
po
rt M
ain
ten
ance
$3
00
,00
0$
30
0,0
00
$3
00
,00
0$
300
,00
0$
300
,00
0$
1,5
00
,00
0
ND
OT
Mai
nte
nan
ce$
4,3
50
,000
$4
,40
0,0
00$
4,4
00
,000
$4
,40
0,0
00$
4,4
00,
000
$2
1,9
50
,00
0
Nav
ajo
Nat
ion
Tri
bal
Tr
ansp
ort
atio
n S
afet
y P
lan
$1
2,5
00$
0$
0$
0$
0$
12
,50
0
Hig
hw
ay S
afet
y Ed
uca
tio
n
Pro
gram
$2
06
,33
6$
0$
0$
0$
0$
20
6,3
36
N36
N36
$7
2,0
00$
1,0
99
,000
$0
$0
$0
$1
,17
1,0
00
20
19
N50
01
(1)1
,2,4
wit
h N
24
1 &
N
214
Bri
dge
Rep
lace
N
ewco
mb
to
To
adle
na
N50
01
(1)1
,2,4
$5
0,0
00$
50
,000
$1
0,3
00,0
00
$1
00,0
00
$0
$1
0,5
00
,00
02
02
0
N5
5(3
)1,2
,4 A
lam
o t
o I-
40
N5
5(3
)1,2
,4$
20,
856
,65
1$
0$
0$
0$
0$
20
,85
6,6
51
20
14
Pag
e 1
of
55
11
/16
/201
7 3
:01
:22
PM
UN
OFF
ICIA
L
Page 5
Gre
asew
oo
d G
rave
l Pit
$2
,00
0,0
00$
0$
0$
0$
0$
2,0
00
,00
02
01
8
N10
8(1
)1,2
,4 B
rid
ge N
65
1N
108
(1)1
,2,4
$1
5,0
00$
0$
0$
0$
0$
15
,00
02
02
2
N11
(1a)
1,2
,4 N
9 t
o M
aria
no
La
ke S
ou
th E
nd
N11
(1a)
1,2
,4$
50
,000
$1
2,2
00,0
00
$4
00
,00
0$
0$
0$
12
,65
0,0
00
20
19
N63
31
(2)2
&4
/N6
33
0(1
)/N
21(
1A
)1,2
,4 T
rad
ing
Po
st B
rid
geR
epla
ce N
31
0
N63
31
(2)2
&4
/N6
33
0(1
)/N
21
(1A
)1,2
,4
$1
4,1
78,3
28
$3
50
,00
0$
0$
0$
0$
14
,52
8,3
28
20
18
N71
19
(1)/
N4
81
(1)2
&4
Li
ttle
wat
er C
hap
ter
Acc
ess
Ro
ad
N71
19
(1)/
N4
81
(1)2
&4
$5
,25
0,9
81$
0$
0$
0$
0$
5,2
50
,98
12
01
8
N13
(3-3
)4 U
S49
1 t
o R
ed
Val
ley
Pav
emen
t R
ehab
ilita
tio
n
N13
(3-3
)4$
0$
25
0,0
00
$5
0,0
00$
5,4
50,
000
$5
00,0
00
$6
,25
0,0
00
20
21
N80
84
(1)1
,2,3
Man
y Fa
rms
to
N64
N80
84
(1)1
,2,3
$2
5,0
00$
25
,000
$4
,69
5,2
83$
7,6
91,
717
$2
00,0
00
$1
2,6
37
,00
02
02
1
N90
73
(1)(
2)1
,2&
4 B
lue
Can
yon
Ro
ad w
/ B
rid
ge N
60
6N
907
3(1
)(2)
1,2
&4
$4
,72
1,7
17$
13
,705
,00
0$
70
6,2
83
$0
$0
$1
9,1
33
,00
02
01
9
N4(
5)/
N8
03
1(2
)/N
80
31
(3)/
N8
03
1(4
)1,2
,3 P
ino
n t
o H
ard
rock
N4(
5)/
N8
03
1(2
)/N
80
31
(3)/
N8
03
1(4
)1,2
,3
$1
1,2
00,0
00
$1
1,5
00,0
00
$7
50
,00
0$
0$
0$
23
,45
0,0
00
20
19
N70
54
(1)2
,3 P
ined
ale
east
en
tran
ce o
ff N
11
N70
54
(1)2
,3$
3,7
00
,000
$5
0,0
00$
0$
0$
0$
3,7
50
,00
02
01
8
N35
(8)/
N5
04
5(1
)1,2
,4N
35(8
)/N
50
45
(1
)1,2
,4$
10
,646
,00
0$
25
0,0
00
$0
$0
$0
$1
0,8
96
,00
02
01
8
N7
1(3
)2&
4 B
ird
spri
ngs
/N1
5 &
Li
ttle
Sin
ger
Sch
oo
l Acc
ess
N7
1(3
)2&
4$
12,
646
,16
0$
300
,00
0$
0$
0$
0$
12
,94
6,1
60
20
18
N15
(2-3
)2&
4 S
R2
64
to
Co
rnfi
eld
s-Su
nri
seN
15(2
-3)2
&4
$1
6,4
10,0
00
$4
00
,00
0$
0$
0$
0$
16
,81
0,0
00
20
18
N10
1(1
)2&
4 O
jo A
mar
illo
Sc
ho
ol A
cces
sN
101
(1)2
&4
$1
,79
5,0
00$
0$
0$
0$
0$
1,7
95
,00
02
01
8
N27
(4-2
)(2
-3)/
N7
(2-
3)/
N1
05
(1)
No
rth
Po
rtio
n o
f N
azlin
i to
Ch
inle
N27
(4-2
)(2
-3
)/N
7(2
-3
)/N
10
5(1
)
$1
7,1
31,3
79
$4
00
,00
0$
0$
0$
0$
17
,53
1,3
79
20
18
Traf
fic
and
Cri
min
al S
oft
war
e (T
raC
s Li
cen
se)
$2
94
,40
7$
0$
0$
0$
0$
29
4,4
07
Pag
e 2
of
55
11
/16
/201
7 3
:01
:22
PM
UN
OFF
ICIA
L
Page 6
BIA
NR
DO
T M
ain
ten
ance
$1
50
,00
0$
15
0,0
00
$1
50
,00
0$
150
,00
0$
150
,00
0$
75
0,0
00
ND
OT
$5
,20
0,0
00$
5,2
00
,000
$5
,20
0,0
00$
5,2
00,
000
$5
,20
0,0
00$
26
,00
0,0
00
NN
DO
T Sa
fety
Pro
ject
s$
72
0,0
00
$7
50
,00
0$
75
0,0
00
$7
50,0
00
$7
50,0
00
$3
,72
0,0
00
N80
08
(1)1
,2,3
Lu
kach
uka
i W
ash
Bri
dge
N80
08
(1)1
,2,3
$5
,12
5,6
48$
0$
0$
0$
0$
5,1
25
,64
82
01
4
N36
(5A
-1)4
US
49
1 t
o C
hac
o
Was
hN
36(5
A-1
)4$
0$
0$
0$
150
,00
0$
4,9
87,
825
$5
,13
7,8
25
20
23
N25
1(5
-2)2
,3 N
ort
h L
oo
p
Tsel
ani o
ff N
4N
251
(5-2
)2,3
$8
,84
1,7
70$
0$
0$
0$
0$
8,8
41
,77
02
01
5
N27
(2-3
)(2
-2)
Sou
th P
ort
ion
o
f N
azlin
i to
Ch
inle
N27
(2-3
)(2
-2)
$1
6,1
64,4
16
$3
50
,00
0$
0$
0$
0$
16
,51
4,4
16
20
18
N1
2(1
9-4
)1,2
&4
Wh
eatf
ield
s La
ke t
o T
saile
, N6
4 J
un
ctio
nN
12
(19
-4)1
,2&
4$
19,
850
,00
0$
450
,00
0$
0$
0$
0$
20
,30
0,0
00
20
18
N67
20
(1)1
,2,3
Bri
dge
N3
09
N67
20
(1)1
,2,3
$5
,00
0$
0$
0$
0$
0$
5,0
00
20
22
N2
03
(2)1
,2 K
inlic
hee
Was
h
Bri
dge
N6
29
N2
03
(2)1
,2$
20,
000
$0
$0
$0
$0
$2
0,0
00
20
22
N12
(13
-2)1
,2&
4 A
gen
cy L
ine
to W
hea
tfie
lds
Lake
N12
(13
-2)1
,2&
4$
50
0,0
00
$4
50
,00
0$
5,5
91
,717
$1
0,6
08,2
83
$3
00,0
00
$1
7,4
50
,00
02
02
1
N31
(4)1
,2,4
Nav
ajo
to
war
d
Mex
ican
Sp
rin
gs N
31
/N3
21
Jct
w
/ 7
5m
Bri
dge
N31
(4)1
,2,4
$1
7,8
30,2
62
$0
$0
$0
$0
$1
7,8
30
,26
22
01
4
N55
(1-1
)2,4
Ala
mo
to
I-40
N55
(1-1
)2,4
$0
$0
$0
$1
00,0
00
$7
,76
2,1
75$
7,8
62
,17
52
02
2
N71
(1-1
)(2
-1)/
N2
(1)2
&4
N71
(1-1
)(2
-1
)/N
2(1
)2&
4$
0$
0$
40
0,0
00
$1
00,0
00
$8
,85
0,0
00$
9,3
50
,00
02
02
2
N94
02
(1)1
,2 R
io P
uer
co
Bri
dge
N6
56
N94
02
(1)1
,2$
10
,000
$0
$0
$0
$0
$1
0,0
00
20
22
N80
66
(3)/
N8
06
5(1
)1,2
,4 N
41
to
Kit
silli
N80
66
(3)/
N8
06
5(1
)1,2
,4$
50
,000
$1
00
,00
0$
13
1,7
17
$1
7,2
00,0
00
$3
50,0
00
$1
7,8
31
,71
72
02
1
N15
(2-2
)(3
-1)(
4-1
) R
OW
Fe
nci
ng
Pro
ject
fro
m
Gre
asew
oo
d S
pri
ngs
to
B
urn
sid
e
N15
(2-2
)(3
-1)(
4-
1)
$2
,75
8,6
62$
0$
0$
0$
0$
2,7
58
,66
22
01
7
Nav
ajo
Nat
ion
Gra
vel P
it
Dev
elo
pm
ent
$3
00
,00
0$
25
0,0
00
$0
$0
$0
$5
50
,00
0
Pag
e 3
of
55
11
/16
/201
7 3
:01
:22
PM
UN
OFF
ICIA
L
Page 7
$2
28
,74
1,3
08
$5
4,3
29,0
00
$5
4,0
00,0
00
$5
4,0
00,0
00
$5
4,0
00,0
00
$4
45
,07
0,3
08
Pag
e 4
of
55
11
/16
/201
7 3
:01
:22
PM
UN
OFF
ICIA
L
Page 8
TIP
Fis
cal S
um
mar
yN
avaj
o N
atio
n
UN
OFF
ICIA
L
$2
28
,74
1,3
08
.42
$5
4,3
29
,00
0.0
0$
54
,00
0,0
00
.00
$5
4,0
00
,00
0.0
0
$2
28
,74
1,3
08
.42
$5
4,3
29
,00
0.0
0$
54
,00
0,0
00
.00
$5
4,0
00
,00
0.0
0
$5
4,0
00
,00
0.0
0
$5
4,0
00
,00
0.0
0
$0
.00
$0
.00
$0
.00
$0
.00
$0
.00
Pro
ject
To
tals
:
Sum
mar
y
$4
45
,07
0,3
08
.42
Fisc
al Y
ear
Rem
ain
de
r:
TOTA
L A
VA
ILA
BLE
FU
ND
S fo
r ea
ch y
ear:
$0
.00
$0
.00
$0
.00
$3
29
,00
0.0
0$
1,9
85
,24
2.4
2
$5
4,0
00
,00
0.0
0$
54
,00
0,0
00
.00
$5
4,0
00
,00
0.0
0$
54
,00
0,0
00
.00
$1
72
,75
6,0
66
.00
$5
4,0
00
,00
0.0
0Es
tim
ated
An
nu
al T
TP S
har
es
Ad
dit
ion
al f
un
ds
(Tig
er,
Saf
ety
, Bri
dge
, Oth
er G
ran
ts)
Car
ryo
ver
Fun
ds
(fro
m p
revi
ou
s FY
)$
0.0
0$
0.0
0$
0.0
0$
0.0
0
Tota
l of
All
Pro
ject
s o
n T
IP
Tota
l Ava
ilab
le F
un
ds
$4
45
,07
0,3
08
.42
20
18
20
19
20
20
20
21
20
22
Pag
e 5
of
55
11
/16
/201
7 3
:01
:22
PM
UN
OFF
ICIA
L
Page 9
SECTION 1: OPERATIONS, MAINTENANCE & SAFETY
FY2018 TTIP PROJECT INFORMATION SHEET
Page 10
TOTAL $12,500 $0 $0 $0 $0 $12,500
Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $0 $0 $0 $0
Preliminary Engineering $0 $0 $0 $0 $0 $0Planning $12,500 $0 $0 $0 $0 $12,500
Administration $0 $0 $0 $0 $0 $0Activity
Consortium:
Tribal Transportation Program Transportation Improvement ProgramProject Details Listing
DateTribe Navajo NationCurrent FY 2018
(examples: TTP, TTPBP, 2% Planning, HPPP)Funding Source TTPSF;PROJECT INFORMATION:
Project Name Navajo Nation Tribal Transportation Safety Plan
Route Number Project Number
Location Navajo NationType of Work Planning
CountyMilesLength 0Construction YearState
Comments Awarded TTP-Safety FY2013: $12,500. Develop the Navajo Nation Strategic Highway Safety Plan to evaluate safety system performance, assemble advisory team, identify and analyze current processes, establish regional vision and goals for transportation safety, identify emphasis areas and strategies, develop implementation plan, develop performance measures, and establish safety improvement program processes.
TOTAL
Tribe Code N00780
2018 2019 2020 2021 2022
Illustrative List
UNOFFICIAL UNOFFICIAL
Page 6 of 5511/16/2017 3:01:22 PMUNOFFICIAL
TOTAL $206,336 $0 $0 $0 $0 $206,336
Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $0 $0 $0 $0
Preliminary Engineering $0 $0 $0 $0 $0 $0Planning $206,336 $0 $0 $0 $0 $206,336
Administration $0 $0 $0 $0 $0 $0Activity
Consortium:
Tribal Transportation Program Transportation Improvement ProgramProject Details Listing
DateTribe Navajo NationCurrent FY 2018
(examples: TTP, TTPBP, 2% Planning, HPPP)Funding Source TTPSF;PROJECT INFORMATION:
Project Name Highway Safety Education Program
Route Number Project Number
Location Navajo NationType of Work Planning
CountyMilesLength 0Construction YearState
Comments Awarded TTP-Safety FY2013 of $104,004.67 and TTP-Safety FY2014 of $102,331.25. Hired a full time safety technician and temporary employees to provide traffic safety presentations across the Navajo Nation in the areas of DUI awareness, youth alcohol campaigns, distracted driving (no texting and driving), importance of seat belt usage, teen and mature (senior citizen) driving and bike safety. Developed marketing initiatives, tools and monthly advertisements to promote traffic safety initiatives across the Navajo Nation.
TOTAL
Tribe Code N00780
2018 2019 2020 2021 2022
Illustrative List
UNOFFICIAL UNOFFICIAL
Page 18 of 5511/16/2017 3:01:22 PMUNOFFICIAL
Page 11
TOTAL $4,350,000 $4,400,000 $4,400,000 $4,400,000 $4,400,000 $21,950,000
Maintenance $4,350,000 $4,400,000 $4,400,000 $4,400,000 $4,400,000 $21,950,000Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $0 $0 $0 $0
Preliminary Engineering $0 $0 $0 $0 $0 $0Planning $0 $0 $0 $0 $0 $0
Administration $0 $0 $0 $0 $0 $0Activity
Consortium:
Tribal Transportation Program Transportation Improvement ProgramProject Details Listing
DateTribe Navajo NationCurrent FY 2018
(examples: TTP, TTPBP, 2% Planning, HPPP)Funding Source TTP;PROJECT INFORMATION:
Project Name NDOT Maintenance
Route Number Project Number
Location Navajo NationType of Work Maintenance
CountyMilesLength 0Construction YearState
Comments Blading, sand removal, road reconnaisance, snow removal, culvert clean outs, cattleguard clean outs, mowing, washout repairs, roadway debris pickup, emergency traffic control and response.IDC Rate @ 17.18% = $605,300 (Estimated Amount)
TOTAL
Tribe Code N00780
2018 2019 2020 2021 2022
Illustrative List
UNOFFICIAL UNOFFICIAL
Page 20 of 5511/16/2017 3:01:22 PMUNOFFICIAL
TOTAL $300,000 $300,000 $300,000 $300,000 $300,000 $1,500,000
Maintenance $300,000 $300,000 $300,000 $300,000 $300,000 $1,500,000Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $0 $0 $0 $0
Preliminary Engineering $0 $0 $0 $0 $0 $0Planning $0 $0 $0 $0 $0 $0
Administration $0 $0 $0 $0 $0 $0Activity
Consortium:
Tribal Transportation Program Transportation Improvement ProgramProject Details Listing
DateTribe Navajo NationCurrent FY 2018
(examples: TTP, TTPBP, 2% Planning, HPPP)Funding Source TTP;PROJECT INFORMATION:
Project Name Airport Maintenance
Route Number Project Number
Location Navajo NationType of Work Maintenance
CountyMilesLength 0Construction YearState
Comments Snow removal on runways; pavement patching; fence repair; obstruction removal; repainting navigable installments; applying pavement patching to critical sections of the runways/taxiways; repairing and restoring electrical components; repairing and restoring airfield lighting fixtures and bulbs; and airfield mowing, herbicide application, wildlife/livestock removal and foreign object debris removal. IDC Rate @ 17.18% = $43,900 (Estimated Amount)
TOTAL
Tribe Code N00780
2018 2019 2020 2021 2022
Illustrative List
UNOFFICIAL UNOFFICIAL
Page 21 of 5511/16/2017 3:01:22 PMUNOFFICIAL
Page 12
TOTAL $1,200,000 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $6,000,000
Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $0 $0 $0 $0
Preliminary Engineering $0 $0 $0 $0 $0 $0Planning $1,200,000 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $6,000,000
Administration $0 $0 $0 $0 $0 $0Activity
Consortium:
Tribal Transportation Program Transportation Improvement ProgramProject Details Listing
DateTribe Navajo NationCurrent FY 2018
(examples: TTP, TTPBP, 2% Planning, HPPP)Funding Source TTP 2% Planning;PROJECT INFORMATION:
Project Name NDOT 2% Planning Funds
Route Number Project Number
Location Navajo NationType of Work
CountyMilesLength 0Construction YearState
Comments Activities include develop Long Range Transportation Plan, performing annual transportation facilities updates, Tribal Transportation Improvement Program development, conducting public hearing/outreach, and overall transportation planning. IDC Rate @ 17.18% = $216,800 (Estimated Amount)
TOTAL
Tribe Code N00780
2018 2019 2020 2021 2022
Illustrative List
UNOFFICIAL UNOFFICIAL
Page 22 of 5511/16/2017 3:01:22 PMUNOFFICIAL
TOTAL $300,000 $250,000 $0 $0 $0 $550,000
Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $0 $0 $0 $0
Preliminary Engineering $0 $0 $0 $0 $0 $0Planning $300,000 $250,000 $0 $0 $0 $550,000
Administration $0 $0 $0 $0 $0 $0Activity
Consortium:
Tribal Transportation Program Transportation Improvement ProgramProject Details Listing
DateTribe Navajo NationCurrent FY 2018
(examples: TTP, TTPBP, 2% Planning, HPPP)Funding Source TTP;PROJECT INFORMATION:
Project Name Navajo Nation Gravel Pit Development
Route Number Project Number
Location Navajo NationType of Work Planning
CountyMilesLength 0Construction YearState
Comments Planning effort to identify and develop seven (7) gravel pits across the Navajo Nation. This planning study will be the basis for further development of operational gravel pits.
TOTAL
Tribe Code N00780
2018 2019 2020 2021 2022
Illustrative List
UNOFFICIAL UNOFFICIAL
Page 44 of 5511/16/2017 3:01:23 PMUNOFFICIAL
Page 13
TOTAL $720,000 $750,000 $750,000 $750,000 $750,000 $3,720,000
Maintenance $720,000 $750,000 $750,000 $750,000 $750,000 $3,720,000Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $0 $0 $0 $0
Preliminary Engineering $0 $0 $0 $0 $0 $0Planning $0 $0 $0 $0 $0 $0
Administration $0 $0 $0 $0 $0 $0Activity
Consortium:
Tribal Transportation Program Transportation Improvement ProgramProject Details Listing
DateTribe Navajo NationCurrent FY 2018
(examples: TTP, TTPBP, 2% Planning, HPPP)Funding Source TTP;PROJECT INFORMATION:
Project Name NNDOT Safety Projects
Route Number Project Number
Location Navajo NationType of Work Maintenance
CountyMilesLength 0Construction YearState
Comments Navajo Nation wide graveling of Regional Routes and Red Dog Hauling and Placement.
TOTAL
Tribe Code N00780
2018 2019 2020 2021 2022
Illustrative List
UNOFFICIAL UNOFFICIAL
Page 46 of 5511/16/2017 3:01:23 PMUNOFFICIAL
TOTAL $5,200,000 $5,200,000 $5,200,000 $5,200,000 $5,200,000 $26,000,000
Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $0 $0 $0 $0
Preliminary Engineering $0 $0 $0 $0 $0 $0Planning $0 $0 $0 $0 $0 $0
Administration $5,200,000 $5,200,000 $5,200,000 $5,200,000 $5,200,000 $26,000,000Activity
Consortium:
Tribal Transportation Program Transportation Improvement ProgramProject Details Listing
DateTribe Navajo NationCurrent FY 2018
(examples: TTP, TTPBP, 2% Planning, HPPP)Funding Source TTP;PROJECT INFORMATION:
Project Name NDOT
Route Number Project Number
Location Navajo NationType of Work Administration
CountyMilesLength 0Construction YearState
Comments Executive Department, Department of Project Management and Department of Highway Safety.IDC Rate @ 17.18% = $738,300 (Estimated Amount)
TOTAL
Tribe Code N00780
2018 2019 2020 2021 2022
Illustrative List
UNOFFICIAL UNOFFICIAL
Page 47 of 5511/16/2017 3:01:23 PMUNOFFICIAL
Page 14
TOTAL $150,000 $150,000 $150,000 $150,000 $150,000 $750,000
Maintenance $150,000 $150,000 $150,000 $150,000 $150,000 $750,000Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $0 $0 $0 $0
Preliminary Engineering $0 $0 $0 $0 $0 $0Planning $0 $0 $0 $0 $0 $0
Administration $0 $0 $0 $0 $0 $0Activity
Consortium:
Tribal Transportation Program Transportation Improvement ProgramProject Details Listing
DateTribe Navajo NationCurrent FY 2018
(examples: TTP, TTPBP, 2% Planning, HPPP)Funding Source TTP;PROJECT INFORMATION:
Project Name BIA NRDOT Maintenance
Route Number Project Number
Location Navajo NationType of Work Maintenance
CountyMilesLength 0Construction YearState
Comments TTP funds provided to BIA NRDOT for Intergovernmental Agreement with Coconino County to provide road maintenance activities on BIA roads. Activities include blading, road recon, culvert cleanouts and snow removal.
TOTAL
Tribe Code N00780
2018 2019 2020 2021 2022
Illustrative List
UNOFFICIAL UNOFFICIAL
Page 48 of 5511/16/2017 3:01:23 PMUNOFFICIAL
TOTAL $294,407 $0 $0 $0 $0 $294,407
Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $0 $0 $0 $0
Preliminary Engineering $0 $0 $0 $0 $0 $0Planning $0 $0 $0 $0 $0 $0
Administration $294,407 $0 $0 $0 $0 $294,407Activity
Consortium:
Tribal Transportation Program Transportation Improvement ProgramProject Details Listing
DateTribe Navajo NationCurrent FY 2018
(examples: TTP, TTPBP, 2% Planning, HPPP)Funding Source TTPSF;PROJECT INFORMATION:
Project Name Traffic and Criminal Software (TraCs License)
Route Number Project Number
LocationType of Work Administration
CountyMilesLength 0Construction YearState
Comments Awarded TTP-Safety FY2013: $294,406.50. Develop and implement a computerized crash data system in collaboration with the Navajo Nation Division of Public Safety. Due to the size of the Navajo Nation, a pilot project would utilize the funds to purchase needed equipment and data server to assist with the data.
TOTAL
Tribe Code N00780
2018 2019 2020 2021 2022
Illustrative List
UNOFFICIAL UNOFFICIAL
Page 49 of 5511/16/2017 3:01:23 PMUNOFFICIAL
Page 15
SECTION 2: NORTHERN AGENCY FY2018 TTIP PROJECT INFORMATION
SHEET
Page 16
9 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 17
FY 2018 TTIP Project Information Sheet
16 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 18
FY 2018 TTIP Project Information Sheet
26 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 19
FY 2018 TTIP Project Information Sheet
30 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 20
FY 2018 TTIP Project Information Sheet
31 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 21
FY 2018 TTIP Project Information Sheet
45 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 22
FY 2018 TTIP Project Information Sheet
51 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 23
FY 2018 TTIP Project Information Sheet
54 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 24
FY 2018 TTIP Project Information Sheet
SECTION 3: WESTERN AGENCY FY2018 TTIP PROJECT INFORMATION
SHEET
Page 25
11 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 26
FY 2018 TTIP Project Information Sheet
24 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 27
FY 2018 TTIP Project Information Sheet
25 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 28
FY 2018 TTIP Project Information Sheet
28 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 29
FY 2018 TTIP Project Information Sheet
29 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 30
FY 2018 TTIP Project Information Sheet
35 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 31
FY 2018 TTIP Project Information Sheet
37 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 32
FY 2018 TTIP Project Information Sheet
53 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 33
FY 2018 TTIP Project Information Sheet
SECTION 4: EASTERN AGENCY FY2018 TTIP PROJECT INFORMATION
SHEET
Page 34
10 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 35
FY 2018 TTIP Project Information Sheet
12 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 36
FY 2018 TTIP Project Information Sheet
15 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 37
FY 2018 TTIP Project Information Sheet
19 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 38
FY 2018 TTIP Project Information Sheet
27 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 39
FY 2018 TTIP Project Information Sheet
36 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 40
FY 2018 TTIP Project Information Sheet
SECTION 5: CHINLE AGENCY FY2018 TTIP PROJECT INFORMATION
SHEET
Page 41
8 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 42
FY 2018 TTIP Project Information Sheet
17 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 43
FY 2018 TTIP Project Information Sheet
33 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 44
FY 2018 TTIP Project Information Sheet
38 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 45
FY 2018 TTIP Project Information Sheet
41 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 46
FY 2018 TTIP Project Information Sheet
43 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 47
FY 2018 TTIP Project Information Sheet
50 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 48
FY 2018 TTIP Project Information Sheet
55 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 49
FY 2018 TTIP Project Information Sheet
SECTION 6: FORT DEFIANCE AGENCY FY2018 TTIP PROJECT INFORMATION
SHEET
Page 50
7 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 51
FY 2018 TTIP Project Information Sheet
13 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 52
FY 2018 TTIP Project Information Sheet
14 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 53
FY 2018 TTIP Project Information Sheet
23 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 54
FY 2018 TTIP Project Information Sheet
32 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 55
FY 2018 TTIP Project Information Sheet
34 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 56
FY 2018 TTIP Project Information Sheet
37 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 57
FY 2018 TTIP Project Information Sheet
39 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 58
FY 2018 TTIP Project Information Sheet
42 of 55 FY 2018 TTIP Information Sheet | Navajo Division of Transportation Page 59
FY 2018 TTIP Project Information Sheet