ENGINEERING ORDER CH LNH K THUT WORKSHEET
1. EO No: EO-2013-3197
REV.
ISSUED DATE: 26 JUN 2013
OTHER REF: AOM 42/72/2011/05 issue 2
2. TITLE :
Engine nacelle oil cooler flaps inspection 13. PLANNING INFORMATION A/C REG./ MSN
WO No.
CARD No.
STATION WP Ref. DEADLINE
COMMENTS:
14. TOOLING AND MATERIALS ITEM P/N DESCRIPTION QTY. GRN
1. 2.
15. WORK RECORD ITEM WORK REQUIREMENT MECH. INSP.
A PROCEDURE
1
FOR LH ENGINE
- Perform DVI OF NACELLES FRONT SECTION CENTER AND REAR OIL COOLER FLAPS I.A.W AMM (JIC) 541261-DVI-10020 (File attached)
- Confirm inspection results:
Nacelles Front Section Center and Rear Oil Cooler Flaps condition Yes No
Is there any cracks and abnormal plays/gaps on Flap (1) external surfaces?
Is there any cracks and abnormal plays/gaps on Flap (1) internal surfaces?
Is there any cracks and abnormal plays/gaps on Flap (2) external surfaces?
Is there any cracks and abnormal plays/gaps on Flap (2) internal surfaces?
Is there any cracks and abnormal plays/gaps on hinge fittings (3)?
Is there missing or loose fasteners, screws, nuts. on hinge fittings (3)?
Is there any cracks and abnormal plays/gaps on hinge fittings (4)?
Is there missing or loose fasteners, screws, nuts. on hinge fittings (4)?
- In case of findings during these inspections, send a detailed damage report showing crack(s) location and dimension with mapping and pictures to Engineering Dept. and go to next step.
Remarks:....
-
VIET NAM AIRLINES ENGINEERING COMPANY FORM 3003
ISS. 02, REV. 02 - DATE: 22 NOV 2012 Page 3 of 4
ENGINEERING ORDER CH LNH K THUT WORKSHEET
1. EO No: EO-2013-3197
REV.
ISSUED DATE: 26 JUN 2013
OTHER REF: AOM 42/72/2011/05 issue 2
2. TITLE :
Engine nacelle oil cooler flaps inspection ITEM WORK REQUIREMENT MECH. INSP.
2
FOR RH ENGINE
- Perform DVI OF NACELLES FRONT SECTION CENTER AND REAR OIL COOLER FLAPS I.A.W AMM (JIC) 541261-DVI-10020 (File attached)
- Confirm inspection results:
Nacelles Front Section Center and Rear Oil Cooler Flaps condition Yes No
Is there any cracks and abnormal plays/gaps on Flap (1) external surfaces?
Is there any cracks and abnormal plays/gaps on Flap (1) internal surfaces?
Is there any cracks and abnormal plays/gaps on Flap (2) external surfaces?
Is there any cracks and abnormal plays/gaps on Flap (2) internal surfaces?
Is there any cracks and abnormal plays/gaps on hinge fittings (3)?
Is there missing or loose fasteners, screws, nuts. on hinge fittings (3)?
Is there any cracks and abnormal plays/gaps on hinge fittings (4)?
Is there missing or loose fasteners, screws, nuts. on hinge fittings (4)?
- In case of findings during these inspections, send a detailed damage report showing crack(s) location and dimension with mapping and pictures to Engineering Dept.
Remarks:
B CLOSE UP
Put aircraft back to serviceable configuration.
-
VIET NAM AIRLINES ENGINEERING COMPANY FORM 3003
ISS. 02, REV. 02 - DATE: 22 NOV 2012 Page 4 of 4
ENGINEERING ORDER CH LNH K THUT WORKSHEET
1. EO No: EO-2013-3197
REV.
ISSUED DATE: 26 JUN 2013
OTHER REF: AOM 42/72/2011/05 issue 2
2. TITLE :
Engine nacelle oil cooler flaps inspection 16. Statement:
The articles identified above were maintained/altered and inspected in accordance with current regulations of the competent Authority and is approved for return to service.
.....................................................................................................................................................................
.....................................................................................................................................................................
17. Approval of competent Authority: FAA approval No. V48Y426B FAA approval No. V48Z426B;
CAAV approval No. VN-268/CAAV ............................................................................
18. Date: .......................... Name: ............................................... Signature / Stamp:
19. TECH. RECORD REQUIREMENT: Record the accomplishment of the AOM 42/72/2011/05 issue 2 into AIRCRAFT LOG BOOK.
Signature/ Stamp:
20. REMARKS/ FINDINGS:
MCC-PLANTypewriter
MCC-PLANTypewriter
-
Job Instruction Card 541261 DVI 10020
CUSTOMER: EFFECTIVITY: ATR 42-500 / ATR 72 DATE: 08/03/13 PAGE 1
DVI OF NACELLES FRONT SECTION CENTER AND REAR OIL COOLER FLAPS
TECHNICAL DATA
ZONING DATA
ZONE: Z 451 Z 461 ACCESS:
PREPARATION
WORK : SKILL MEN MAN-HOURS
ELAPSED TIME :
GSE : 01 ACCESS PLATFORM 01 MAGNIFYING GLASSES 01 LIGHT SOURCE
SPARE : EXPENDABLE :
BULK MATERIAL :
PUBLICATION
-
Job Instruction Card 541261 DVI 10020
CUSTOMER: EFFECTIVITY: ATR 42-500 / ATR 72 DATE: 08/03/13 PAGE 2
TASK DESCRIPTION
001 PREPARATION
1. DISPLAY WARNING NOTICE PROHIBITING THE OPERATION OF ENGINE CONTROLS
2. INSTALL ACCESS PLATFORM AT ENGINE
002 DETAILED VISUAL INSPECTION OF NACELLES FRONT SECTION CENTER AND REAR OIL COOLER FLAPS
REF. FIG. 541261-DVI-00130
CAUTION : THIS INSPECTION IS TO BE DONE ON BOTH SIDES OF FLAPS AND ESPECIALLY IN ARTICULATION AREA.
NOTE : IN ORDER TO CORRECTLY INSPECT INTERNAL ZONES OF FLAPS : - OPERATE FLAPS BY HANDS, - USE MAGNIFYING GLASSES AND ADAPTED LIGHT SOURCE.
1. CAREFULLY INSPECT FLAPS (1) & (2) FOR : - CRACKS AND ABNORMAL PLAYS/GAPS ON EXTERNAL SURFACES. - CRACKS AND ABNORMAL PLAYS/GAPS ON INTERNAL SURFACES.
2. CAREFULLY INSPECT HINGE FITTINGS (3) & (4) FOR : - CRACKS AND ABNORMAL PLAYS/GAPS. - MISSING OR LOOSE FASTENERS, SCREWS, NUTS.
3. CHECK FOR REDUCED GAPS AND FREEDOM OF MOVEMENTS.
003 CLOSE-UP
1. MAKE CERTAIN THAT THE WORKING AREA IS CLEAN AND CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
2. REMOVE ACCESS PLATFORM.
3. REMOVE WARNING NOTICES.
-
Job Instruction Card 541261 DVI 10020
CUSTOMER: EFFECTIVITY: ATR 42-500 / ATR 72 DATE: 08/03/13 PAGE 3
Figure: 541261-DVI-00130 DETAILED VISUAL INSPECTION OF
OIL COOLER CENTER AND REAR FLAPS