Essex County Transportation Services Department

Essex County Highways

2014 Construction Program

Peter Bziuk P. Eng.

Manager Construction Services

Essex County Highways

• 2014 Construction Program Highlights– $25,018,00 expenditure level– Includes approx. $2,100,000 from 2013– Rehabilitation Program– Capacity Improvement Program– CWATS Implementation

Rehabilitation Program

• 28 Planned Projects– 5 Bridges ( 2 Construction, 3 Engineering)– 6 Culverts ( 3 Construction, 3 Engineering )– 12 Roads– 5 Maintenance

Capacity Improvement Program

• County is continuing a multi year capacity improvement program for the network

• County funding is being utilized, Senior level funding is being pursued

• 12 Planned Projects for 2014– 6 Construction, 6 Engineering

Essex County Highways• Bridge Projects ($880,000)

– 2 - Structure Rehabilitations:• CR 8 @ Belle River• CR 18 @ Big Creek

– 3 - Engineering for 2015 construction:• CR 2 @ Big Creek• CR 8 @ Silver Creek• CR 11 @ Sucker Creek

Essex County Highways

• Culvert / Drainage ( $1,274,000 )– CR 14 @ Orton Drain culvert replacement

– CR 31 @ Ruscom River culvert replacement

– CR 43 @ Sullivan Creek culvert replacement

– 3 - Culvert Engineering projects for 2015

• CR 34 @ Lebo Creek

• CR 42 @ 6-7 Sideroad Drain

• CR 46 @ Gzowski Drain

Essex County Highways• Road Projects ($4,147,000)

– Recycling/Resurfacing:

• CR 8/ CR 11 - Tecumseh/Essex/Amherstburg

• CR 8/9 – LaSalle/Tecumseh/Amherstburg

• CR 9 - Amherstburg – 0.8 km

• CR 2 - Lakeshore – 2.9 km

• CR 7 - LaSalle – 3.5 km

• CR 13 - Essex – 2.2 km

• CR 14 - Leamington – 3.6 km

• CR 20 - Leamington – 0.9 km

• CR 23 - Essex – 1.4 km

• CR 25 - Lakeshore – 2.5 km

• CR 27 - Lakeshore – 2.3 km

• CR 34 – Kingsville/Leamington – 5.3 km

Essex County Highways• Pavement Preservation ( $571,000 )

– Route and Seal – various locations– Surface Treatment – CR 15 - 5.7 km– Micro Surfacing – CR50 – 6.8 km

• Bridge / Culvert Preservation ($405,000)– Various deck and expansion joint repairs– Various guiderail repairs / upgrades

• Estimated Quantities– 26,790 tonnes of Hot Mix Asphalt– 110,120 sm. of Pavement Recycling– 18,400 tonnes of Granular A

Essex County Highways

• Capacity Projects ( $6,000,000)– CR 23/46 – Intersection Improvements – LS– CR 22 Phase 5 - Contract B – LS– CR 19/22 Improvements - Engineering– Various Connecting Link projects with Towns

• CR 22 – Lakeshore

• CR 6 – LaSalle

• CR 20 – Leamington

Essex County Highways

• EA’s / Engineering in Process:– CR 19 / CR 22 Prelim. Design– CR 42 EA, City limit to CR 25– Lauzon Parkway Extension – MTO/CoW /CoE– Active Transportation System ($52M)

• Annual expenditure @ $1,300,000

Essex County Highways

• Thank you for your interest,• Thank you for your support in delivering

our annual programs,• Looking forward to working safely through

the 2014 construction season.