EWB-MAP Water Tank Project Construction Progress. June 5-12, 2012. Map of Las Delicias Water System. DOWNHILL. Map of current Las Delicias Water System from ADESCO with approx house locations indicated. 260 Homes Served by Tanque 3. 291 Homes Served by Tanque 1. 33 Homes - PowerPoint PPT Presentation

TRANSCRIPT

EWB-MAP Water Tank ProjectConstruction Progress

June 5-12, 2012

Map of Las Delicias Water System

DOWNHILL

260 Homes Served by Tanque 3

33 Homes Served

by Tanque 2291 Homes Served by Tanque 1

DOWNHILL

Map of current Las Delicias Water System from ADESCO with approx house locations indicated

117 Homes Served by Tanque 3

33 Homes Served

by Tanque 2

154 Homes Served by Tanque 1

Proposed Water Distribution System

280 Homes Served by New Tank

DOWNHILL

Map of Current Water System (section relevant for EWB-MAP modifications)

RED lines – supply lines to tank (uphill by pump)BLUE lines – distributions lines by gravity

DOWNHILL

New 17,000 gallon tank Exisiting

11,000 gallon tank

Proposed update to Water System (section relevant for EWB-MAP modifications)

RED lines – supply lines to tank (uphill by pump)BLUE lines – distributions lines by gravity

NEW

SUP

PLY

LINE

1

NEW DISTRIBUTION LINE 2c

NEW DISTRIBUTION

LINE 2a

NEW

DI

STRI

BUTI

ON

LINE

2bNEW TANK

A

B

C

D

E

F

DOWNHILL

1. Tank Construction2. Pipe connections3. Pipeline Plans4. Distribution of Work

DAY 1 – June 5, 2012

Photos

Day 2 – Wednesday June 6, 9 AM

Day 2 – 3 PM

Day 2 – 3 PMDaniel Rivera

(Engineer from Rotary)

Miguel Delgado (driver/handyman)

from FIAT)

Miguel Martinez(Supervisor)

Holman (driver from

FIAT)

Sergio (LD ADESCO member)

Mario (LD resident)

Day 3 – Thursday June 7, 9 AM

Day 4 – Friday June 10, 11 AM

Day 5 – Saturday June 9, noon

Day 6 – June 11: noon

Day 7 – June 12 noon

Day 7 – 4 PM – ‘mesita’ complete

Schedule for Completion of Tank

1. Wed June 13: start laying rocks/sand for base of foundation

2. Thur June 14: continue laying rocks/sand for base of foundation

3. Fri June 15 – Tue June 19: cut/tie rebar and prepare form for foundation

4. Wed June 20: pour foundation5. Rain could delay these tasks

Photos

Ordered tubing and fittings from local supply store in San Salvador

Proposed update to Water System (section relevant for EWB-MAP modifications)

RED lines – supply lines to tank (uphill by pump)BLUE lines – distributions lines by gravity

NEW

SUP

PLY

LINE

1

NEW DISTRIBUTION LINE 2c

NEW DISTRIBUTION

LINE 2a

NEW

DI

STRI

BUTI

ON

LINE

2bNEW TANK

A

B

C

D

E

F

DOWNHILL

1. Tank Construction2. Pipe connections3. Pipeline Plans4. Distribution of Work

Proposed update to Water System (section relevant for EWB-MAP modifications)

RED lines – supply lines to tank (uphill by pump)BLUE lines – distributions lines by gravity

NEW

SUP

PLY

LINE

1

NEW DISTRIBUTION LINE 2c

NEW

DI

STRI

BUTI

ON

LINE

2bNEW TANK

A

B

C

D

E

F

DOWNHILL

Photos along Pipeline PathArea of Connection to Tubo Madre

NEW

SUP

PLY

LINE

1

NEW

DI

STRI

BUTI

ON

LINE

2b

NEW TANK

A

B

C

D

Photos along Pipeline Path(location of valve box?)

NEW

SUP

PLY

LINE

1

NEW

DI

STRI

BUTI

ON

LINE

2b

NEW TANK

A

B

C

D

Photos along Pipeline Path(location of valve box?)

NEW

SUP

PLY

LINE

1

NEW

DI

STRI

BUTI

ON

LINE

2b

NEW TANK

A

B

C

D

Photos along Pipeline Path

NEW

SUP

PLY

LINE

1

NEW

DI

STRI

BUTI

ON

LINE

2b

NEW TANK

A

B

C

D

Photos along Pipeline Path

NEW

SUP

PLY

LINE

1

NEW

DI

STRI

BUTI

ON

LINE

2b

NEW TANK

A

B

C

D

Photos along Pipeline Path

NEW

SUP

PLY

LINE

1

NEW

DI

STRI

BUTI

ON

LINE

2b

NEW TANK

A

B

C

D

Photos along Pipeline Path

NEW

SUP

PLY

LINE

1

NEW

DI

STRI

BUTI

ON

LINE

2b

NEW TANK

A

B

C

D

Photos along Pipeline Path

NEW

SUP

PLY

LINE

1

NEW

DI

STRI

BUTI

ON

LINE

2b

NEW TANK

A

B

C

D

Photos along Pipeline Path

NEW

SUP

PLY

LINE

1

NEW

DI

STRI

BUTI

ON

LINE

2b

NEW TANK

A

B

C

D

Photos along Pipeline Path

NEW

SUP

PLY

LINE

1

NEW

DI

STRI

BUTI

ON

LINE

2b

NEW TANK

A

B

C

D

Meeting with Mayor to discuss installation of pipeline

• Alcalde (Mayor) Ingeniero Romeo Jose Barillas (alcaldiaopico@yahoo.com, 2331-3001)

• Travelled to Alcaldia (Mayor’s office) with Alfredo Torres (member of LD ADESCO) on Tuesday June 12, 2012)

• Got on waiting list at 8:30 & met with Mayor at 10:45• Requested help digging trench and installing PVC tubing. Alfredo had official letter

from ADESCO• Mayor knew about project (had been contacted by Ana Maria de Keene – honorary

consul of El Salvador in Philadelphia) and agreed to help with everything including supplying the 4” (supply) and 2” (distribution) pipes.

• Questions from mayor:– Is 160 PSI PVC acceptable?– Do you want cemented PVC or rapid connection?– Will send an engineer to evaluate poject.

• Other questions (from RAC)– Location of valve boxes, air bleeds, T’s, cleanouts– Should prepare detailed plan to send to mayor ASAP

Distribution of Work• EWB-MAP

– Overall project management and communication between parties– Updating design verifying that work meets design specs.– Long term planning

• FIAT (Sister Gloria)– Purchase of last minute supplies, order trucks of materials, submission of receipts to

Rotary for reimbursement. Storage of supplies.– Organizing volunteers, hiring one mason

• Las Delicias ADESCO– Organizing community labor (each house volunteers 1 day or pays $6 for another

person to do the work)– Ensuring secure storage of supplies– Communication with Alcaldia

• Daniel Rivera (Rotary San Salvador)– Purchase of supplies (1 week notice): rebar, concrete– Payment of supervisor and mason (hire one mason)– Local project management and oversight of supervisor (Miguel Martinez)

• Alcaldia San Juan Opico– Installation of two lines (4” supply and 2” distribution) of tubing in the same trench

between Calle Principal and Tanks.

Project Expenses (Thru June 11)

TOTALS--> 1,812.70$ 1,543$ 120$ -$ 150$ -$ 1,812.70$ Date Expense Item Amt Qty Total Paid by Detail FIAT CRSS MAP LD Team Total2

1-Jun photocopies 4.70$ 1 4.70$ FIAT for CRSS 5$ 4.70$ 4-Jun tools 196.50$ 1 196.50$ FIAT for CRSS 197$ 196.50$ 6-Jun Rocks (trucks ~6m^3) 145.00$ 2 290.00$ FIAT for CRSS 290$ 290.00$ 7-Jun Arena (sand trucks ~6 m^3) 70.00$ 2 140.00$ FIAT for CRSS 140$ 140.00$ 8-Jun Tierra Blanca (trucks ~6m^3) 70.00$ 2 140.00$ FIAT for CRSS 140$ 140.00$ 9-Jun Cement (bags 42.5 kg) 8.26$ 40 330.50$ FIAT for CRSS 331$ 330.50$ 9-Jun Transportation of materials 40.00$ 1 40.00$ FIAT for CRSS 40$ 40.00$

11-Jun Pipe for tank connections 331.00$ 1 331.00$ FIAT for CRSS 331$ 331.00$

11-JunSupervisor (Miguel) paid daily 6 days/wk 20.00$ 6 120.00$ CRSS 120$ 120.00$

11-Jun Laborers (from LD) paid daily 6.00$ 25 150.00$ LD 150$ 150.00$ 11-Jun Tierra Blanca (trucks ~6m^3) 70.00$ 1 70.00$ FIAT for CRSS 70$ 70.00$

Contacts

• FIAT guest house: 2-226-7610• Miguel Delgado (FIAT driver/helper) cell: 7-

570-8675• Rene (LD President): 7-458-4150• Miguel Martinez (Supervisor on work site): 7-

465-0654• Alcalde (Mayor) Ingeniero Romeo Jose Barillas

(alcaldiaopico@yahoo.com, 2-331-3001)