ESTONIAN RAILWAYS

Container freight volumes 2000 - 2007

25804195 4265 4402

54337025

10531

15500

2000 2001 2002 2003 2004 2005 2006 2007 prog

Container freight volumes 2007

568

1073

681

10751072

1348

1059

1404

967

1425

688

1312

803

1177

831

1104

867

1704

1027

1510

0

200

400

600

800

1000

1200

1400

1600

1800

TE

U

Jan Feb March April May June July Aug Sep Oct

20062007

Container freight volumes by destination countries

Russia42%

Kazakhstan25%

Uzbekistan6%

Kyrgystan7%

To Estonia16%

Other4%

Wagon fleet for container transport

0

200

400

600

800

1000

1200

1400

2002 2003 2004 2005 2006 2007 2008 2009

kaubaveod@evr.eekaubaveod@evr.ee

Tallinn - Moscow

kaubaveod@evr.eekaubaveod@evr.ee

Tallinn - Moscow – Tallinncontainer train

• Since 18 May 2007 Estonian Railways has dispatched 15 fully loaded (90 TEUs in average in a train) container trains to Moscow.

• Loading in Tallinn takes maximum 36 hours, unloading in Moscow ~2 hours.

• Wagons are loaded on trains in both Muuga and Paldiski stations, trains are assembled either in Muuga or Ülemiste station.

• Trains are made up of flat cars, majority of which belong to Estonian Railways.

• Ca 40% of containers returning on a train are empty.• The train cycle from loading to loading is 10 days.• An additional train will be added to this line in December (i.e. in

total 2 trains a week).• 3 trains a week in 2008.• The trains can accommodate also private wagons.

kaubaveod@evr.eekaubaveod@evr.ee

Baltic Transit

Baltic Transit II

• First direct train from Estonia to Kazakhstan was dispatched in October 2007.

• The scheduled time of travelling on Tallinn-Pechory-Iletsk-Almaty line or Tallinn-Pechory/Narva-Tobol-Almaty line is 7 days.

• The train will be initially operating once a week.• In 2008 the train will start making two trips a week.• Future prospect: loading train in Kazakhstan with

containers originating from China.• Baltic Transit container train will continue operating in

parallel.

kaubaveod@evr.eekaubaveod@evr.ee

Baltic Transit II

Rail Baltica / North-South corridor

kaubaveod@evr.eekaubaveod@evr.ee

• Train ferry project involving Estonia and Finland to be launched in cooperation with the Port of Tallinn, Finnish Railways and shipping companies.

• Freight from the Scandinavian countries carried by rail to Ukraine and further on to the countries of the Black Sea region and Central Europe.

• Possible to link it with the Rail Baltica project supported by the EU.

kaubaveod@evr.eekaubaveod@evr.ee

North-South corridor

Container freight volumes 2000 - 2010

2580 4195 4265 4402 5433 702510531

1550020000

30000

45000

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

2000 2001 2002 2003 2004 2005 2006 2007prog

2008 2009 2010

kaubaveod@evr.eekaubaveod@evr.ee

• Prioritise the development of different container train projects, including so-called single-train projects.

• Involve companies from abroad.

• Use the existing wagon pool as efficiently as possible and involve also private wagons.

• Maintain a stable and clear tariff policy and treat all our cooperation partners equally in setting the priorities.

kaubaveod@evr.eekaubaveod@evr.ee

Main principles of the container freight policy of

Estonian Railways

Major goals

kaubaveod@evr.eekaubaveod@evr.ee

Thank you for attention!

www.evr.ee

kaubaveod@evr.eekaubaveod@evr.ee