INTRODUCTION

Power Link Arabian Co. Ltd. is a leading contracting company involved mainly with civil, electrical and instrumentation projects. The company is dedicated to operate with high safety measure and complies with local and international standards. Power Link Arabian Co. Ltd. is determined to provide supreme engineering design, supply, erection, testing and commissioning of substation.

INTRODUCTION

Power Link Arabian Co. Ltd. offers services with compliments growing range of integrated services that enable us to take any industrial or public works project from concept through planning, financing, design, construction, operations and maintenance. Every element of the firm is structured to ensure that we can leverage our global resources and know-how to satisfy each client’s particular needs.

VENDOR REGISTRATIONS

• SEC V. ID 6235953274 • SAUDI ARAMCO V.ID 10041734

• SABIC VENDOR V.ID 505786 • MARAFIQ

• TASNEE V.ID. 101991 • AL ROWAD

SCOP OF ACTIVITIES

• Layout of Sub-stations • All associated Civil works• Installation of Cable Ladders and trays• Erection of Gantries• Installation of Power transformers• Installation of Switchgear, Control and Protection system,• Installation of GIS type switchgear and Protection system.• Testing & Commissioning. • Laying of XLPE Power Cables for all voltages 11KV, 33KV, and 132KV.• Cable jointing, Indoor & Outdoor terminations.• HV DC Testing of Cables.• Testing & Commissioning.• Installations of Overhead lines, Conductors and Underground Cables.• Installation of Cables for internal Electrification in trenches, ducts, etc.• Installation of MCB , MCCB protection system• DBS & Panels

Main Activities Of The Electrical Contracting Include

SCOP OF ACTIVITIES

• Design survey & Profiling • Networking Solutions• Supply, Installation& configuration of CISCO switches• Supply & Installation of patch panels, media converters etc.• Design, Supply & installation of Fibre Optical Cables• Splicing of Fibre optic cables• Connectorization• Power Meter Testing• OTDR testing• Complete Installation of Automation Equipment• Complete Installation of Field devices

Power Link Hierarchy GENERAL MANAGER

HR & Admin Dept.Sales &

Marketing Dept.Operation Dept

Estimation QA/QC Dept.

Safety Dept.Civil Dept.

Electrical Dept.

Project Eng.Planning

Eng.Protection

Eng.

Site Eng.

Site Supervisor

Technician

Helper

Project Eng.Planning

Eng.

Site Eng.

Site Supervisor

Technician

Helper

Site Manager

Site Eng.

Site Supervisor

Forman

Load man

Project Eng.

DocumentController

Carpenter

SteelFixer

Scaffolder

Painter

Masons

Instrumentation Dept

CIVIL CONSTRUCTION

A combination of flexibility, quality, special skills and adherence to budgets have ensured a pre-eminent position when clients require a single source contractor with capabilities in project development, management, construction services, installation and commissioning.

Power Link Arabian Co. Ltd. is fully capable to perform of handling all kinds of Civil Construction

• Earthwork• Roads• Sidewalks• Curbs • Gutters• Industrial Constructions• Commercial Buildings Constructions

Hierarchy for Civil work

Planning Engineer

Safety Officer Document Control Permit ReceiverBackhoe Project Engineer

Project Manager

Project Supervisor

Foreman

Carpenter

Steel Fixer

Painter

Mason

Tile Fixer

Labor

Dump Truck

Loader

Crane

Bobcat

Boom Truck

Operator & Driver

CLINT: SAUDI ARAMCO (AL-WASEA BULK PLANT)

CUSTOMER : GBN (GULF BUSINESS NETWORK)

INSTALLATION OF EMISSION MONITORING SYSTEMCIVIL/ ELECTRICAL/ INSTRUMENTATION/ FEBRICATION

CLINT: SECCUSTOMER : GBN (GULF BUSINESS NETWORK)

INSTALLATION OF EMISSION MONITORING SYSTEMCIVIL/ELECTRICAL/ INSTRUMENTATION/ FEBRICATION

PICTURES OF CIVIL JOBPICTURES OF CIVIL JOB

CLINT: TASNEE (AL-ROWAD)

Rowad Under Ground Tank

Rowad Under Ground Tank

Rowad Under Ground Tank

Rowad Under Ground Tank

Rowad Under Ground Tank

Rowad Under Ground Tank

CLINT: SABIC (YANBU)

Yansib Yanbu BMS Project

Yansib Yanbu BMS Project

Yansib Yanbu BMS Project

Yansab Yambu BMS Project

CLINT: MARAFIQ SWTP-9SUB-STATION

CUSTOMER : SAUDI E-PHASE

Marafiq SWTP 9 (substation) Project

Marafiq SWTP 9 (substation) Project

Marafiq SWTP 9 (substation) Project

Marafiq SWTP 9 (substation) Project

Marafiq SWTP 9 (substation) Project

Marafiq SWTP 9 (substation) Project

ELECTRICAL & COMMISSIONING - Installation, Testing, Commissioning and Maintenance

We will continue to meet the challenging needs of our clients with our quality services delivered by the most qualified people.

Power Link Arabian Co. Ltd. has successfully accomplished the job of all kinds of Electrical work with the appreciation letter of from our client TASNEE

• Installation, Testing, Commissioning and Maintenance• Underground and overhead distribution network. • Electrification of Buildings and Plant facilities. • Telecommunication works and security alarm system. • Power system, Substation, Switchgears and MCC. • Plant equipment, facilities and controls. • Calibration of System protection and monitoring devices.

Hierarchy for Electrical work

Planning Engineer

Safety Officer Document Control Permit ReceiverProject Engineer

Project Manager

Project Supervisor

Foreman

Electrical Technician

InstrumentTechnician

Helper

Labor

PICTURES OF PICTURES OF ELECTRICAL JOBELECTRICAL JOB

CLINT: TASNEE AL-ROWAD

TASNEE Group Rowad Power Station Project

TASNEE Group Rowad Power Station Project

TASNEE Group Rowad Power Station Project

TASNEE Group Rowad Power Station Project

TASNEE Group Rowad Power Station Project

TASNEE Group Rowad Power Station Project

LETTER OF APPRECATION

CLINT: SAUDI ARAMCOCUSTOMER : ABHASAIN

SYNCHRONIZATION OF THREE EXISTING GENERATORS WITH AUTOMATIC SHIFTING (SUPPLY & INSTALLATION)

Petro Rabic Project

Petro Rabic Project

Petro Rabic Project

MECHANICAL, STEEL STRUCTURE & FEBRICATION

We hope that you will find the enclosed information of benefit in assessing our organization and we look forward to having the opportunity of putting our Mechanical & Fabrication skill to work for you.

Mechanical Works, Steel Structure & Fabrication

• HVAC Design and installations. • Steel Fabrication and Installation. • Fabrication, Installation and Erection of Steel Structure, GSM Towers.

Hierarchy for Civil work

Planning Engineer

Safety Officer Document Control Permit ReceiverBackhoe Project Engineer

Project Manager

Project Supervisor

Foreman

Steel & PipeFabricator

Ducting Fabricator

Welder

Plumber

Pipe Fitter

Erector

Dump Truck

Loader

Crane

Bobcat

Boom Truck

Operator & Driver

TASNEE Group Rowad Power Station Project

TASNEE Group Rowad Power Station Project

PICTURES OF PICTURES OF MECHANICAL, STEEL MECHANICAL, STEEL STRUCTURE STRUCTURE & & FEBRICATION JOBFEBRICATION JOB

CLINT: SAUDI ARAMCOCUSTOMER : JOHNSONS CONTROL

NPOC Project Saudi Aramco

NPOC Project Saudi Aramco

NPOC Project Saudi Aramco

NPOC Project Saudi Aramco

NPOC Project Saudi Aramco

NPOC Project Saudi Aramco

NPOC Project Saudi Aramco

NPOC Project

NPOC Project

INSTRUMENTATION & AUTOMATION

It is the underlying policy of Power Link Arabian Co. Ltd. to develop and train the indigenous labor force and retain this staff within the subsidiary operation, providing Technology Transfer in the specialist areas of Instrumentation & Automation. In this regard we believe that we have been very successful

Instrumentation & Automation Works: • Installation, process equipment / facilities, piping controls, testing &

commissioning Instrumentation devices. • Calibration of Flow control system and supervisory instruments, Tanks /

pipe probers, storage tanks, and gauging devices. • Plant automation for process operation enhancement. • In-house testing commissioning of Plant / refinery instruments.

Hierarchy for Instrumentation & Automation

Planning Engineer

Safety Officer Document Control Permit ReceiverProject Engineer

Project Manager

Project Supervisor

Foreman

Electrical Technician

InstrumentTechnician

Helper

Labor

PICTURES OF PICTURES OF INSTRUMENTATION & INSTRUMENTATION & AUTOMATION JOBAUTOMATION JOB

CLINT: TASNEE AL-ROWAD

POWER MANAGEMENT OF 18 x 1.6 MW POWER STATION WITH SCADA

TASNEE Group Rowad Power Station Project

TASNEE Group Rowad Power Station Project

TASNEE Group Rowad Power Station Project

TASNEE Group Rowad Power Station Project

TASNEE Group Rowad Power Station Project

TASNEE Group Rowad Power Station Project

TASNEE Group Rowad Power Station Project

CLINT: SAUDI ARAMCOCUSTOMER: AL ASWAD

SUPPLY INSTALLATION COMMISIONING OF FUEL MANAGEMENT SYSTEM WITH SCADA AT SAUDI ARAMCO CORPORATE DATA CENTER

Master Control Pannel for Fuel Management at CDC

Master Control Pannel for Fuel Management at CDC

Master Control Pannel for Fuel Management at CDC

CLINT: SABIC – ALBAYRONIEXPANSION PLANT

SUPPLY & INSTALLATION CIVIL MACHINCAL ELECTRICAL

AL-HASA PROJECTSEC - OHTL