fy2010 asis it survey results

Post on 06-Apr-2018

220 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 1/47

 

Survey Results& Analysis

for

 AASHTO 2009 Fall IT Survey (FY2010 IT Survey)

Wednesday, November 04, 2009Pow ered by Vovici EFM

www.vovici.com 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 2/47

 

Executive Summary

This report contains a detailed statistical analysis of  the results to the survey titled AASHTO 2009 

Fall IT Survey. The results analysis includes answers from all respondents who took the survey in 

the 49 day period from Tuesday, September 15, 2009 to Monday, November 02, 2009. 

42 completed responses were received to the survey during this time. 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 3/47

 

Survey Results & Analysis

Survey: AASHTO 2009 Fall IT Survey (FY2010 IT Survey)

 Author: Jan Edwards

Filter: Responses R eceived: 42

1) State or Province: 

Those states and agencies who provided responses are denoted in green.

Alabama  Kentucky  North Dakota Alberta

Alaska  Louisiana  Ohio  British Columbia

Arizona  Maine Oklahoma Manitoba 

Arkansas  Maryland  Oregon  New Brunswick

California Massachusetts Pennsylvania  Newfoundland, LabradorColorado  Michigan  Rhode Island Northwest TerritoriesConnecticut Minnesota  South Carolina Nova Scotia

Delaware  Mississippi South Dakota OntarioD.C. Missouri  Tennessee  Quebec

Florida  Montana  Texas SaskatchewanGeorgia Nebraska  Utah  Other

Hawaii  Nevada Vermont Idaho New Hampshire Virginia 

Illinois  New Jersey  Washington

Indiana  New Mexico  West Virginia 

Iowa  New York  Wisconsin 

Kansas  North Carolina Wyoming  

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 4/47

 

2) Contact Information (Agency Name, Contact Name, and Division must be provideas minimum): 

(Removed for publication)

3) Please identify the following additional key personnel: 

Technical Support Manager 

Tech Support Mgr Telephone  Tech Support Mgr Email Address 

AK  Brian Idzik 

AL 

Princess 

Harper 

334‐260‐

5266  harperp@dot.state.al.us 

AR 

Sidney 

Foggo 

501‐569‐

2260  Sidney.Foggo@arkansashighways.com 

AZ  Tami Price 

(602) 712

7170  TPrice@azdot.gov 

CO 

Marion 

McLellan 

303 757‐

9456  Marion.mclellan@dot.state.co.us 

NC  David Dietz 

919 707‐

2011  DNDietz@ncdot.gov 

DE  Vacant  N/A  N/A 

FL 

Wilson 

Dilmore 

850‐414‐

4292  wilson.dilmore@dot.state.fl.us 

IA 

Barb 

Espeland 

(515) 239‐

1583  Barbara.Espeland@dot.iowa.gov 

IL 

IN 

Mike 

Jenkins 

KS 

Sue 

Swartzman 

785‐296‐

3727  sue.swartzman@ksdot.org 

KY  Jon Clark 

502‐564‐

8900   jon.clark@ky.gov 

LA 

Tyrone 

Carter  Tyrone.Carter@la.gov 

MD  Guy Reihl 

410 787‐

7739  greihl@mdot.state.md.us 

ME  Eric Erskine 

207 624‐

3165  eric.erskine@maine.gov 

MI 

Nathan 

Buckwalter, 

MDIT 

517‐335‐

2407  BuckwalterN@michigan.gov 

MN 

John 

Moreland 

651‐366‐

5646   john.moreland@state.mn.us 

MO  Jack Morris  573522‐2624  Jack.Morris@modot.mo.gov 

MS 

Denise 

Jones  6013597419  dbjones@mdot.state.ms.us 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 5/47

MT  Jeff  Sillick  4064447265   jsillick@mt.gov 

ND 

Diane 

Gunsch  7013284424  dgunsch@nd.gov 

NE  Joe Kellner 

402‐479‐

4650   joe.kellner@nebraska.gov 

NJ  Keith Hill  keith.hill@dot.state.nj.us 

NM 

Louis Garcia

 

505‐827‐

5228 

louis.j.garcia@state.nm.us 

NY  Pat Canaday 

518‐457‐

2800  pcanaday@dot.state.ny.us 

OH 

Aditya 

Singhal  614.466.7007  Aditya.Singhal@dot.state.oh.us 

OR 

Virginia 

Alster 

503‐986‐

3196  virginia.m.alster@odot.state.or.us 

PA 

Mike 

DeMatt 

717‐787‐

3435  mdematt@state.pa.us 

RI 

Greg 

Fraginis  222‐6935  gfraginis@dot.ri.gov 

SC  Lee Foster (803)737

1044  fosterml@scdot.org 

TN 

Dustin 

Heath 

615‐253‐

6408  Dustin.Heath@tn.gov 

TX  Mitch Pope 

512‐465‐

7558  mpope@dot.state.tx.us 

VA  Pam Tauer  pam.tauer@vdot.virginia.gov 

VT 

Jim Wood, 

IT 

Infrastrature 

808‐828‐

2739 

 jim.wood@state.vt.us 

WI 

Bonnie 

Hauke 

608‐266‐

8224  bonnie.hauke@dot.wi.gov 

WV 

Steve 

Kimble  3045589526  steve.b.kimble@wv.gov 

WY  Dave Birge 

307‐777‐

3878  dave.birge@dot.state.wy.us 

Applications Manager 

Applications Mgr Telephone  Applications Mgr Email Address 

AK  Steve Rice 

AL 

Debbie 

Hornsby 

334‐242‐

6885  hornsbyd@dot.state.al.us 

AR 

Lesa 

Frymark 

501‐569‐

2491  Lesa.Frymark@arkansashighways.com 

AZ 

Debra 

Stroops 

(602) 712‐

6723  DStroops@azdot.gov 

CO 

Frank 

Kerstetter 

303 757‐

9482  frank.kerstetter@dot.state.co.us 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 6/47

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 7/47

TX 

Tim 

Jennings 

512‐467‐

3837  tjenning@dot.state.tx.us 

VA 

Ellett 

Pollard  Ellett.Pollard@vdot.virginia.gov 

VT 

Shawn 

Nailor 

802‐828‐

0180  shawn.nailor@state.vt.us 

WI 

Diana 

Longfield 

608‐266‐

2433  diana.longfield@dot.wi.gov 

WV Sush

 

Pakvasa  3045589522  sush.pakvasa@wv.gov 

WY  AJ Myers 

307‐777‐

4130  aj.myers@dot.state.wy.us 

GIS Manager  GIS Mgr 

Telephone  GIS Mgr Email Address AK 

Kerry 

Kirkpatrick 

AL 

Tonya 

Simonton 

334‐260‐

5245 

simontont@dot.state.al.us 

AR 

Raymond 

Leung 

501‐569‐

2554  Raymond.Leung@arkansashighways.com 

AZ 

Debra 

Stroops 

(602) 712‐

6723  DStroops@azdot.gov 

CO 

Tammy 

Lang 

303 757‐

9811  tamela.lang@dot.state.co.us 

NC  John Farley 

919 707‐

2151  FCFarley@ncdot.gov 

DE  Don Burris 

302‐760‐

2629  don.burris@state.de.us 

FL 

Jared 

Causseaux 

850‐245‐

1715   jared.causseaux@dot.state.fl.us 

IA  Eric Abrams 

(515) 239‐

1949  Eric.Abrams@dot.iowa.gov 

IL  Dan Wilcox  2175240031  Dan.Wilcox@illinois.gov 

IN  Joel Bump 

KS  Brian Logan 

785‐296‐

4899  brian.logan@ksdot.org 

KY  Will Holmes 

502‐564‐

8900  will.holmes@ky.gov 

LA  Jim Mitchell  Jim.Mitchell@gov 

MD 

ME 

MI 

Krisanne 

McConnell, 

MDIT 

517‐373‐

7910  McconnellK1@michigan.gov 

MN 

Paul 

Weinberger 

651‐366‐

4121  paul.weinberger@state.mn.us 

MO 

Arnold 

Williams 

573‐751‐

7012  Arnold.Williams@modot.mo.gov 

MS 

Russell 

Cooke  6013597413  rcooke@mdot.state.ms.us 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 8/47

MT  Vacant 

ND  Brian Bieber  7013282649  bbieber@nd.gov 

NE  Rose Braun 

402‐479‐

3696  rose.braun@nebraska.gov 

NJ 

Mark 

Gulbinsky  mark.gublinsky@dot.state.nj.us 

NM 

Don Padilla

 

NY  Kevin Hunt 

518‐457‐

2800  khunt@dot.state.ny.us 

OH 

Dave 

Blackstone 

614‐466‐

2594  Dave.Blackstone@dot.state.oh.us 

OR 

Dave 

Ringeisen 

503‐986‐

4171 

PA 

Frank 

DeSendi 

717‐787‐

3738  fdesendi@state.pa.us 

RI  Steve Kut  222‐6935  skut@dot.ri.gov 

SC 

Todd 

Anderson 

(803)737‐

1383  AndersonRT 

TN 

Kim 

McDonough 

615‐741‐

4037  Kim.McDonough@tn.gov 

TX 

Darryl 

Zercher 

512‐467‐

3782  dzerche@dot.state.tx.ux 

VA  Joe Pugh   joe.pugh@vdot.virginia.gov 

VT  Rick Scott 

802‐828‐

3969  rick.scott@state.vt.us 

WI  Mike 

Gilchrist  608‐

267‐

3276  michael.gilchrist@dot.wi.gov 

WV 

Hussein 

Elkhansa  3045589657  hussein.s.elkhansa@wv.gov 

WY 

Vince 

Garcia 

307‐777‐

4231  vince.garcia@dot.state.wy.us 

Security Manager  Security Mgr 

Telephone  Security Mgr Email Address 

AK 

Pat 

Monagle 

AL 

Ron 

Neslein  334‐242‐6034  nesleinr@dot.state.al.us 

AR 

Ron 

Mitchell  501‐569‐2040  Ron.Mitchell@arkansashighways.com 

AZ 

Thomas 

Branham 

(602) 712‐

6349  TBranham@azdot.gov 

CO 

Thom 

Rivera  303 757‐9586  thomas.rivera@dot.state.co.us 

NC 

Stratton 

Lindley  919 707‐2090  SLindley@ncdot.gov 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 9/47

DE 

Rhonda 

Ringer  302‐760‐2607  Rhonda.Ringer@state.de.us 

FL 

Joseph 

Cipriani  850‐414‐4011   joe.cipriani@dot.state.fl.us 

IA 

Deb 

Covington 

(515) 239‐

1989  Debra.Covington@dot.iowa.gov 

IL 

IN 

Steve 

Swinford 

KS 

Bill 

Kritikos  785‐296‐3727  bill.kritikos@ksdot.org 

KY 

Laura 

Noe  502‐564‐8900  laura.noe@ky.gov 

LA 

John 

Jubin  John.Jubin@la.gov 

MD 

ME 

MI 

Kendra 

Silsby, 

MDIT  517‐241‐0019  SilsbyK@michigan.gov 

MN 

Linda 

Dahlen  651‐366‐4034  linda.dahlen@state.mn.us 

MO 

Victoria 

Harding  573‐522‐1345  Victoria.Harding@modot.mo.gov 

MS 

Denise 

Jones  6013597419  dbjones@mdot.state.ms.us 

MT 

Kristi 

Antosh  4064446294  kantosh@mt.gov 

ND 

Erv 

Zimprich  7013283229  ezimpric@nd.gov 

NE 

Mark 

Neemann  402‐479‐3659  mark.neemann@nebraska.gov 

NJ  N/A 

NM 

eric 

Roybal  505‐827‐5659  eric.roybal@state.nm.us 

NY 

Jim 

Thurley  518‐457‐2800   jthurley@dot.state.ny.us 

OH 

Jack 

Taylor  614.387.0725  Jack.Taylor@dot.state.oh.us 

OR 

Karina 

Stewart  503‐986‐4397 

PA 

Joyce 

Black 

717‐787

‐5575

  joblack@state.pa.us

 

RI 

Ernie 

Quaglieri  462‐9202  equaglieri@dot.ri.gov 

SC 

Kem 

Dempsey 

(803)737‐

1054  dempseyrk@scdot.org 

TN 

Dustin 

Heath 

TX 

Judy B. 

Skeen, 

P.E.  512‐465‐7491   jskeen@dot.state.tx.us 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 10/47

VA 

Jim 

Austin   jim.austin@vdot.virginia.gov 

VT 

WI 

Herb 

britsch  608‐267‐2097  herb.britsch@dot.wi.gov 

WV 

Fred 

Thomas  3045582841  fred.w.thomas@wv.gov 

WY 

Jason 

Miller  307‐777‐3868   jason.miller@dot.state.wy.us 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 11/47

 

4) If the information is readily available, please provide the following high-levelorganizational information for your agency. If development of theinformation requested in this question is too tim e consuming, or you do notknow a particular item, please leave the item blank/ empty. 

Number of  individuals 

within Agency Overall Agency 

Operating Budget ($) 

Number of  Agency IT individuals 

providing application development 

Number of  Agency IT 

individuals providing technical 

support Overall Agency 

IT Operating Budget ($) 

Overall Agency IT 

Capital Budget ($) 

AK  3,738  530,967,900  30  32  17,601,700  650,000 

AL  4300  20 million  100  90  200 thousand 

AR  3593  303,643,393  16  11  6,055,000  2,300,000 

AZ  4800  54  60  9000000 

CO  3,300  $860 million  11  71  $14.5 million  $1,075,000 

DE  2500  $343,875,500  47  48  $8,843,700  $7,788,000 

FL  7426  $6.5B  100  200  $42.5M  $1.7M 

IA  3,489  $332,218,000  67  56  $29,758,000  $4,995,000 

ID  1883  10  20 

IL  5500  50  20  25,000,000 

IN  40 

KS  3113  1547486068  58  37  13000000  3000000 

KY  4500  1.9B  20  25  28M  Multi year 

LA  4700  20  19 

MB  3,500  17  6  $14,000,000.00 

MD 

9,024 

320 

ME  2200  13  13 

MI  2900  $3.6B  75  75  $24M  $4.5M 

MN  5000  2.2 billion  21  200  22 million 

MO  6300  $2.88B  45  45  $20M  $16M 

MS  3500  1.2 billion  20  47  16.2 million  2.1 million 

MT  2250  650000000  30  20  10000000  2000000 

NC  15,000  4B  243  95  65M ‐

ND  1052.5  10  8  17 million  6 million 

NE  2200  693,000,000  20  65  10,600,000  5,100,000 

NJ 

3500 

17 

NM  2700  $800M  20  50  $18M  0 

NY  8000  100  100  30M 

OH  6031  2,878,684,628  41  21  25,330,335  3,000,000 ('sh) 

OR  4500  $1.5b/yr  120  60  $55m 

PA  12,000  > $6B  85  115  Approx $72M  Approx $25M 

RI  700+  8  5 

SC  5000  1000000000  30  15  11000000 

TN  4,500  30  40  33M 

TX  14,710  8.1 billion  617  included  186.2 million  105.8 million 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 12/47

above 

UT  1670  275300000  30  27  9424600  0 

VA  8,000  $3.5 billion  120  25  $70,000  0 

VT  1300  9  30  $2m  $12m 

WI  3500  83  67 

WV  5372  1,522,00,00  20  8  3,600,000  7,200,000 

WY  2000  16  20 

5) Where is control and/ or support of your IT functions located? 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 13/47

 

6) If your agency outsources its IT functions (seat management, development,operations, etc.) to a centralized agency or to an ou tside/ industry company,how successful is the effort? Please provide additional comments (monetarysavings achieved, etc.) if deemed useful. 

Comment Responses: 

I was concerned with the switch to centralized e‐mail but it has been working out well for us. 

Response time much worse on all centralized functions

Functions that we have outsourced are successful; functions we have centralized (from the DOT) are not very 

successful. 

Iowa is studying going to a central e‐mail service model, either from an internal provider or SaaS. 

telephone maintenance 

gets to be very costly 

Still requires knowledgeable in‐house staff  to particpate in planning, upgrades, change management, monitoring, 

etc. 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 14/47

TxDOT has not realized cost savings for outsourced functions. Service has degraded and we have experienced data 

loss, poor server monitoring, delays in restoring services, and increased windows for hardware and software 

procurements and deployments. 

We outsource about 50% of  IT development. 

The state of  Florida is undergoing data center consolidation. Currently at the planning stage. 

High price ‐ low customer service levels 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 15/47

 

7) What key performance indicators (KPI ) does your agency use to gauge ITsupport levels? 

Other Responses: 

Web activity 

Customer satisfaction surveys 

Follow 

Up 

satisfaction 

surveys 

Application development completion time

None. 

customer survey 

Restre time 

Customer satisfaction surveys; 

Satisfaction surveys 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 16/47

 

8) What type of return on investment (ROI) information does your agencyrequire for new IT purchases / projects? 

Other Responses:

Based upon project size and scope

no specific, but ROI is documented

We calculate ROI; not controlling factor

Cost-benefit analysis and life cycle cos

Does project help drive business results

Soft Costs

system specific

ROI, Cost Recovery are'nt equvlnt. terms

generally determine ROI inform user

we use roi as a factor in selecting proj

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 17/47

ROI required for projects over $1M.

No formal reqmt - Prioritize ROI & Value

ROI is dependent on life cycle analysis

We do Cost/Benefit -not particularly ROI 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 18/47

 

9) If your agency requires ROI information, are "soft" costs (time savings inwork producti on, convenience to customer base, e.g.) allow ed in thecalculations? 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 19/47

 

10) Please list the top one or tw o IT application development orimplementation projects your agency plans to undertake in the next 1 - 2years: 

Project 1 Description  Project 2 Description

Implement changes in State Peoplesoft ERP system to 

meet specific DOT requirements 

Right of  Way workflow and document management 

system. 

conprehensive project tracking package  construction management

Rewrite of  Electronic Accident Form and Accident Records 

System 

Implementation of  a workflow solution for our Highway 

Improvement Programming Request form 

DMV Workflow system, contracted out MAT, asset management system as an enterprise 

application 

New state‐wide ERP system.  Migration off  legacy systems. 

New Vehicle

 Registration/titling

 system.

 25M

 project

 3 yr

 

duration, .net,c#, Web Based. 3M contractor. Right of  Way system. Internal, .net, c#, web based. 

Driver License Security Improvements  Wis. Motor Carrier Registration systems 

Bridge Management System Implementation 

On‐Line Bid Submission application. This includes on‐line 

advertising, letting and bid‐tabs publication. 

Statewide Intelligent Transportation System (ITS) 

Management Software (SIMS) Project  – The SIMS project 

provides the Iowa DOT with an integrated, statewide 

Intelligent Transportation Systems (ITS) software solution, 

as part of  an Advanced Traffic Management System 

(ATMS). This

 system

 provides

 remote

 control

 of 

 devices

 

such as cameras, changeable message boards, and 

highway advisory radios for current and planned ITS 

deployments. 

IAPS  –Iowa Automated Permitting System  – IAPS will be a 

web based application that automates the request and 

review process for issuing oversize/overweight permits. 

IAPS will include functionality from our legacy system of  

receiving permit requests via fax and the web, managing 

the issuing permit process, billing and reporting 

capabilities. 

IAPS 

will 

also 

include 

the 

following 

enhancements: automated routing for oversize/overweight 

loads, allow web users to manage their own account data 

and self  issue permits, give all users involved in the 

approval process access to permits that requires their 

review, and expanded billing and reporting features. 

Implement Bid Express.  Rewrite District Bookkeeping System. 

SiteManager Implmentation. Migration from our current 

inhouse developed Construction Management system 

over to the SiteManager application. 

Roadway Inventory 

SAP / Agile Assets implementation  Trns.port CRLMS

Business Intelligence

 system

 Talent

 Management

 Suite

PIMARS‐ Project Information Management and Reporting 

System 

AMMO‐ Accountability in Maintenance Management 

Operations. 

HR Integrated Data ‐‐integrate multiple disparate HR 

applications and databases such that users enter data 

once and can report across multiple data. 

Real Estate Mgmt System ‐‐system to manage Right‐of ‐

Way parcels statewide, using county and MoDOT data, 

giving graphical, map based input/output capabilities 

Business Intelligence  None

Asset Management ‐ comparing Tier I (roads & bridges), 

Tier II, and Tier III to determine best use of  expenditure. 

Travel Information Map ‐ combining multiple layers to one 

centric map. 

Project Delivery and Development Reporting System.  Automated Traffic Management System. Will support 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 20/47

Includes ARRA reporting, for stimulus projects, eventually 

extended to all PennDOT project; also includes project 

delivery metrics, cash flow and business intelligence 

components. 

interconnectivity for all regional Traffic Management 

Centers and ITS devices, which currently operate 

independently and on diverse software and hardware 

infrastructures. 

IT Assest Management 

Data Mart Development ‐ This initiative integrates data 

from several mainframe databases into a user friendly 

format. It gives users the capabality of  running their own 

queries and

 reports.

 

Traveler Service Portal ‐ This initiative will provide a wide 

range of  services to people who commute and simply 

travel through Illinois. 

Implement Web based Transport tools.  Move from MicroStation/V8 to MicroStation/XM.

DMV Technology Modernization  Electronic Toll Collection System Replacement

BI replacement  Web Transport

FINESS ‐ Capital Improvement Financial System (Federal 

Billing) 

GIS Web Framework. Develop a programming framework 

for incorporating mapping and spatial functionality into 

existing MaineDOT applications and to streamline the 

process of  building new mapping applications. 

Enterprise Content Management  Data Integration/Business Data Warehouse 

Enterprise Asset Management  NYS Financial Management System 

HOV tolling. 

Enhancements to Datawarehouse and integrating of  

application systems throughout UDOT. Higher integration 

with other state agencies. 

DMV System Upgrade ‐ Mainframe migration. New Highways Pavement and Maintenance Management 

system. 

continued development of  the Integrated Transportation 

Management System 

continued development of  the Highway Maintenance 

Management System 

Enterprise Financial Management System  Highway Performance Management System 

Data Center Migration ‐ Migrate NJDOT specific hardware 

to the

 Centralized

 State

 IT

 environment.

 

Transportation Management System Data 

Integration/DataWarehouse‐ Integration of  8 

Transportation Management

 Systems

 into

 the

 DataWarehouse 

Transportaion Operation Center, this is consolodating all 

of  our dispatch center software packages into one overall 

integrated system 

Transinfo, this is implementing Exors's asset management 

system into ODOT and allowing us to retire two legacy 

asset management systems. 

Installation of  ITS cameras statewide  GIS points and implementation 

Routebuilder replacement‐ this replace a legacy system 

that provides inter and intra state permitting for over the 

road truckers. 

Program & Project Management System ‐ this will replace a 

legacy system that tracks pre‐construction work tasks. 

TxDOT is participating in a statewide ERP effort led by the 

state comptroller. For more information see 

http://www.texaserp.org/. 

TxDOT has a major initiative underway to increase 

transparancy on department operations to citizens, state 

leadership, legislators,

 and

 other

 stakeholders.

 

Michigan Transport Routing & Internet Permits (MiTRIP) ‐

Application that will provide the department increased 

ability to process and manage oversize/overweight 

transport permits. 

FieldManager Rewrite ‐ Rewrite the application to 

automate the approval process for certain FieldManager 

reports to include the Construction Pay Estimate Report, 

Contract Modification and Contractor Performance. 

National Pollutant Discharge Elimination System (NPDES) 

Inspection Report (MDOT form 1126) in addition to 

significant user suggested enhancements will be included. 

Upgrade of  Oracle E‐business suite financials

REAL ID/PASS ID  Falcon ‐ Document Management implementation state 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 21/47

wide

New Cash Forecasting System  New Intermodal Management System 

Enterprise Content Management  Data Integration, Data Warehousing 

Marine Highway (Ferry) Reservation System Document Management

SiteManager for Materials and Test  Statewide Environmental Management System

 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 22/47

 

11.1) Application Development

 

Comment Responses:

right of way system

Human Resources

Datawarehouse, apps. integration

HPMS Federal Reporting SystemMarine Highway (Ferry) Reservation System

 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 23/47

 

12) Please list the top one or tw o IT infrastructure projects your agency plansto undertake in the next 1 - 2 years. 

Project 1

 Description

 

Project 2

 Description

VOIP  Upgrade server/SAN hardware 

Server Virtualization  Windows & Upgrade

Office 2007  VM, blade technology

New off ‐site disaster recovery site.  Continued build‐out of  our ITS systems.

Continued Virtualization  Disaster recovery

Server Co‐location 

This is now a centraized function, not in DOT's control. This is now a centraized function, not in DOT's 

control. 

Desktop / Application Virtualization ‐ Compare Microsoft's 

desktop virtualization solution as a replacement for Citrix. 

Implement winning solution in a server cloud that will support 

300 thin client desktops and 1500 desktop users. 

WAN 

Optimization 

and 

Upgrade‐

Convert data 

lines 

from Frame Relay and ATM to Ethernet, replacing 

and upgrading older router equipment. Install 

Riverbed WAN optimization devices at all large 

offices statewide. Install client WAN optimization as 

needed. 

Upgrade backbone network to 10 GB Ethernet. Implement virtual servers. 

Server Consolidation  Deployment for the Cleveland/Akron ITS

Server Consolidation  Network Upgrade

Server upgrades  Office 2007 upgrade

Virtualization VMware  Cisco Network Upgrade 

Next Generation Desktop (NGD) ‐upgrade 5200 

Desktops/Laptops to Windows7, Active Directory 2008, SCCM, 

Office 2007 and a first time implementation of  Sharepoint 2007, 

all enterprise‐wide. 

Enterprise‐wide Voice Over IP (VOIP)deployment. 

SAP expansion 

None due to budget situation and IT consolidation 

throughout the Executive Branch. 

VoiP and Windows XP to Windows 7  AVL and camera increasement 

Statewide Connectivity for TMC's. Includes network solution to 

run on Commonwealth network, or build separate; also includes 

video distribution and sharing policies and solution. 

Web Services for Law Enforcement. Will implement 

web service solution to provide driver and vehicle 

information to law enforcement entities; includes 

replacement of  interface to legacy DL and VR 

mainframe systems. 

Mainframe Upgrade  Data Storage Technology Upgrade 

Roadway Weather Information Systems  VOIP

Implement the Primavera software.  Install and Configure updated Engineering Plotters.

Server Consolidation/Virtualization  Computer Room Upgrade 

New Content Management Environment 

Server Migration project ‐ migrate over half  the MeDOT Oracle 

databases into an Oracle RAC environment. 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 24/47

Desktop Operating System Upgrade  Server Virtualization

Consolidation and virtualization of  all servers in the State. Integration of  data, voice, video networks.

Migration to MPLS on statewide network 

continued deployment of  a new statewide network 

infrastructure in conjunction with the new traffic engineering 

system Intelligent Transportation System(cameras,signs,traffic 

counters, centralized traffic controllers, tmcs) 

complete development of  agency Hot Site/ recovery 

site. 

IT Infrastructure

 Transformation

 

Datacenter Migration/Consolidation 

Upgrade network wiring from Category 2 to Category 

5e in a local facility. 

PC Encryption  Windows 7 and Office 2010 

VOIP  Virtualization

Data Center Consolidation 

Texas outsourced server support functions to IBM. In the near 

future, TxDOT's servers will be migrated to two central state 

data centers. The impact on application performance and 

network loads are critical factors that have not been fully 

analyzed or

 addressed.

 

TxDOT is reorganizing central and field support 

functions. Work loads are expected to be distributed 

across virtual teams working in virtual office 

environments. This is expected to place a much 

greater load on TxDOT's WAN and could lead to 

major WAN redesign. 

Michigan/1 Active Directory Office Platform Technology (M/1)‐

Move the department to the consolidated enterprise 

(statewide) environment which will provide new and more 

standardized server and desktop computing as well as 

streamlined training, procurement and support services. 

Systems Access Manager, aka Identity Management 

(SAM/IME)‐ Establish a single/common standard 

identity managemement solution across the entire 

MDOT enterprise to manage user authentication 

and/or user access to all new and existing business 

applications. 

Exchange Server  Enterprise Backup Solution/Disaster Recovery

Moving to virtual environment ‐ XEN server Email replacement ‐ may be centralized at the state 

Statewide E‐mail consolidation  Statewide data center consolidation 

Server Computing

 Virtualization

upgrade servers for database and web services upgrade servers for file and print services

Remote Disaster Recovery site implementation

 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 25/47

 

13.1) Infrastructure 

Comment Responses:

Disaster Recovery 

800 MHz Radio 

Help with Project Tracking.

Facility Upgrade 

security 

SECURITY*** for Project 2 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 26/47

 

14) Does your agency have a need for new application development oracquisit ion in any of the following business areas? 

Other Responses:

Sharepoint implementation across enterprise.

MS Accountability and Transparency Act 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 27/47

 

15) Is your state considering or pursuing application hosting (software as aservice) for critical line of business appli cations?  

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 28/47

 

16) Is your agency facing software procurement restrictions as a result of Section 508 compliance laws and/ or policies? 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 29/47

 

17.1) Database(s) 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 30/47

 

17.2) Database(s) 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 31/47

 

18) Please describe any major changes in database platforms anticipated byyour agency. Also, please include any supported and/ or preferreddatabases omitted from the above question. 

Please describe any major changes in database platforms anticipated by your agency. Also, please include any supported and/or preferred databases omitted from the above question. 

We will be moving our remaining LAN databases from DB2 to SQL. One of  our last moves will be when the TRNSPort 

suite of  products is finally moved to SQL. 

We are working to completely migrate from DB2.

Slow migration to SQL Server since we have pretty well become a MS environment. Oracle will continue to be 

supported. 

Migration off  Filehandler (an in‐house developed DBMS). Migration off  IMS (legacy applications are gorwing 

risk/concern.) 

No changes planned. 

CA‐IDMS installation is being sunset over the next 6 years. No new development on the platform.  _DB2 will be sunset 

in 2 years. 

We support CA Datacom on the mainframe.

Migration from Sybase SQL Server over to Microsoft SQL Server

Increased use of  Microsoft SQL Server, will continue to use DB/2 and Oracle.

Change to Microsoft SQL Server. 

We are moving from IBM AIX server based Oracle DB's to Intel Linux Oracle RAC

No changes planned. 

We still have a number of  legacy IMS databases which we support, but will not further develop. We intend to replace 

these databases with a relational database through planned re‐engineering projects over the next five years. 

None 

None 

adabas/natural for existing mainframe applications

No major change in db strategy: Major systems will use Oracle, all others will use MS SQL Server 

TxDOT's primary mainframe database is ADABAS.

Migrate Oracle to SQL 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 32/47

 

19) When does your agency intend to util ize 64 bit processing for desktops?

 

Comment Responses:

 A few workstations will be put into production before July 2010. All new systems rolledout in FY11 will be 64 bit.

64-bit is being used on CADD desktops only at this point. We have no plans for non-

CADD desktops.

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 33/47

 

20) When does your agency intend to implement W indows 7? 

Comment Responses: 

Consolidated central control. 

A few workstations will be put into production before July 2010. All new systems rolled out in FY11 will be Windows 

7. 

1st qtr 2011 

Desktop OS and office suite upgrades are planned for FY 2011. 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 34/47

 

21) Which server operating systems are being supported by your agency?Which products are preferred by your agency?

Comment Responses:

Central support on unix servers 

VMS 

Windows Server

 2000

‐which

 is

 being

 discontinued

Windows 2000 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 35/47

 

22.1) Production 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 36/47

 

22.2) % of Production Servers Virtualized

 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 37/47

 

22.3) Test/ Development 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 38/47

 

22.4) % of Test/ Development Servers Virtualized

 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 39/47

 

23) What solution are you basing your virtualization strategy on? (check allthat apply) 

Other Responses:

Virtual Iron 

We are evaluating leading solutions. 

AIX LPARS

 (but

 moving

 all

 to

 VMWare

 

Hyper ‐ V 

Citrix 

Citrix Xen Server 

Sun 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 40/47

 

24) What new or emerging technologies do you foresee occurring orimplementing in the near future? 

What new

 or

 emerging

 technologies

 do

 you

 foresee

 occurring

 or

 implementing

 in

 the

 near

 future?

 

Sharepoint or workplace collaboration. 

none 

Tapeless backup, SAN mirroring, Riverbed WAN Optimization, wake on LAN

Cloud computing shows some promise if  concerns can be worked out.

Increased use of  mobile devices for maintenance activities.

1. Click Once 2. Smart Client 3. Model view content (MVC)

Cloud Computing Unified Communications  Sharepoint‐Email integration Mobile applications development

4G Wireless will provide greater opportunities with Video Streaming.

Wider use

 of 

 wireless

 devices

 such

 as

 wireless

 laptops

 and

 Black

‐berries.

Generally speaking, we don't deploy new technologies. We prefer to wait until technologies have been proven, are 

stable, and are less expensive to implement. 

A continued shift from Client/Server to Thin Client WEB. MS Sharepoint.

VoIP, desktop virtualization

Sharepoint Collaboration 

Business Intelligence 

1. Point‐to‐point wireless with ITS. 2. Cellular modems using 4G. 3. Tracking equipment with GPS. 4. Creating models 

to support automated machine guidance. 

Email Archiving 

desktop virtualization; application virtualization

Our hands are tied by our oversight agency standards. Also budget constraints make new technology rather 

unattractive at this time. 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 41/47

 

25) Are you using or considering using web 2.0 social networking technologiesto disseminate information either internally or externally? 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 42/47

 

26) If so, which social network ing technologies are you using? (Choose all thatapply) 

Other Responses: 

Our own online community 

Google is not a SN, but using in prodctn 

SharePoint 

and 

Wiki 

for 

internal 

use 

Flickr 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 43/47

 

28) Are you designing or modifying applications for mobile devices? 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 44/47

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 45/47

 

30) If AASHTOWare w ere developed using LDAP for authentication, wou ld itpresent a problem to your agency?  

Comment Responses: 

Prefer kerberos for authentication 

KYTC uses AD, prefer single signon 

Not 

enough 

room 

to 

comment. 

Would prefer AD, but if  LDAP ties, OK 

Depends on the design and implementation 

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 46/47

8/2/2019 FY2010 ASIS IT Survey Results

http://slidepdf.com/reader/full/fy2010-asis-it-survey-results 47/47

 

32) Please provide any additional information or comments desired; include anyadditional topics/ questions that you would like to see added or changesyou w ould like to see incorporated into this survey.

Please provide any additional information or comments desired; include any additional topics/questions that you would like to see added or changes you would like to see incorporated into this survey. None.. 

Comments for #30: LDAP compatibility will be mandatory for all Iowa applications which have users who log in from 

outside the agency and the preferred method for all users inside the agency. 

N/A 

None. 

NA 

AASHTOWare projects should be awarded through an RFP process to ensure competitive pricing and to eliminate 

vendor complacency.

 

Item#1‐ Question #4 needs to ask about the number of  non‐State staff  (contractors or outsourced) used to augment 

State IT staff  to get a true picture of  IT staffing resources. Also, More and more IT costs are embeded in a centralized 

rate so direct capital costs are very limited and hard to identify. 

Generated: 11/4/2009 12:16:01 PM

top related