Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 1 of 107
EMERGENCY & POLLUTION INCIDENT RESPONSE
MANAGEMENT PLAN FOR SIKA AUSTRALIA PTY LIMITED
55 ELIZABETH STREET, WETHERILL PARK
Authorized by: Operations Manager
__________________________________________
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 2 of 107
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 3 of 107
DOCUMENT STATUS
1. Issue Number: 30.03.15
2. Replaces Issue Date: 23.03.14
3. Reason for Reissue: To make improvements to the existing
Emergency Plan & PIRMP, as well as
address any other additional requirements
that are within the capacity of the
management of SIKA AUSTRALIA PTY
LTD (Wetherill Park)
This document is referenced to
AS 3745 – Emergency Control
organization and procedures for
buildings, structures and workplaces
“Environmental Guidelines: Preparation
of Pollution Incident Response
Management Plans” prepared by NSW
Environment Protection Authority
This document is CONTROLLED and must not be passed on or copied to other persons
without written permission.
DOCUMENT DISTRIBUTION
1 Sika Australia Pty Ltd Management System
2 Fire Brigade, Smithfield
3 Fire Brigade, Bonnyrigg Heights
4 Security
5 Fire Alarm Cabinet (55, Elizabeth Street)
6 Fire Alarm Cabinet (18, Hargraves Place)
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 4 of 107
CURRENT VERSION
Issue
No.
Issue
Date
Approved
By Position Summary of Changes
1 15/01/08 N/A N/A Initial Draft Issue
2 04/02/09 Alexandre
Buckoski
Operations
Manager
Final Approved Version
3 20/03/11 Alexandre
Buckoski
Operations
Manager
Updated to expand
Emergency
4 01/09/12 Miljan
Gutovic
General Manager Addition of Pollution
Incident Response
Management Plan
5 23/03/14 Gajendra
Balabaskara
Site Manager,
NSW
Improvements and
Additions
6 30/03/15 Michael Siely Operations
Manager
Improvements and
Additions
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 5 of 107
CONTENTS PAGE
COVER PAGE ................................................................................................................. 1
DOCUMENT STATUS AND DISTRIBUTION ............................................................... 2
TABLE OF CONTENTS ................................................................................................. 3
LIST OF APPENDICES AND ATTACHMENTS ............................................................ 5
1.0 PURPOSE OF PLAN ........................................................................................... 8
1.1 PIRMP Requirements ................................................................................... 10
2.0 EMERGENCY CONTACTS ............................................................................... 12
2.1 Off-Site Emergency Contacts and Relevant Authorities for Reporting ....... 12
3.0 SITE EMERGENCY RESOURCES ................................................................... 14
3.1 On-Site Emergency Resources ................................................................... 14
3.2 Safety Equipment and Risk Minimising Devices ......................................... 14
3.3 External Site Resources ............................................................................... 15
3.4 Communication Resources .......................................................................... 15
3.5 Radio Protocol .............................................................................................. 16
3.6 Holders of a Full Set of Site Keys ................................................................ 16
4.0 SITE EMERGENCY ORGANISATIONAL STRUCTURE ........................... 17
5.0 GLOSSARY AND ABBREVIATIONS ............................................................... 18
6.0 SCOPE AND DEFINITIONS .............................................................................. 19
6.1 Policy ............................................................................................................. 19
6.2 Definition of an Emergency and Pollution Incident...................................... 19
6.3 Types of Emergencies and Pollution Incidents ........................................... 20
6.4 Summary of Hazards .................................................................................... 34
6.5 Material Safety Data Sheets ........................................................................ 45
7.0 CHEMICALS MANUFACTURED, STORED OR CONSUMED ON SITE ....... 46
7.1 HAZCHEM CODES ................................................................................................. 53
NOTES FOR GUIDANCE ............................................................................................. 54
7.2 Inventory of Other Potential Pollutants ........................................................ 54
8.0 FIRE/EMERGENCY ALARM SYSTEM ............................................................. 55
8.1 Alarm Activation ............................................................................................ 55
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 6 of 107
8.2 Alarm Testing ................................................................................................ 55
8.3 Alarm Deactivation ....................................................................................... 57
9.0 EMERGENCY AND POLLUTION INCIDENT RESPONSE AND CONTROL 58
9.1 Raising the Alarm ......................................................................................... 58
9.2 Emergency Response .................................................................................. 58
9.3 Emergency Control ....................................................................................... 59
9.4 Handover Briefing ......................................................................................... 60
9.5 Traffic Control ............................................................................................... 60
9.6 After Hours Emergency ................................................................................ 61
9.7 Neighbouring Properties .............................................................................. 61
9.8 FIRE ORDER ................................................................................................ 61
FIRE ORDER ..................................................................................... 63
SPILL ORDER ................................................................................... 65
10.0 TERMINATION OF AN EMERGENCY ....................................................... 66
10.1 Internal Alert.................................................................................................. 66
10.2 External Evacuation ...................................................................................... 66
10.3 Recommencing Operations .......................................................................... 66
11.0 NOTIFICATION OF A POLLUTION INCIDENT .................................................. 67
11.1 When to Notify .............................................................................................. 68
11.2 How to Notify ..................................................................................................... 68
11.3 What to Notify ............................................................................................... 69
11.4 Site Contacts................................................................................................. 69
11.5 Communicating with Neighbours and the Local Community ...................... 70
12.0 MEDIA RESPONSE/PUBLIC RELATIONS ............................................... 71
13.0 STATUTORY INVESTIGATION .......................................................................... 72
13.1 Investigation and Written Report ................................................................. 72
14.0 TRAINING, TESTING, AND DEVELOPMENT .................................................... 73
15.0 REVIEW AND REVISION ........................................................................... 75
15.1 Revision ........................................................................................................ 75
15.2 Testing .......................................................................................................... 75
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 7 of 107
16.0 BOMB THREATS ....................................................................................... 78
17.0 APPENDICES ............................................................................................... 80
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 8 of 107
1.0 PURPOSE OF PLAN
This plan has been prepared for the Sika Australia Pty Ltd for the Sites located at 55 Elizabeth
Street, Wetherill Park, NSW 2164 and 18 Hargraves Place, Wetherill Park, NSW 2164. (see
Map Appendix 1). This plan replaces the previous Emergency Plan to include provisions to
address pollution incidents, which is detailed in the Pollution Incident Response Management
Plan (PIRMP).
The Wetherill Park Site includes production plant, warehouses, laboratory and offices (see
Map Appendix 2).
A range of concrete admixtures, liquid colour and resin based products mainly, epoxy resin
products are produced using various chemical raw materials.
In the event of an emergency, or if a pollution incident occurs during an activity carried out on
Site which poses a risk of material harm to the environment, the person carrying out the
activity must immediately implement this plan.
The purpose of the plan is to:
Provide information, and procedures to be followed, in the event of an emergency or
pollution incident involving Site facilities, personnel, the environment, and external
emergency services.
Control and limit any effect that an emergency or pollution incident, including potential
incidents, may have on the Site or neighbouring areas, protecting employment and
save lives.
To facilitate emergency response and to provide ready assistance on the Site
appropriate to the situation,
To ensure timely communication of all vital information of an emergency or a pollution
incident to staff, the Environment Protection Authority (EPA), other relevant authorities
and all other stakeholders affected by the impacts of the incident,
To identify risks relating to the activities on Site and to develop actions to minimise
and manage these risks
To facilitate reorganisation and reconstruction activities so that normal operations can
be resumed, and
To facilitate and advise the necessary training so that a high level of preparedness
can be continually maintained.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 9 of 107
These procedures were formulated to meet the requirements of Australian Standard
AS 3745-2010- Planning for emergencies in facilities.
The principal function of the emergency procedures is to ensure the safety of personnel.
To this end, we seek your cooperation in observing the procedures and in the event of an
emergency, the instructions given by the Wardens.
Whenever these emergencies occur, it is essential that procedures and organisational
arrangements are prepared for the orderly movement of occupants out of the danger area,
to an area of safety.
All building occupants are required to participate in emergency planning and evacuation
exercises and acknowledge the authority of appointed Wardens (Emergency Control
Organisation) in emergency situations.
Instructions given by the Emergency Control Organisation will overrule normal
management structure.
It is also the direct responsibility of SIKA AUSTRALIA PTY LTD’s management to
organise and establish emergency procedures for the safety of their staff based on this
manual.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 10 of 107
1.1 PIRMP REQUIREMENTS
The following table provides the general PIRMP requirements in accordance with the
Protection of the Environment Operations (General) Amendment (Pollution Incident
Response Management Plans) Regulation 2012. The following table specifies the relevant
sections within this document detailing how each requirement has been addressed.
Protection of the Environment Operations (General) Amendment (Pollution
Incident Response Management Plans) Regulation 2012
No. Requirement Pages and Section
Numbers
(a) a description of the hazards to human health or the environment associated with
the activity to which the licence relates (the relevant activity)
Page 36,
Sections 6.3 &
6.4
(b) the likelihood of any such hazards occurring, including details of any conditions or events that could, or would, increase that likelihood.
Page 36,
Sections 6.4
(c) details of the pre-emptive action to be taken to minimise or prevent any risk of harm to human health or the environment arising out of the relevant activity
Page 36,
Sections 6.3,
6.4, 8 and 9
(d) an inventory of potential pollutants on the premises or used in carrying out the relevant activity
Page 46
7 and 7.2
(e) the maximum quantity of any pollutant that is likely to be stored or held at particular locations (including underground tanks) at or on the premises to which the licence relates
Page 47,
Sections 7 and
7.2
(f) a description of the safety equipment or other devices that are used to minimise the risks to human health or the environment and to contain or control a pollution incident
Page 14,
Sections 3.2
(g) the names, positions and 24-hour contact details of those key individuals who: (i) are responsible for activating the plan, and (ii) are authorised to notify relevant authorities under section 148 of the Act, and (iii) are responsible for managing the response to a pollution incident
Page 69,
Section 11.4
and Appendix
10
(h) the contact details of each relevant authority referred to in section 148 of the Act Page 12,
Sections 2, 11
and Appendix
12
(i) details of the mechanisms for providing early warnings and regular updates to the owners and occupiers of premises in the vicinity of the premises to which the licence relates or where the scheduled activity is carried on
Page 70,
Section 11.5
(j) the arrangements for minimising the risk of harm to any persons who are on the premises or who are present where the scheduled activity is being carried on
Page 36,
Section 6.4
(k) a detailed map (or set of maps) showing the location of the premises to which the licence relates, the surrounding area that is likely to be affected by a pollution incident, the location of potential pollutants on the premises and the location of any stormwater drains on the premises
Appendix 1, 2,
3, 4, 5, 6, 7
and 8
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 11 of 107
Protection of the Environment Operations (General) Amendment (Pollution
Incident Response Management Plans) Regulation 2012
(l) a detailed description of how any identified risk of harm to human health will be reduced, including (as a minimum) by means of early warnings, updates and the action to be taken during or immediately after a pollution incident to reduce that risk
Page 36, Page
70, Sections
6.4, 9, 11.5
and Appendix
8
(m) the nature and objectives of any staff training program in relation to the plan Page 73,
Section 14
(n) the dates on which the plan has been tested and the name of the person who carried out the test
Appendix 11
(o) the dates on which the plan is updated Page 3
(p) the manner in which the plan is to be tested and maintained Page 75,
Sections 14
and 15
SIKA AUSTRALIA PTY LTD do not transport waste and therefore requirements for
trackable waste transporters under the same Clause of the Regulation are not deemed
relevant.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 12 of 107
2.0 EMERGENCY CONTACTS
2.1 OFF-SITE EMERGENCY CONTACTS AND RELEVANT AUTHORITIES FOR REPORTING
1. FIRE BRIGADE / 1. Dial 000 on outside line.
AMBULANCE / 2. Ask operator for desired service, either fire, ambulance
or police.
POLICE 3. Wait until you are connected.
4. Say (depending on where alarm was raised):
"I am ringing from the SIKA AUSTRALIA PTY LTD Head
Office and factory at Wetherill Park. The main entrance
is at 55 Elizabeth Street, Wetherill Park. The nearest
cross road is Victoria Street”,
OR,
“I am ringing from the SIKA AUSTRALIA PTY LTD NSW
office and warehouse at Wetherill Park. The entrance is
at 18 Hargraves Place, Wetherill Park. The nearest
cross road is Elizabeth Street”. .
Tell them your name and phone number.
5. Tell them as much as you know of the emergency,
materials involved, quantities, building concerned,
number of people injured.
6. Request the intensive care unit for all unconscious
patients and all severe burns.
7. Make sure the appropriate front gate is open and
someone stays at the gate to direct assistance in and
keep others out.
2. MEDICAL Wetherill Park Occupational Health Practice,
447B, Victoria Street, Wetherill Park, NSW 2164.
Tel: 9756 1344 Fax: 9756 1799
3. HOSPITAL Fairfield District Hospital (02) 9616 8111
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 13 of 107
4. WATER Sydney Water 132 090 (24 hours)
5. POLLUTION Environment Protection Authority – Hot Line
131 555 (24 hours)
6. ELECTRICITY Integral Energy & True Energy 131 003 (24 hours)
7. COUNCIL Fairfield City Council 9725 0222
8. WORKCOVER Work Cover NSW 131 050
9. EMERGENCY SPILL RESPONSE United Transport 0408 963 405
Chemtrans 9792 9400
10. EMERGENCY CLEAN-UP Cleanaway 131 339
SITA 02 9995 5000
11. THE MINISTRY OF HEALTH Camperdown 02 9515 9420
(After hours: 9515 6111 – ask Public Health Officer
on call)
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 14 of 107
3.0 SITE EMERGENCY RESOURCES
3.1 ON-SITE EMERGENCY RESOURCES
The following emergency resources are available on the SIKA AUSTRALIA PTY LTD
Wetherill Park Site:
a) SIKA AUSTRALIA PTY LTD Emergency Control Organisation (ECO) –
(refer Section 4.0)
b) Trained First Aid Personnel – (refer Section 4.0)
c) Emergency Equipment : (refer Appendix 3)
Eye wash stations
Emergency shower stations
First aid boxes
Material Safety Data Sheets
d) Fire fighting equipment: (refer Appendix 4)
11 fire hose reels (2 with foam making kit)
32 fire extinguishers
01 double fire hydrant (with foam making kit)
e) Site drainage system (refer Appendix 5)
f) Site fire detection zones (refer Appendix 6)
g) Site évacuation routes (refer Appendix 7)
3.2 SAFETY EQUIPMENT AND RISK MINIMISING DEVICES
The following contains a list of safety equipment and risk minimising devices on Site,
relevant to its operations and activities:
Stormwater Isolation Valve – located at the south-western portion of the Site, this is
used to isolate any large spills and contamination events when used in combination
with Site bunding and the gradient of the Site. This was recently replaced, which
was on 15 December 2014 and installed by Vincent Developments Pty Ltd.
Personal Protective Equipment (PPE) – these would include a hard hat, hard
gloves, safety shoes and respirators. These are supplied by management to those
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 15 of 107
entering areas where dangerous goods and hazardous chemicals are
manufactured, stored, and consumed.
Spill Stations / Spill Control Bins – these are provided throughout the Site,
especially in areas prone to spills. There are 5 locations in total which are
described in Appendix 5.
Material Safety Data Sheets / Safety Data Sheets (MSDS/SDS) – these are
documentation which provide a comprehensive technical description of each
chemical handled or stored on Site. These are consulted on a routine basis to
determine the appropriate PPE and the necessity for spill stations / spill control
bins.
3.3 EXTERNAL SITE RESOURCES
Orica Emergency Response Service can provide product and safety information as holders of
a set of Sika Australia Pty Ltd Material Safety Data Sheets
ORICA EMERGENCY RESPONSE 1800 033 111 (24 hours)
TRANSPORT COMPANIES WITH EMERGENCY EQUIPMENT
Chemtrans (9792 9400)
United Transport (0408 963 405)
3.4 COMMUNICATION RESOURCES
3 x Mobile Telephones are located:
Site Manager - 0400 357 131
Operations Manager - 0408 875 790
Supply Chain Manager - 0427 554 507
2 x 2-way radios are located:
1 x Chief Warden (Hargraves Place) - (kept on Site at all times)
1 x Floor Warden (Elizabeth St) - (kept on Site at all times)
Mobile phones are not to be used when vapour from a flammable liquid may be
present due to risk of ignition.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 16 of 107
AFTER HOURS
Site is shut down - No need to consider evacuation.
3.5 RADIO PROTOCOL
The 2-way radios held on Site have “common” transmission and receiving frequencies.
This means that communication can only be “one-way” at any time. It is thus necessary to
confirm that the communication has been received and understood by the recipient(s).
The initiator should firstly identify himself and the intended receiver. The message should
then be sent followed by “over” (“end-of-message). The receiver should then identify
himself and acknowledge confirmation.
Example: “This is the Chief Warden from Hargraves Place. Do you receive me
ECO? Over”
“This is the Elizabeth St. ECO receiving. Over”
3.6 HOLDERS OF A FULL SET OF SITE KEYS
Site Manager
Operations Manager
Supply Chain Manager
National Finished Goods Ware House Co-ordinator
Raw Materials Ware House Co-ordinator
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
06
20/03/16
OM
Process Owner: GM ***This is a controlled copy of a controlled document printed 13/05/15*** Page 17 of 107
4.0 SITE EMERGENCY ORGANISATIONAL STRUCTURE
SITE EMERGENCY CONTROL ORGANISATION
CHIEF WARDEN (Colour for identification – white)
DEPUTY CHIEF WARDEN (Colour for identification – white)
COMMUNICATION OFFICER (Colour for identification – white)
FLOOR WARDENS (Colour for identification – yellow)
AREA WARDENS (Colour for identification – yellow)
WARDENS (Colour for identification – red)
FIRST AID PERSONNEL (Colour for identification – green cross on a
white background)
IN THE CASE OF LARGE SCALE EMERGENCIES REQUIRING SITE
EVACUATION, EXTERNAL EMERGENCY SERVICES WILL TAKE OVER
CONTROL AND CO-ORDINATION OF EMERGENCY
FIRE BRIGADE POLICE AMBULANCE
Fire Fighting Ground / Traffic Control Treating injured
Spillage control Evacuation – neighbours Rescue and Transport
Make Safe Investigation
Clean –up Security
Support for Fire Brigade
Co-ordination
NO PERSONNEL ARE TO INTERFERE WITH ANY ASSISTANCE
PROVIDED BY THE CO-ORDINATING SERVICES
Emergency Control Organisation (ECO) will also act as an Emergency Planning
Committee (EPC).
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 18 of 107
5.0 GLOSSARY AND ABBREVIATIONS
MSDS Material Safety Data Sheets
External Emergency Services Fire Brigade, Police, Ambulance
EPC Emergency Planning Committee
ECO Emergency Control Organisation
DG Dangerous Goods
PPE Personal Protective Equipment i.e. gloves, hard
hats, boots, respirators etc.
PEO Police Emergency Operations
CPR Cardiac Pulmonary Resuscitation
IED Improvised Explosive Device
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 19 of 107
6.0 SCOPE AND DEFINITIONS
6.1 POLICY
In all cases of emergency the main objectives in order of priority are:
1 Control or limit any effect that an emergency may have on the Site or on neighbouring
areas, and in particular to minimize the risk, in order of priority, to :
Life
Property
Environment
Product.
2 Ensure a coordinated response to any emergency on the Site and to provide for
appropriate assistance from external emergency services (police, fire brigade and
ambulance).
3 Ensure satisfactory communication of all vital information as soon as possible.
4 Facilitate resumption of normal operations when appropriate.
5 Provide a basis for training personnel in the handling of emergencies, and to provide a
model for plant emergency procedures.
In the case of a pollution incident, the main objectives of the plan are:
1 Ensure comprehensive and timely communication about a pollution incident to staff, the
EPA, other relevant authorities, and the people outside the facility who may be
affected.
2 Minimise and control the risk of a pollution incident at the Site
3 Ensure plan is properly implemented by trained staff, regularly tested and reviewed.
To achieve these objectives, work involving some risk may be required.
6.2 DEFINITION OF AN EMERGENCY AND POLLUTION INCIDENT
Emergency:
Any event that arises internally or from external sources, which may adversely affect
persons or the community generally, and which requires an immediate response.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 20 of 107
Pollution Incident:
An incident or set of circumstances during or as a consequence of which there is or is
likely to be a leak, spill or other escape or deposit of a substance, as a result of which
pollution has occurred, is occurring or is likely to occur. It includes as incident or set
of circumstances in which a substance has been placed or disposed of on premises,
but it does not include an incident or set of circumstances involving only the emission
of any noise.
The three levels of emergency are as follows:
1 LOCAL alert for any situation which threatens life, property or the environment and
cannot be contained by immediate resources. For example, plant operator collapsed in
a closed vessel or fire.
2 SITE alert where other areas of the Site or people, property or the environment outside
the Site may be affected. For example, the contamination of stormwater system on Site
3 EVACUATION alert when all personnel are required to leave the Site and assemble in
a safe location. For example, a bomb threat, or fire.
More information on the types of emergencies which may occur is listed in Section 6.3.
If there is any doubt as to whether any hazardous situation constitutes an emergency,
then it must be treated as an emergency.
6.3 TYPES OF EMERGENCIES AND POLLUTION INCIDENTS
The types of emergencies covered in this manual include:
Fire and Explosion,
Bomb Threat,
Armed Intrusion/Threat/Hold Up,
Building Damage,
Chemical, Biological or Hazardous Substances,
Gas Leak and/or Air Conditioning Contamination
Medical Emergency,
Terrorism,
Personal Harm,
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 21 of 107
Severe Storm,
Loss of Containments – spills,
Poisoning,
Environment/Pollution,
Off-Site Loss of Containments,
Impact Events,
Civil Disturbances, and
Natural Events.
Some examples of the type of emergencies that could occur on or involve the Site, and may
lead to a full scale emergency and evacuation if not controlled/contained, are detailed below
in order of possibility:
Fire and Explosion
In most buildings this may involve liquids or toxic chemicals and combustible materials.
Heat and smoke detectors are installed in the Production Plants and Warehouses and
smoke detectors are installed in all offices, and labs, with a direct link to the local alarm
systems. All areas are bund for containment of chemicals, and provided with
appropriate first response, fire fighting equipment. This type of emergency may require
the evacuation of neighbours. Contact may be made at the direction of the Chief
Warden.
Instruction to neighbours before External Emergency Services arrive could be to;
* Turn off air-conditioners
* Commence their procedures
Note: the police have responsibility to control external roadways, pedestrians and
vehicles.
Bomb Threat
All available information must be collated and threats should be categorised as either
specific or non specific threat. This will assist in deciding what further actions have to be
taken.
Specific – least common but more credible. The caller provides detail that may
describe the device, its placement, the reason, its time of activation, etc.
Non Specific – little detail before the call is terminated.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 22 of 107
Neither threat should be discounted and decisions now have to be made by an assessing
team.
When a bomb threat is received the General Manager/Operation Manager and ECO
Team, including the Chief Warden, should be notified.
The following four options are available:
1. Take no further action but inform Police
2. Search without evacuation but inform Police
3. Evacuate and Search but inform Police
4. Evacuate (without search) inform Police
The notification of Police is not optional, in the event of taking no further action, reporting
is required as a threat is a crime and as such has to be reported.
The appropriate response will depend on the level of the perceived risk. In determining
the perceived risk, the following issues should be considered:
The nature or type of caller – Was there any Site specific knowledge demonstrated by
the caller? Was it seemingly premeditated by the caller? (i.e. Scripted threat, or
recorded voice) This may increase the level of perceived risk. Was it a Child's voice or
were there people giggling in the background? If there are factors which suggest the
call is less genuine, this will lessen the perceived risk.
The frequency of the threats being received. If threats are received on a more frequent
basis, the level of perceived risk will be reduced.
Timing of the threat. If the threat is received during school holidays or April Fool's day
the perceived risk will be less. However, if the threat is received during periods of
increased building occupancy or a Site-specific function, the perceived risk may be
elevated.
Is it possible that the call is a Copy-Cat call? If there have been media reports recently
this may lead to an increase in frequency of false threats and hence would reduce the
perceived risk.
Will immediate evacuation of the building expose people to greater danger? If you
believe the location of the bomb/threat is in building vicinity, occupants may be safer
remaining in the building.
What is the size of the building and how many people are involved? Where there are
fewer people it may be more appropriate to consider evacuation even where the
perceived risk is low. However, where there are many people involved and there is a
lower perceived risk (i.e. telephone call without a suspicious package) a full building
evacuation may not be warranted as the costs associated with evacuating a large
number of people would be considered excessive considered the risk.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 23 of 107
It is the responsibility of the ECO team to consider the risk and determine which of the
four options is the most appropriate action.
Before an unattended item is deemed suspicious the following questions must be asked
by the Chief Warden.
H – Is the item HIDDEN?
O – Is the item OBVIOUSLY suspicious?
T – Is the item TYPICAL of items usually found in that area?
If the finder of a suspicious package is still unsure the following questions in conjunction
with HOT should be asked:
U - Is there evidence or reports of UNAUTHORISED access or activity?
P – Is there PUBLIC access to the area?
Communications during Search
A rapid two-way communication system is of utmost importance. Normally
communications between search teams and the Chief Warden can be accomplished
through the existing telephone system, or building intercommunications system.
Caution: The use of radios or mobile phones could prove dangerous. The transmission
could cause premature detonation of an electric initiator (blasting cap). Do not transmit
within 25m of a suspect item or farther if possible.
The Chief Warden will make the decision on the use of radio communication whilst the
search is in progress, based upon the level of credibility or the nature of the threat.
If a Suspect Object is Found
DO NOT TOUCH, TILT OR TAMPER WITH THE DEVICE
The Floor Warden for that floor will:
1. Advise the Chief Warden.
2. Proceed to evacuate the floor.
The Chief Warden will:
1. Advise Police and Fire Brigade.
2. Advise the Floor Wardens concerned to evacuate two floors above and one floor
below the "suspect" floor.
3. Alert the Ambulance service.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 24 of 107
If a written threat is received:
1. Immediately notify the Chief Warden or Security.
2. Place the threat document in a plastic envelop or transparent folder to preserve
condition and prevent contamination.
3. Do Not photocopy.
4. Surrender document to Chief Warden.
Bomb Threat Evacuation
Proceed with evacuation procedures keeping in mind the following:
Route of evacuation may need to be changed to avoid a suspect object. Wardens
should be advised of a suspect object’s location prior to evacuation.
As a minimum, evacuation routes, Assembly Areas and areas of access to the general
public must be searched prior to any evacuation.
Occupants should be requested to take personal belongings such as handbags,
briefcases, shopping bags etc when evacuating.
Doors and windows should be kept open, to lessen the impact from an explosion.
Evacuation should be initiated no later than 30 minutes prior to any deadline.
Persons should not assemble in any location that is in line of sight to the possible
danger area.
An alternative Assembly Area should be considered
Building re-entry should only be considered after a thorough search has been
conducted and after consultation with Police, Security and Management.
Car Park
During a bomb threat, a search may be undertaken. If a device is found in the car park or
a threat indicates a device has been left in the car park, the Chief Warden should:
1. Ensure Police are notified and Ambulance if required.
2. Ensure vehicle and pedestrian access is restricted to the responding Emergency
Service.
3. If necessary, commence evacuation of the Site.
4. Until advised by appropriate Emergency Service, no vehicle or persons can re-
enter the car park.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 25 of 107
Note: In a bomb threat situation, DO NOT use two-way radios.
Reception Operator Instructions
1. Do not panic.
2. Keep the caller on the line as long as possible and record the person's comments
word by word.
3. Ask questions listed on the Bomb Threat Checklist (Appendix 8).
4. Listen carefully for background noises, speech mannerisms, accent, etc. which
might give a clue to the age, sex and location of the caller.
5. Fill out bomb threat checklist immediately in private, away from distractions.
Workplace Intrusion/Threat/Holdup
Managers should ensure cash and valuables are secured and kept to a minimum
workable level. Employees who may be subject to such an incident should be given
instructions to ensure their safety.
If you are confronted by an armed intruder:
1. Obey their instructions
2. Try and remain calm
3. Do not take any action to excite the intruder
4. Hand over cash/valuables on request
Try to make a mental note of the description, clothing, speech, scars or other markings.
DO NOT GIVE CHASE
When the Intruder Departs:
Advise Police, give details of robbery.
Name Your Name
Address 55 Elizabeth Street Wetherill Park
Upon the departure of the offender
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 26 of 107
Try to make a mental note of the description, clothing, speech, scars or other markings
Contact the Police and Security
Fill out the incident/offender check list
Do not discuss details of the incident with others, as police need statements of what
you saw/did.
If you have a description of car or direction of the intruders travel, advise Police and
Manager.
Sometimes the intruder may use a weapon, which might include a gun. In the following
example, we will use a gun, but the procedure could apply to any weapon.
In the event of a wounding:
1. As soon as Management is aware of an injury, an ambulance should be called.
Ambulance Headquarters should be made aware that a shooting has occurred. A
suitable place for a member of staff to meet the ambulance should be arranged.
2. The Police should be notified immediately that the shooting or suspected shooting
has taken place.
UNDER NO CIRCUMSTANCES SHOULD ANYONE CONFRONT THE AGGRESSOR.
Chemical & Hazardous Substances
Sika Australia Pty Ltd uses a wide range of chemical substances ranging from safe, non-toxic
mixtures through to highly toxic and very unstable substances, which could, if leaked, cause
disruption and injury.
All chemicals should be recorded and Material Safety Data Sheets (MSDS) held for all
substances. Supporting this, the labelling, handling, storage, transport and use of chemical is
adequate and compliant with industry standards
If a chemical leak occurs, the Chief Warden should:
1. Proceed immediately to scene of leak without placing themselves at risk.
2. Establish scope of emergency and whether safe containment will be speedily
achieved. If in doubt, commence evacuation. In the case of noxious odour, air
borne contaminates, shut down air conditioning and seal area of origin if
necessary.
3. Notify Emergency Service and ensure Fire Brigade are notified and ambulance if
required. If material harm to the environment is caused or threatened, notify
relevant authorities by following Section 11.0 Notification of a Pollution Incident.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 27 of 107
4. Ensure injured are removed to a place of safety and no one is exposed to further
risk of injury.
5. Notify all Wardens of situation.
6. If necessary, instruct Wardens to implement evacuation.
7. Ensure injured are removed to a place of safety and no one is exposed to further
risk of injury.
8. Notify Wardens of situation.
9. If necessary, instruct Wardens to implement evacuation.
Chemical Hazard consideration
Call Emergency Services.
Have MSDS’s located close to the source for quick reference.
Hold your breath and move away from Site as quickly as possible.
Set up communication channel for any person who needs to be isolated.
Ensure all people who may have been exposed receives medical attention.
Move upwind.
Building ventilation system shutdown, turn off fans.
Cover face with cloth.
Remove outer clothing and immediately wash skin with cold water.
Isolate the scene.
Prevent entry from unauthorised people.
Seek medical assistance immediately if you feel nauseous, dizziness etc.
Do not attempt to clean up the spill or confine the leak until the MSDS is at hand. You
must be appropriately trained and have the correct Personal Protective Equipment
(PPE).
Where the substance is considered flammable, isolate nearby ignition sources.
Shelter in place or evacuate upwind.
Commence immediate evacuation if complaints of illness, discomfort, irritation or
excessive odour.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 28 of 107
Arrange supplier to assist in the decontamination of the Site and ensure no residual
contamination is evident.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 29 of 107
Medical Emergency
The possibility of a medical emergency has to be considered during the course of a normal
working day.
Although not directly related to the operation of the building, management and staff must be
prepared to take appropriate steps to assist the ill or injured.
If any person is made aware of a medical emergency, they should:
1. Dial 000 and advise Ambulance of details of the injured person, give:
Name Your Name
Address 55 Elizabeth Street Wetherill Park
2. Dispatch a trained First Aid Officer to the scene, if available.
3. Based on their training, the First Aid Officer should render assistance to the injured
and make them comfortable.
4. If the injury has resulted from a fall, DO NOT move the person and where possible
do not leave them unattended.
5. Have a Warden meet responding ambulance
6. The First Aid Officer will remain with the injured person until despatched from the
Site by the ambulance or such other time as deemed necessary.
7. Advise next of kin with the details of the injury if serious
8. After the incident complete an Incident report.
Terrorism
On becoming aware of a terrorism threat the Chief Warden will:
1. Immediately notify Police. Terrorism Hotline Number 1800 123 400
2. Await instruction from Police
Considerations:
Next of Kin and family communication needs to be managed
Attracts large interest from media and the public. Emergency Services may instate
temporary medical centres and media areas. Assist as required
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 30 of 107
Secure occupants away from the incident area
Arrange for contractors to assist in assessing building damage and functionality when
and only if safe to do so.
Severe Storm
1. On notification of impending cyclone or severe storm, ensure all loose items are
secured
2. Close all windows, curtains, blinds and external doors
3. Move computers and valuables away from windows or items that may fall
4. Turn off electrical appliances
5. Lightning strikes may cause power failure which will affect services such as lighting,
lifts, heating or air conditioning, ventilation and building fire systems
6. Seek shelter under tables or desks and away from items such as bookcases and
other furniture that may fall or slide.
7. If outdoors, move to an open space away from trees, power lines.
8. Refrain from using the telephone immediately unless for serious injury.
9. Restrict the use of vehicles and use only where necessary.
Water Leaks or Flooding
Floods caused by domestic systems usually do not endanger people but can cause extensive
damage to buildings and equipment. Floods caused by the overflow of stormwater drains,
creeks, rivers and streams are extremely dangerous and may require evacuation of buildings.
If water leaks or flooding occurs:
Turn off water at source if possible.
If possible, isolate electrical sources (if known).
If available and considered useful, local spill kits should be used to restrict the flow
of water.
If material harm to the environment is caused or threatened, notify relevant
authorities by following Section 11.0 Notification of a Pollution Incident.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 31 of 107
Consider evacuation.
Don’t move people from safety to danger. Flood waters are unsafe and evacuees
should not walk through water.
Building Damage
Generally, buildings in Australia can withstand a certain amount of damage without placing
their occupants at risk. Recent experience however, has shown that although rare, there is a
remote possibility of building failure due to unexpected forces such as earthquake. Other
possible causes of failure may be explosion, internal failure and collision.
When Damage Occurs:
1. Take immediate refuge under desk or benches, under door frames, archways etc.
2. Stay clear of racking, filing cabinets, shelves and bookcases etc.
3. Maintain refuge until structural safety checks are completed.
4. DO NOT SMOKE, USE MATCHES OR LIGHTERS.
Loss of Containment - Spills
An escape of a significant quantity of any chemical from its container would result in an
emergency situation or damage to the environment. The locations of 5 spill control
bins are shown in Appendix 5.
The effects of spillages vary widely and depend on the quantity and material involved.
The Site is fully bund in all warehouses and plants.
Immediate reference must be made to relevant Material Safety Data Sheets for
the appropriate management of any spill together with any PPE required.
If material harm to the environment is caused or threatened, notify relevant
authorities by following Section 11.0 Notification of a Pollution Incident.
Poisoning
The effects of poisoning vary widely and depend on the quantity, method of contact
and chemicals involved.
Any potential for direct contact with any chemical must be avoided as poisoning can
occur when:
inhaled - by breathing in
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 32 of 107
absorbed - by skin and eye contact
ingested - via the mouth
Immediate reference must be made to relevant Material Safety Data Sheets for the
appropriate management of any poisoning.
Environment / Pollution
Any potential for pollution of the environment on or off Site, must be avoided. This
includes discharges to atmosphere from the plant or warehouse and care must be
taken to see no spillages occur that could discharge to stormwater systems. If a
pollution incident occurs, this plan must be activated and appropriate steps are to be
taken. Relevant authorities must be notified by following Section 11.0 Notification of a
Pollution Incident or the Notification of a Pollution Incident Procedure in Appendix 12.
Reference may be made to relevant Material Safety Data Sheets for the appropriate
management of any spill together with any PPE required.
Off Site Loss of containment
a) Roadways
In the case of emergency involving transport vehicles carrying Sika Australia Pty Ltd’s
products (including dangerous goods) on:-
Roadways surrounding the Site
The Chief Warden may:
Direct any actions required i.e. immediate implementation of spill procedures using
available equipment and trained personnel.
If material harm to the environment is caused or threatened, notify relevant
authorities by following Section 11.0 Notification of a Pollution Incident.
Arrange contact with external Emergency Services and the transport company
involved.
Contact the ECO (Emergency Control Organisation)
Contact an external clean up contractor i.e. Cleanaway, QRX for support.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 33 of 107
Roadways in the metropolitan area
If contacted to assist, the Chief Warden may:
Provide information to the Authorities as required (such as information regarding
spillage control from MSDS’s on Sika Australia Pty Ltd’s products)
Make arrangements with an external transport company with emergency response
capability and equipment e.g. Cleanaway, QRX Transport
Make arrangements with an external clean up contractor i.e. Cleanaway, QRX
Transport
b) Off-Site Storage
If contacted to assist, the Chief Warden may:
Provide information as required (possibly information regarding spillage control
from MSDS’s on Sika Australia Pty Ltd’s products)
Make arrangements with an external resource with emergency response capability
and equipment e.g. QRX Transport (07) 3830 4175
Make arrangements with an external clean up contractor i.e. Cleanaway, QRX
Transport
c) Neighbours
In the case of emergency conditions on neighbouring factories and warehouses, i.e.
fire, adjoining Site buildings may require action by this Site's personnel for their own
protection and exposure.
The Chief Warden may direct any action required to;
Monitor wind direction, via his/her own interpretation to avoid exposure to
smoke and toxic fumes;
Monitor Site personnel for any health effects i.e. coughing, dizziness; and
Turn off air-conditioners and evacuate Site staff upwind.
Impact Events
Road vehicles and aircraft do present a possibility of impact with plant or storage facilities.
Large road vehicles at times may move inside Site buildings (particularly in the production
area). Aircraft from Pinkenba Airport periodically fly over the Pinkenba Site.
Emergency situations caused by impact of road vehicles or aircraft are likely to be similar to
those emergency types described previously i.e. fire, explosion or spillage. Such events will
be random occurrences totally unexpected and possibly disastrous. Normal plant emergency
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 34 of 107
procedures will be used, ensuring that all emergency services and the Pinkenba Site are
alerted immediately.
If material harm to the environment is caused or threatened, notify relevant authorities by
following Section 11.0 Notification of a Pollution Incident.
Civil Disturbances
Demonstrations, riots and bomb threats may result in emergency situations. Specific
procedures for dealing with bomb threats are given on in Section 15.
Because civil disturbances such as public demonstrations may become violent and result in
employee injury or property damage, it is important that Police be called immediately to control
the behaviour of demonstrators.
Natural Events
No attempt is made in this plan to specifically deal with natural events such as flood, bush fire,
earthquake, tidal wave or similar situations. General civil emergency procedures will be used
to manage such events in the remote circumstance of their occurrence at the Pinkenba Site.
6.4 SUMMARY OF HAZARDS
The risk of main hazards to human health or the environment have been assessed and
summarised in the table below. This table includes the description and likelihood of the
possible hazards, the circumstances or initiating event that could cause or increase the
likelihood of the incident occurring, and the pre-emptive actions or prevention measures
in place to minimise or prevent the risk of these hazards from occurring.
Likelihood (Frequency) is classified into the 5 x categories:
A - Almost certain Is expected to occur in most circumstances
B - Frequent Will probably occur in most circumstances
C - Occasional Could occur
D - Infrequent Could occur but not expected
E - Remote Occurs only in exceptional circumstances
Consequence is classified into the 5 x categories:
I - Catastrophic Off Site release – large detrimental impact
II - Major Off Site release – contained with outside assistance
III - Moderate On-Site release – contained with outside assistance
IV - Minor On-Site release – immediately contained
V - Negligible Negligible environmental impact
The following matrix provides the Risk Matrix adopted by the Site, to provide a method of
risk ranking incidents using a combination of likelihood and consequence categories
described above.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 35 of 107
Table 6.4.1: Risk Matrix for SIKA AUSTRALIA PTY LTD
Almost certain H H E E E
Frequent M H H E E
Occasional L M H E E
Infrequent L L M H E
Remote L L M H H
Negligible Minor Moderate Major Catastrophic
Code : E - Extreme
H - High
M - Moderate
L - Low
Upon examination of the Site, its operations and the nature of dangerous goods and
hazardous chemicals stored on Site, the following table was formulated which provides a
credible list of hazards expected on Site.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 36 of 107
Table 6.4.2: List of Pollution Incident Hazards – SIKA AUSTRALIA PTY LTDAUSTRALIA PTY LTDAustralia (Wetherill Park)
Functional/
Operational Area
Possible
Hazards/Consequences
Possible Initiating
Event
Consequenc
e
Likelihoo
d
Risk
Impac
t
Pre-emptive Actions and
Prevention/Protection Measures
Admixture Plant Production Area
1. Spill of material. 2. Material escapes to bund
1. Vessel failure. 2. Pipe or valve failure. 3. Vessel overfilled
during product transfer.
IV C M 1. Only experienced operators trained in safe operating procedures will be allowed to work in this area.
2. Admixture Plant Production Area is adequately bunded.
3. Secondary containment area designed to collect spillages from ‘apron’ area.
4. The Site stormwater system is fitted with a stormwater isolation valve, which will be closed in the event of an emergency.
5. Spill control equipment is provided near the Admixture Production Area. Employees are in regular attendance to implement spill control procedures
1. Spill of material. 2. Spilled material escapes
bund and pollutes stormwater
1. Vessel failure. 2. Pipe or valve failure. 3. Vessel overfilled
during product transfer.
4. Bund failure
II E H 1. Only experienced operators trained in safe operating procedures will be allowed to work in this area.
2. Admixture Plant Production Area is adequately bunded.
3. Secondary containment area designed to collect spillages from ‘apron’ area.
4. The Site stormwater system is fitted with a stormwater isolation valve, which will be closed in the event of an emergency.
5. Spill control equipment is provided near the Admixture Production Area.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 37 of 107
Functional/
Operational Area
Possible
Hazards/Consequences
Possible Initiating
Event
Consequenc
e
Likelihoo
d
Risk
Impac
t
Pre-emptive Actions and
Prevention/Protection Measures
Employees are in regular attendance to implement spill control procedures
1. Spilled material forms a vapour.
2. Material finds an ignition source resulting in a fire.
3. Full-scale fire develops involving production and storage vessels.
4. Fire causing air pollution 5. Fire fighting water causing
stormwater pollution
1. Vessel failure. 2. Pipe or valve failure. 3. Vessel overfilled
during product transfer.
II D H 1. Strict control of ignition sources including a hot work permit system will operate. No smoking will be permitted in the Plant / Warehouse Area.
2. Fire services are located near the Admixture Plant Production Area.
3. The Site stormwater system is fitted with a stormwater isolation valve, which will be closed in the event of an emergency.
1. Dust emissions causing air pollution
1. Abnormal operation at Admixture production
III D M 1. Wet scrubber installed to handle dust & vapours.
2. The scrubber would be regularly inspected and be part of the Site’s preventative maintenance program.
1. Vapour impacts on employees’ personal health and safety.
1. Vessel failure. 2. Pipe or valve failure. 3. Vessel overfilled
during product transfer.
III D M 1. Fire services are located near the Admixture Plant Production Area
2. Wet scrubber installed to handle dust & vapours.
1. Emissions impact on employees’ personal health and safety
1. Scrubber fails to operate correctly.
III D M 1. The scrubber would be regularly inspected and be part of the Site’s preventative maintenance program.
2. Personal protective equipment to be worn to minimize exposure
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 38 of 107
Functional/
Operational Area
Possible
Hazards/Consequences
Possible Initiating
Event
Consequenc
e
Likelihoo
d
Risk
Impac
t
Pre-emptive Actions and
Prevention/Protection Measures
Viscocrete Plant 1. H2S emissions causing air pollution
2. Emissions impact on employees’ personal health and safety
1. Scrubber fails to operate correctly.
II E H 1. The scrubber would be regularly inspected and be part of the Site’s preventative maintenance program.
2. Personal protective equipment to be worn to minimize exposure
1. Sulphuric acid spill reaching the stormwater system
2. Staff injured while trying to contain it
1. Sulphuric acid spill 2. Unsafe handling
II E H 1. Spill control equipment is provided near the Admixture Production Area. Employees are in regular attendance to implement spill control procedures
2. Staff are trained in the handling of dangerous goods
3. The Site stormwater system is fitted with a stormwater isolation valve, which will be closed in the event of an emergency.
1. NOx and SOx Emissions from hot oil/water heaters
1. Gas fired heaters used for production
V A H 1. Adequate ventilation within building
1. NOx and SOx Emissions from hot oil/water heaters
1. Malfunction in gas heaters
IV E L 2. Gas heaters would be regularly inspected and be part of the Site’s preventative maintenance program.
Powder Plant (Victoria and Queensland)
1. Stormwater pollution 1. Disposal of bags stained with raw materials into open bin.
2. Rain washing pollutants into stormwater system
III B H 1. The Site stormwater system is fitted with a stormwater isolation valve, which will be closed in the event of an emergency.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 39 of 107
Functional/
Operational Area
Possible
Hazards/Consequences
Possible Initiating
Event
Consequenc
e
Likelihoo
d
Risk
Impac
t
Pre-emptive Actions and
Prevention/Protection Measures
Tank Farm Area 1. Spill of material. 2. Material escapes to
stormwater. 3. Spilled material forms a
vapour.
1. Packaging failure. 2. Package damaged
during handling
II E H 1. Only experienced operators trained in safe operating procedures will be allowed to work in this area.
2. All material stored in the tank farm are water based and not classed as flammable goods.
3. Tank farm area is adequately bunded. Bunding is greater than 110 % of the largest tank.
4. The Site’s stormwater system is fitted with a stormwater isolation valve, which will be closed in an emergency.
5. Spill control equipment is provided near the tank farm area. Employees are in regular attendance to implement spill control procedures.
1. Vapour impacts on employees’ personal health and safety.
1. Packaging failure. 2. Package damaged
during handling
III D M 1. All material stored in the tank farm are water based and not classed as flammable goods.
2. Personal protective equipment to be worn to minimize exposure.
Dangerous Goods Storage Area (Class 3 – Flammable Liquids)
1. Spill of material.
1. Packaging failure 2. Package damaged
during handling.
IV C M 1. Depot designed as per AS 1940. 2. No materials are stored in bulk. 3. All operations done by experienced
staff trained in safe operating procedures.
4. Depot is internally bunded. 5. Spill control equipment is provided
near the delivery area. Employees are in regular attendance to implement spill control procedures.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 40 of 107
Functional/
Operational Area
Possible
Hazards/Consequences
Possible Initiating
Event
Consequenc
e
Likelihoo
d
Risk
Impac
t
Pre-emptive Actions and
Prevention/Protection Measures
1. Spill of material. 2. Material escapes to
stormwater.
1. Release / damaged during product transfer.
2. Valve, pipe or hose failure.
II E H 1. All product transfer operations supervised by experienced operators trained in safe operating procedures.
2. Transfer area is adequately bunded. 3. Spill control equipment is provided
near the delivery area. Employees are in regular attendance to implement spill control procedures.
1. Spilled material comes into contact with incompatible substance.
1. Packaging failure. 2. Package damaged
during handling.
III D M 1. Design as per AS 1940. 2. Only Class 3 or Combustible Liquids
are store in Depot. 3. No materials are stored in bulk. 4. Separation distances to be observed
between incompatible materials. 5. Staff to be trained in chemical risk
assessment process.
1. Spilled material forms a vapour.
2. Vapour impacts on employees’ personal health and safety.
3. Material finds an ignition source resulting in a fire.
4. Full-scale fire develops involving tanks.
5. Staff injury from fire 6. Air and stormwater
pollution from fire
1. Packaging failure. 2. Package damaged
during handling. 3. Ignition source near
spill
I E H 1. Depot designed as per AS 1940. 2. No materials are stored in bulk. 3. Strict control of ignition sources
including a hot work permit system will operate.
4. The Depot is fitted with a fire safety door that closes in the event of an emergency.
5. Mechanical ventilation system shuts down in emergency.
6. No smoking will be permitted in the delivery area
7. Fire services are located near the delivery area.
8. The Site’s stormwater system is fitted with a stormwater isolation
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 41 of 107
Functional/
Operational Area
Possible
Hazards/Consequences
Possible Initiating
Event
Consequenc
e
Likelihoo
d
Risk
Impac
t
Pre-emptive Actions and
Prevention/Protection Measures
valve, which will be closed in an emergency.
Dangerous Goods Storage Area (other classes)
1. Spill of material.
1. Package failure. 2. Package damaged
during handling.
IV C M 1. Warehouse designed as per AS 3833.
2. Separation distances observed. 3. No materials are stored in bulk. 4. Warehouse is internally bunded.
1. Spill of material. 2. Material escapes to
stormwater.
1. Release / damaged during product transfer.
2. Valve, pipe or hose failure.
II E H 1. All product transfer operations supervised by experienced operators trained in safe operating procedures.
2. Transfer area is adequately bunded. 3. Spill control equipment is provided
near the delivery area. Employees are in regular attendance to implement spill control procedures.
1. Spilled material comes into contact with incompatible substance.
2. Spilled material forms a vapour.
3. Vapour impacts on employees’ personal health and safety.
4. Material finds an ignition source resulting in a fire.
5. Full-scale fire develops. 6. Staff injury from fire 7. Air and stormwater
pollution from fire
1. Package failure. 2. Package damaged
during handling. 3. Release / damaged
during product transfer.
4. Valve, pipe or hose failure
I E H 1. All product transfer operations supervised by experienced operators trained in safe operating procedures.
2. Transfer area is adequately bunded. 3. Spill control equipment is provided
near the delivery area. Employees are in regular attendance to implement spill control procedures.
4. Strict control of ignition sources including a hot work permit system will operate. No smoking will be permitted in the delivery area.
5. Fire services are located near the mixer area.
6. The Site’s stormwater system is
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 42 of 107
Functional/
Operational Area
Possible
Hazards/Consequences
Possible Initiating
Event
Consequenc
e
Likelihoo
d
Risk
Impac
t
Pre-emptive Actions and
Prevention/Protection Measures
fitted with a stormwater isolation valve, which will be closed in the event of an emergency.
Delivery/Despatch Area 1. Spill of material. 2. Material escapes to
stormwater. 3. Air pollution
1. Package damaged during product transfer.
2. Tanker damaged during product transfer.
3. Valve, pipe or hose failure.
4. Incorrect tanker compartment filled.
5. Tank unable to hold contents.
6. Tanker drives off during product transfer.
7. Truck or car reverses into freshly received Dangerous Goods
II E H 1. All product transfer operations supervised by experienced operators trained in safe operating procedures.
2. No dangerous goods are stored in bulk.
3. Delivery area is adequately bunded. 4. The Site’s stormwater system is
fitted with a stormwater isolation valve, which will be closed in the event of an emergency.
5. All product transfer operations supervised by experienced operators trained in safe operating procedures.
1. Spill of material. 2. Exposure impacts on
employees’ personal health and safety.
1. Package damaged during product transfer.
2. Tanker damaged during product transfer.
3. Valve, pipe or hose failure.
4. Incorrect tanker compartment filled.
III D M 1. All product transfer operations supervised by experienced operators trained in safe operating procedures.
2. Spill control equipment is provided near the delivery area. Employees are in regular attendance to implement spill control procedures.
3. Personal protective equipment to be worn to minimize exposure.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 43 of 107
Functional/
Operational Area
Possible
Hazards/Consequences
Possible Initiating
Event
Consequenc
e
Likelihoo
d
Risk
Impac
t
Pre-emptive Actions and
Prevention/Protection Measures
5. Tank unable to hold contents.
6. Tanker drives off during product transfer.
7. Truck or car reverses into freshly received Dangerous Goods
1. Spilled material comes into contact with incompatible substance.
2. Spilled material forms a vapour.
3. Material finds an ignition source resulting in a fire.
4. Full-scale fire develops. 5. Staff injury from fire 6. Air and stormwater
pollution from fire
1. Package damaged during product transfer.
2. Tanker damaged during product transfer.
3. Valve, pipe or hose failure.
4. Incorrect tanker compartment filled.
5. Tank unable to hold contents.
6. Tanker drives off during product transfer.
7. Truck or car reverses into freshly received Dangerous Goods
I E H 1. All product transfer operations supervised by experienced operators trained in safe operating procedures.
2. Transfer area is adequately bunded. 3. Spill control equipment is provided
near the delivery area. Employees are trained and in regular attendance to implement spill control procedures.
4. Strict control of ignition sources including a hot work permit system will operate. No smoking will be permitted in the delivery area.
5. Fire services are located near the loading area.
6. The Site’s stormwater system is fitted with a stormwater isolation valve, which will be closed in the event of an emergency.
Warehouse / Office 1. Flooding of area. 2. Materials come into
contact with floodwaters. 3. Material escapes to
stormwater.
1. Heavy Rain. III E M 1. Site considered to be above flood risk area.
2. Warehouse area is internally bunded 3. No Dangerous Goods are stored in
bulk.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 44 of 107
Functional/
Operational Area
Possible
Hazards/Consequences
Possible Initiating
Event
Consequenc
e
Likelihoo
d
Risk
Impac
t
Pre-emptive Actions and
Prevention/Protection Measures
4. The Site’s stormwater system is fitted with a stormwater isolation valve, which will be closed in the event of an emergency.
1. Staff injury 2. Loss of product
1. Unsafe material loading/unloading
II D H 1. All product transfer operations supervised by experienced operators trained in safe operating procedures.
2. Spill control equipment is provided near the delivery area. Employees are trained and in regular attendance to implement spill control procedures.
Waste Disposal 1. Water pollution at drum cleaning point
1. Water used to clean drums are released and enter stormwater system
III B H 1. Rinsing water are recycled into the batch process and not disposed of in the stormwater system.
2. The Site’s stormwater system is fitted with a stormwater isolation valve, which will be closed in the event of an emergency or pollution incident
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 45 of 107
6.5 MATERIAL SAFETY DATA SHEETS
Full sets of Material Safety Data Sheets for the products stored in particular locations and
used, manufactured or stored on Site are on Site - (refer Appendix 3).
At depots where Dangerous Goods and/or hazardous goods are stored.
Laboratory - Full set of finished goods MSDS’s
Laboratory - Full set of raw material MSDS’s
Sika Australia Pty Ltd Web Site - www.sika.com.au
Sika Australia Pty Ltd Local Area network - Full set of finished goods MSDS’s
Material Safety Data Sheets contain a range of information including:
Physical properties, chemical reactivity.
Health considerations, TLV, toxicity, first aid, advice to Doctor.
General hazard statement, fire/explosion hazards.
Spills, storage and transport, handling.
Personal protection recommendations.
Fire fighting information
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 46 of 107
7.0 CHEMICALS MANUFACTURED, STORED OR CONSUMED ON SITE
The following table provides a typical list of chemicals manufactured, stored and/or consumed,
along with the expected quantities of each chemical.
TABLE 7.1: DG 3’s STORED IN DEPOT 1
Material UN
No.
Pack DG
Class
PG
Class
Hazchem
Code
Quantity
Acetone 1090 3 II 2[Y]E 200L
N-Butanol 1120 3 II or III 3[Y]E 200L
N Butyl Acetate 1123 3 II or III 3[Y]E 170L
SikaPlan Contact Adhesive 1133 25kg 3 II or III 3[Y]E 1100 kg
Corsol PGMA Methoxy
Propylacetate
1172 3 III 2S 422L
Methyl Ethyl Ketone 1193 3 II 2[Y]E 115L
Isobutanol 1212 3 III 3[Y] 400L
Isopropanol 1219 3 II 2[S]E 300L
Dowanol PM/Methoxy Propanol 1219 3 II 2[S]2 460L
Pigment White #957 1263 35 kg 3 III 3[Y]E 2190
Bentone Paste 38 Spec BC Bulk 1268 3 II or III 3[Y]E 55kg
Bentone Paste 62 Bulk 1268 3 II or III 3[Y]E 190kg
Sikagard 1268 205L 3 II or III 3[Y]E 5000L
Toluene 1294 3 II 3[Y]E 3kg
White Spirit 1300 3 III 3[Y] 1000L
Xylene 1307 3 II 3[Y]E 3000L
Univar Xylene #576 for Pri 1/202 1307 3 II 3[Y]E 35L
Butyl Titanate 1993 3 II or III 3[Y]E 110L
Wacker 290 1993 290 L 3 II or III 3[Y]E 1400L
Thinner K 1993 20L 3 II 3[Y]E 500L
Thinner 15 S/Floor Bulk 1993 3 II 3[Y]E 1000L
The following tables provide the list of chemical inventory for each significant location on Site.
Please refer to the Site plan provided on display by SIKA AUSTRALIA PTY LTD (Wetherill
Park) for details of these locations.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 47 of 107
TABLE 7.2: DANGEROUS GOODS CLASS 3 STORED IN TANKS IN DEPOT 2
Tank No. Material DG
Class
PG Hazchem Volume
1 Sikadur 281 C1 8000 L
2 Solvesso 100 3 III 6000 L
3 Pigment Paste 3 III 3[Y] 3000 L
4 Sikacolor Substrate 3 III 3[Y] 6000 L
TABLE 7.3: DANGEROUS GOODS CLASS 2 STORED IN DEPOT 4
Tank No. Material DG
Class
PG Hazchem Volume
1 LPG 2.1 - 2WE 1000 kg
TABLE 7.4: DANGEROUS CLASS 5 STORED IN DEPOT 12’
Material UN
No.
Pack DG
Class
PG
Class
Hazchem
Code
Quantity
Calcium Nitrate 1454 1,000 kg 5.1 III 2[T] 8,000
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 48 of 107
TABLE 7.5: DG 8’s STORED IN DEPOT 3
Material UN
No.
Pack DG
Class
PG
Class
Hazchem
Code
Quantity
kg
Acticide As 1719 8 II or III 2R 250kg
Sikadur 31 PTB Rapid Bulk 1759 8 III 2X 200kg
Sikadur 302 PTB Rapid Bulk 1759 8 III 2X 200kg
Sikadur 31/41 Rapid PTB 1759 5 kg 8 III 2X 1200kg
Epomate S 002 1760 8 II 2X 400L
Ancamine 1637 1760 8 II or III 2X 355L
Beckopox 622W 1760 8 II or III 2X 1900L
S/Floor 93 PTB Basic Hardener 1760 bulk 8 II or III 2X 1350kg
S/Floor 93/94 PTB Rapid
Hardener
1760 bulk 8 II or III 2X 450kg
Sikadur 341 PTB Long Potlife
Bulk
1760 8 III 2X 1300kg
Sikadur 32 L/Potlife PTB 1760 bulk 8 III 2X 1000kg
Sikadur 340 PTB Normal 1760 bulk 8 III 2X 3000kg
Epocem PTB 1760 bulk 8 III 2X 1000kg
Sikadur 32 L/Potlife PTB 1760 1.66kg 8 III 2X 2600kg
Sikadur 52/42/43 1760 1kg 8 III 2X 1000kg
Sikagard 62 PTB 1760 3kg 8 III 2X 700kg
Phosphoric Acid 85% 1805 8 III 2R 1000
Potassium Hydroxide Flake 1813 8 II 2X 500kg
Sodium Hydroxide 50% soln. 1823 8 II 2X 500kg
DMEA 2051 8 II 2Y 1000L
TETA 2259 8 II 2R 3000L
IPD/Hardener 2962 2289 8 III 2R 65kg
TMD/Hardener HY2996 2327 8 III 2R 380kg
Monoethanolamine 2491 8 III 2R 150kg
Polymid 125 2735 8 I, II or III 3W 250kg
Euredur 16 2735 8 I, II or III 3W 80kg
Laromin C260 2735 8 I, II or III 3W 110kg
SIKA AUSTRALIA PTY
LTDAUSTRALIA PTY
LTDHardener 1
2735 200 kg 8 III 3W 400kg
SIKA AUSTRALIA PTY
LTDAUSTRALIA PTY
LTDHardener 1 Bulk
2735 8 III 3W 1000kg
Sodium Aluminate 2812 8 II or III 2R 320kg
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 49 of 107
TABLE 7.6: DG 8’s STORED IN DEPOT 6
Material UN
No.
Pack DG
Class
PG
Class
Hazchem
Code
Quantity
FerroGard 903 2491 20L 8 III 2R 1000L
FerroGard 903 2491 25kg 8 III 2R 500kg
Sikadur 31/41 PTB Nrml 1759 15kg 8 II or III 2X 150kg
Sikadur 31 Part B Rapid potlife 1759 30kg 8 II or III 2X 200kg
Sikadur 31 Long potlife 1759 2kg 8 II or III 2X 700kg
Sikadur 31 Long potlife 1759 5kg 8 II or III 2X 2700kg
Sikadur 31 Normal 1759 2kg 8 II or III 2X 30kg
Sikadur 31 Normal 1759 5kg 8 II or III 2X 2000kg
Sikadur 31 Rapid 1759 2kg 8 II or III 2X 100kg
Sikadur 31 Rapid 1759 5kg 8 II or III 2X 1400kg
Sikadur 51 1759 3kg 8 II or III 2X 100kg
Con s/floor 7530 1760 12.5kg 8 II or III 2X 350kg
Sikadur 32 long potlife 1760 2kg 8 II or III 2X 500kg
Sikadur 32 long potlife 1760 5kg 8 II or III 2X 1500kg
Sikadur 42 Normal 1760 5kg 8 II or III 2X 35kg
Sikadur 52/42/43 l/potlife 1760 1.5kg 8 II or III 2X 250kg
Sikadur 52/42 l/potlife 1760 3kg 8 II or III 2X 500kg
Sikadur 52/SFL94 l/potlife 1760 8kg 8 II or III 2X 480kg
Sikadur 52/42/43 normal 1760 1.5kg 8 II or III 2X 75kg
Sikadur 52/42 & 742 normal 1760 3kg 8 II or III 2X 800kg
Sikadur 52(s/floor94) normal 1760 8kg 8 II or III 2X 250kg
Sikadur 52 normal twin ctg 1760 450ml 8 II or III 2X 300L
Sikadur 53 1760 1.8kg 8 II or III 2X 120kg
Sikadur 53 1760 18kg 8 II or III 2X 1700kg
Sikadur 349 1760 2.9kg 8 II or III 2X 350kg
Primer Sikadur Kote Part B 1760 200ml 8 II 2R 2L
Sika Australia Pty LtdAustralia
Pty Ltd4a Quickset
1760 5L 8 II or III 2X 40L
Sika Australia Pty LtdAustralia
Pty Ltd4a Quickset
1760 20L 8 II or III 2X 650L
Sikafloor 93 PTB basecoat hdnr 1760 2.9kg 8 II or III 2X 350kg
Sikafloor 93 PTB basecoat hdnr 1760 20kg 8 II or III 2X 1000kg
Sikafloor 93 PTB basecoat rapid 1760 2.3kg 8 II or III 2X 580kg
Sikafloor 93 PTB topcoat hdnr 1760 3.2/20 8 II or III 2X 800kg
Sikafloor 94 PTB normal 1760 10kg 8 II or III 2X 1000kg
Sikafloor 94 PTB 1760 180kg 8 II or III 2X 5400kg
Sikafloor 94 PTB Rapid 1760 3.3/6.7 8 II or III 2X 150kg
Sikafloor 7530 PTB 1760 1.25kg 8 II or III 2X 600kg
Sikagard 62 unpigmented 1760 11.4kg 8 II or III 2X 1000kg
Sikagard 63 PTB 1760 2.5kg 8 II or III 2X 300kg
SikaTransfloor primer alm 1760 5kg 8 II or III 2X 200kg
SikaTransfloor flooring cpd 1760 30kg 8 II or III 2X 480kg
SikaTransfloor primer w & g 1760 7.5kg 8 II or III 2X 375kg
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 50 of 107
TABLE 7.6: DG 8’s STORED IN DEPOT 6
Material UN
No.
Pack DG
Class
PG
Class
Hazchem
Code
Quantity
SikaTransfloor rapid 1760 20kg 8 II or III 2X 40kg
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 51 of 107
TABLE 7.7: DG 6’s STORED IN DEPOT 7
Material UN
No.
Pack DG
Class
PG
Class
Hazchem
Code
Quantity
Sikaflex T68W kit 2207 10kg 6.1 III 2X 2800kg
Sikaflex T68NS kit 2207 25kg 6.1 III 2X 1000kg
Sikaflex TR23 PTA 2207 18kg 6.1 III 2X 2000kg
TABLE 7.8: DG 3’s STORED IN DEPOT 8
Material UN
No.
Pack DG
Class
PG
Class
Hazchem
Code
Quantity
Cleaner 205/Activator/ Adhesive 1219 250ml 3 II 2[S]E 500L
SikaCleaner 1&205 1219 250ml-
1L
3 II 2[S]E 500L
S/Cleaner adhesion promoter 207 1300 1L 3 II or III 3[Y]E 150L
Sika Australia Pty LtdAustralia
Pty LtdRemover 208
1300 250ml 3 II or III 3[Y]E 1000L
Sika Australia Pty LtdAustralia
Pty Ltdtransfloor top coat prt C
1307 1kg 3 II or III 3[Y]E 300kg
Primers 35/210T, 206G & P
Primers 209 , 215/290DC
Primers 203/21, PU
1866 3 II 3[Y]E 1000L
Primer 35 & 210T 1866 250ml-
1L
3 II 3[Y]E 350L
Colma cleaner 1993 1L 3 II 3[Y]E 380L
Hypalon Welding Solvent
Thinner C
1993 1L 3 II 3[Y]E 1000L
Sikagard 702W 1933 5L 3 II 3[Y]E
Sika Australia Pty LtdAustralia
Pty LtdThinner for adhesive c733
1933 20L 3 III 3[Y]
Thinner 15 1993 1L 3 II 3[Y]E 500L
Total: 2.5 tonnes
TABLE 7.9: DG 3’s STORED IN DEPOT 10
Material UN
No.
Pack DG
Class
PG
Class
Hazchem
Code
Quantity
Sikagard 70 1268 20L 3 III 3[Y] 200L
Tiltseal / Product “P” 1268 20L 3 III 3[Y] 40L
Colma Cleaner 1993 20L 3 III 2[S]E 1000L
Thinner C/Hypalon Welding 1933 20L 3 III 3[Y] 400L
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 52 of 107
TABLE 7.9: DG 3’s STORED IN DEPOT 10
Material UN
No.
Pack DG
Class
PG
Class
Hazchem
Code
Quantity
Solvent
Sika Australia Pty LtdAustralia
Pty LtdThinner for adhesive c733
1933 20L 3 III 3[Y] 2000L
Thinner 15 1933 20L 3 III 3[Y] 1000L
Thinner 65 1933 20L 3 III 3[Y] 600L
TABLE 7.10: DG 3’s STORED IN STORAGE AREA ‘A’
Material UN
No.
Pack DG
Class
PG
Class
Hazchem
Code
Quantity
Sikagard 680s 1263 3 III 3[Y]
Elasto Colour Primer 1263 3 III 3[Y]
Rugasol MH 1263 3 III 3[Y]
Sikabond 1133 3 III 3[Y]E
SikaColors & Sikagard 65A & B 1263 3 III 3[Y]
TABLE 7.11: DG 3’s STORED IN STORAGE AREA ‘B’
Material UN
No.
Pack DG
Class
PG
Class
Hazchem
Code
Quantity
Thinner 15 1933 1L 3 III 3[Y]
Colma Cleaner 1993 1L 3 III 2[S]E
Primers1/202 1866 1L 3 III 3[Y]
Primer 209/15, 35/210T,
290DC/215, 206 G & P, 3
1866 250ml 3 II 3[Y]
Primer PU 1866 0.5kg 3 II 3[Y]
Total exempt quantity
Packaging Group II = 100L
Packaging Group III = 1000L
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 53 of 107
7.1 HAZCHEM CODES
Hazchem Codes are an abbreviated action code developed by UK Fire Services in order
to conveniently convey immediate response information. The key for the Hazchem Codes
(in above tables) is as follows:
The HAZCHEM Code consists of either two or three characters, the first being a numeral,
followed by either one or two letters.
THE NUMERAL
The first character, a numeral in the range of 1 to 4, indicates the type of medium to be
employed by the fire services personnel.
Medium Selection
1 indicates the use of solid streams of water
2 indicates the use of a water fog or fine water spray
3 indicates the use of a water-based foam
4 indicates the use of a dry agent such as a dry chemical powder, eg. sodium carbonate
or dry sand
THE SECOND CHARACTER
The second character in the code is a letter selected from the range P, R, S, T, W, X, Y, Z
which indicates the type of personal protection to be worn, the possibility of violent
reaction, and whether the substances and the medium employed should be contained or
the substances diluted. The characters are generally black on a white background.
Personal Protection
The letters P, R, W or X indicate that a full chemical protection suit and breathing
apparatus should be worn.
The letters and may on occasion appear as reversed characters indicate that breathing
apparatus need only be worn if the substances are involved in a fire.
THE THIRD CHARACTER
The third character, when appearing, is the letter E. This indicates that evacuation of
persons in the neighbouring areas must be taken into consideration. Persons in the
immediate area of the incident should always be evacuated to a safer location irrespective
of whether the letter E appears in the HAZCHEM Code.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 54 of 107
HAZCHEM EMERGENCY ACTION CODES
1 WATER JET 2 WATER FOG 3 FOAM 4 DRY AGENT
P V FULL DILUTE
R
S V BA
[S] or S BA for FIRE only
T BA
[T] or T BA for FIRE only
W V FULL
X
BA
Y BA CONTAIN
[Y] or Y BA for FIRE only
Z BA
[Z] or Z BA for FIRE only
E CONSIDER EVACUATION
NOTES FOR GUIDANCE
V Violently of even explosively reactive
BA Use breathing apparatus
FULL Use full body protective clothing with BA
DILUTE Wash to drain with large quantities or water
CONTAIN Prevent spillage from entering drains or watercourses
7.2 INVENTORY OF OTHER POTENTIAL POLLUTANTS
The following table provides the list of waste produced on Site, which are deemed as
other potential pollutant sources.
TABLE 7.12: OTHER POTENTIAL POLLUTANTS
Potential Pollutant Location Controls Approximate
Quantity
General Waste Site wide Good housekeeping and designated
bins 5 T
Paper & Cardboard Waste Office/warehouse Recycling and housekeeping 500 kg
Dust Admixture Plant,
silos, mixing/filling plant, powder plant
Dust collectors, wet scrubbers, spill kits
50 Kg
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 55 of 107
TABLE 7.12: OTHER POTENTIAL POLLUTANTS
Potential Pollutant Location Controls Approximate
Quantity
Non-hazardous raw materials
Warehouse Appropriate storage and spill kits. 1 T
Tradewaste Clean out of mixers Spill kits, directed straight to
tradewaste 2 T
8.0 FIRE/EMERGENCY ALARM SYSTEM
The Wetherill Park Sites have their own Fire/Emergency alarm system with both automatic
and break-glass initiation. These Sites also have heat and smoke detectors which activates
the siren response and also automatically calls out the local Fire Brigade.
8.1 ALARM ACTIVATION
i) Alert Alarm Siren – Siren blasts of 1-second duration at intervals of 1 second.
This alarm can be raised by anyone discovering an emergency situation.
Activation of alarm will commence by breaking the alarm glass. If the Chief
Warden is promptly informed of emergency details the alarm may be stopped
before 90 seconds elapses, after which time it reverts automatically to the
evacuation mode.
ii) Evacuation Alarm Siren – Repeated 3-second siren blasts at 1 second
intervals.
Note: The alarm will go through its alert sequence for 90 seconds prior
to evacuation alarm.
8.2 ALARM TESTING
Fire/Emergency alarms are regularly tested. Prior to testing, an alert is raised via the
PA system. Any alarm malfunction shall be reported to the Site Manager.
For The Elizabeth Street Site
1. Open the door of the left-hand beige control panel in the entrance foyer of the logistics and
laboratory building.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 56 of 107
2. Turn the right hand control knob from ‘Auto’ to ‘Manual’ setting. This prevents the alarm in
Wetherill Park Fire Station being activated.
3. Turn the Mode Select knob from the ‘Off’ to ‘PA’ setting. The amplifier ‘On’ light at the top
right of the panel should light up.
4. Lift the microphone from its mounting on the inside of the control panel door, press in the
switch on the left hand side of its body and in announce in a clear loud voice that the fire
alarm is about to be tested and should be ignored.
5. Switch ‘Mode Select’ knob to ‘Alert’ mode for about 10-seconds followed by 10-seconds in
‘Evac’ mode.
6. Return ‘Mode Select’ knob to ‘Off’ and the right hand knob from ‘Manual’ to ‘Auto’ position.
7. For the Elizabeth St alarm test contact some individuals working in the following
departments at the time of the test to check they heard the siren loud and clear:
Accounts Department
Laboratory
Raw Material Warehouse
Powder Plant
Resin Plant
For The Hargraves Place Site
1. The lowest door on the red Fire Alarm control panel is opened near the sales office
entrance.
2. Turn the right hand control knob from ‘Auto’ to ‘Manual’ setting. This prevents the
alarm in Wetherill Park Fire Station being activated.
3. Turn the Mode Select knob from the ‘Off’ to ‘PA’ setting. The amplifier ‘On’ light at the top
right of the panel should light up.
4. Lift the microphone from its mounting on the inside of the control panel door, press in the
switch on the left hand side of its body and in announce in a clear loud voice that the fire
alarm is about to be tested and should be ignored.
5. Switch ‘Mode Select’ knob to ‘Alert’ mode for about 10-seconds followed by 10-seconds in
‘Evac’ mode.
6. Return ‘Mode Select’ knob to ‘Off’ and the right hand knob from ‘Manual’ to ‘Auto’ position.
7. The procedure only differs to that used in the Elizabeth St Site in checking those who
heard in the following locations:
Upstairs Sales office
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 57 of 107
Warehouse
Admixture Plant / Viscocrete Plant
8.3 ALARM DEACTIVATION
The deactivation of the Alarm System will be determined by the Chief Warden or
External Emergency Services who will delegate the task by:
* Confirming that the emergency has concluded
* Checking all buttons as necessary, replace the broken glass to keep the button
depressed in its ‘no-alarm’ position.
* Go to control box, at office entrance and turn siren switch to off.
* Check for fire alarm activation.
* Follow instruction for resetting.
If necessary, a particular alarm sector may need to be temporarily isolated to provide
alarm protection to the rest of the Site in the event of faulty sensor. This will be done
at the discretion of the Fire Brigade or Chief Warden.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 58 of 107
9.0 EMERGENCY AND POLLUTION INCIDENT RESPONSE AND CONTROL
In the event of an emergency, or if a pollution incident occurs which poses a risk of material
harm to the environment, the person carrying out the activity must immediately implement this
plan.
9.1 RAISING THE ALARM
Any person (this includes contractors as well as SIKA AUSTRALIA PTY LTD
personnel) who observes an emergency situation, or a pollution incident with risk or
material harm to the environment, shall raise the Site alert alarm by activating the
break-glass fire alarm (refer Appendix 4).
Always sound the alarm even if in doubt about an event qualifying as an
emergency. Even small fires in plant areas must be treated as an emergency
situation.
The person raising the alarm should attempt to control the emergency only if safe
to do so.
Go or send someone quickly, with the details to the Chief Warden at the
Emergency assembly point.
If there is any danger in remaining in the emergency area go directly to the Site
assembly point and wait (see map appendix 7).
9.2 EMERGENCY RESPONSE
For those not involved in the immediate emergency area or response :-
ON HEARING ALERT ALARM SIREN
Ensure others in the area are aware of the emergency
Collect personal property in the immediate area only
Be prepared to turn off all electrical equipment
ON HEARING EVACUATION ALARM SIREN
Shut down all equipment if safe to do so.
Evacuate work area closing any doors behind you
Proceed to closest Emergency Assembly Point and report to Warden
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 59 of 107
Remain at Emergency Assembly point until advised
Take all Visitors/contractors to the assembly point and account for as quickly as
possible, via the Roll Callers.
For those involved in the Emergency and Pollution Incident Response Plan :-
Invoke Emergency and Pollution Incident Response Management Plan in accordance with
assigned responsibilities.
9.3 EMERGENCY CONTROL
Chief Warden
The Chief Warden shall be responsible for coordinating the initial Site response of the ERT to
the emergency and in the event of a major emergency that warrants evacuation and
attendance of External Emergency Services, he / she shall HAND OVER control upon arrival
to the Combating Authority (the Fire Brigade). In the event of a pollution incident, the Chief
Warden must also follow the Notification of a Pollution Incident Procedure and notify the
relevant authorities and the nearest neighbouring facilities (if necessary). Details of who to
notify and what to notify are identified in Section 11.0.
The Combating Authority (The Fire Brigade)
The Senior Officer takes charge of:
. Fire fighting
. Spillage control
. Containment
. Rescue
. Make safe
. Clean up
The Control Co-ordinator (The Police)
The Senior Officer takes charge of:
. Ground control
. Traffic control
. Evacuation - neighbours
. Investigation
. Security
. Support to Fire Brigade
. Coordination
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 60 of 107
The Medical Authority (The Ambulance Commander)
The Senior Officer takes charge of:
. Treating victims
. Rescue and transport
9.4 HANDOVER BRIEFING
A Formal Handover Briefing by the Chief Warden to the Combating Authority will include:
. Location, nature and status of the emergency
. Details or personnel injured or trapped
. Action taken to date
. Location of all personnel involved
. Details of product(s) involved
. Any other relevant information
It is essential that close liaison and complete cooperation is achieved between the Chief
Warden and the External Emergency Services (Fire Brigade, Police, Ambulance) and other
SIKA AUSTRALIA PTY LTD personnel.
Technical and general advice about chemical/toxic/fire hazards must be given. Material
Safety Data Sheet information will be made available to the External Emergency Services.
9.5 TRAFFIC CONTROL
In any emergency, internal roads must be free of vehicles not involved in handling the
emergency. Access must be clear for large service vehicles at all times. There should
be two access paths to the Site of an emergency always.
Vehicles which are not directly involved in the emergency must NOT be allowed on Site.
The control of external roadways, pedestrian and vehicle control is the responsibility of
the NSW Police Dept.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 61 of 107
9.6 AFTER HOURS EMERGENCY
After hours emergency would be identified and monitored by security monitoring personnel.
Hence, the following events would occur in chronological order:
i) Fire/Emergency alarms will sound and will indicate locally.
This would be observed by security monitoring personnel or others nearby to the Site.
Site management will be contacted by the Fire Brigade as required.
ii) Security patrols and internal monitoring alarms will indicate any possible break-ins that
could lead to damage of facilities and stocks. Police and Site management will be
contacted by Security Services.
9.7 NEIGHBOURING PROPERTIES
Neighbouring properties could potentially be involved. Refer Appendix 8.
9.8 FIRE ORDER
A fire may cause significant property damage and human harm. A fire may also cause a
significant amount of smoke and toxic fumes (especially if involving chemicals) being
released to the atmosphere and the surrounding neighbours. The fire fighting water may
contain pollutants such as chemicals and may run into the stormwater system and pollute
the nearest stream, river, beach, etc. It is therefore important to know how to handle an
event involving a fire on Site.
The principles are as follows:
1. Be safe
Identify the location of the fire
2. Raise Alarm
Activate the fire/emergency alarm
Notify other colleagues and seek assistance
Notify Chief Warden
Notify Agencies such as Fire Services and/or follow Notification of a Pollution Incident
Procedure (as required)
Notify neighbours with safety instructions if they are likely to be impacted
3. Restrict the fire and Protect Waters
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 62 of 107
Close doors and isolate the fire
Close Site Stormwater Isolation Valves
Bock entry to drains
4. Extinguish the fire
Only if safe to do so, extinguish fire using the fire fighting equipments available
5. Evacuate
If necessary, follow evacuation procedure
6. Clean Up and Dispose Responsibly
Clean up debris and pollutants caused by the fire appropriately
Clean stormwater pits and drains
Can waste material be re-used?
If amount of waste is significant, consult Waste Disposal Company to dispose of
materials
7. Restock
Replace and refill any used fire fighting equipments and damaged safety resources
Review incident – can we learn from this?
Can it happen elsewhere?
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 63 of 107
FIRE ORDER
FIND Find the Fire
INFORM Raise the Alarm
RESTRICT Close Doors / Isolate
EXTINGUISH Only if safe
EVACUATE Move to safety
EMERGENCY PHONE NUMBERS
Site Emergency 9
Emergency Services 000
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 64 of 107
9.9 SPILL ORDER
An uncontrolled spill may run directly or indirectly (via soil, water table etc) into the stormwater
system and pollute the nearest stream, river, beach, etc. In order to prevent pollution and
minimize the potential environmental impact and liability, it is important to know how to handle
a spill in the event that a spill occurs on Site.
The principles are as follows:
1. Be safe
Identify the spilt material
Consult Material Safety Data Sheet
Wear personal protective equipment (PPE)
2. Raise Alarm
Notify other colleagues and seek assistance
Notify switch, Supervisor
Notify Agencies such as Fire Services or EPA as required
3. Stop the Source
For example, turn off valve, roll drum on side so the leaking bung is at top
4. Protect Waters
Contain spill
Close Site Stormwater Isolation Valves
Bock entry to drains
Dyke with sand, absorbent material
5. Clean Up
Pump liquid spills into safe container
Absorb into inert material (such as sand)
Sweep up or vacuum spills
6. Dispose Responsibly
Can the material be re-used?
Consult Waste Disposal Company to dispose of materials
Absorb into inert material (such as sand)
7. Restock
Replace any PPE used from Spill Stations
Review incident – can we learn from this?
Can it happen elsewhere?
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 65 of 107
SPILL ORDER
FIND Find the Spill
INFORM Raise the Alarm
CLOSE Close the source
CONTAIN Contain the spill
CLEAN UP Clean up the spill
EMERGENCY PHONE NUMBERS
Site Emergency 9
Emergency Services 000
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 66 of 107
10.0 TERMINATION OF AN EMERGENCY
10.1 INTERNAL ALERT
If the emergency was contained on Site and did not warrant activation of the evacuation
alarm, the Chief Warden will terminate the emergency (upon receiving satisfactory reports
from staff involved in control, rescue, first aid etc).
The Chief Warden will personally inform or delegate someone to inform all Site personnel, still
in alert mode, in other areas of the Site.
10.2 EXTERNAL EVACUATION
If the emergency involved evacuation and attendance by External Emergency Services, the
Chief Warden will consult with them and formally take back control, and will then advise the
Managing Director who will announce the termination to Site personnel.
The necessary actions for clean up, safe storage and disposal of all contaminated materials
will initially be the responsibility of the Chief Warden. He / she can choose to delegate these
responsibilities to other people.
10.3 RECOMMENCING OPERATIONS
Resumption of normal operation will depend on damage to operating plants, removal of
debris, repair or replacement of machinery and the need to preserve evidence (see under
Statutory Investigation).
The decision to resume operations will be made by the Chief Warden or his deputy when he is
satisfied it is safe to do so.
Note: All work clearances being used at the time of the emergency must be re-
validated before work can recommence after the emergency is over.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 67 of 107
11.0 NOTIFICATION OF A POLLUTION INCIDENT
A pollution incident that occurs in the course of an activity so that material harm to the
environment is caused or threatened must be notified. This section details how, when
and who needs to be notified. The full procedure is provided in Appendix 12. The
following is a simple flowchart detailing how to respond to a pollution incident:
Pollution incident occurs
Does the incident pose an immediate
threat to human health or property?
Call 000
YES NO
Call Site Contact:
Site Emergency: 9
Operations Manager: 0408 248 062
YES
NO
Emergency Coordinator to call relevant
regulatory authorities immediately in the
following order:
NSW EPA – 131 555
Fairfield City Council – 9725 0222
The Ministry of Health – 9515 9420
(after hours: 9515 6111 - ask for Public
Health Officer on call)
WorkCover Authority – 13 10 50
Fire and Rescue NSW – 000
Notify all information known about incident.
Contact and notify any persons as requested
by the NSW EPA.
Provide written notification to all of the above
regulatory authorities within 7 days of the
incident (information to be included is provided
in the EPL).
Develop and implement a follow up action plan
in consultation with relevant regulatory
authorities.
Is incident causing or
threatening material harm?
Notification to
authorities is not
required.
Does incident pose threat
to neighbouring
properties?
YES
NO
Chief Warden and Emergency Team liaises with
emergency services and communicates details of
the incident to neighbouring properties that may
be affected
Follow relevant
SIKA internal
procedure.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 68 of 107
11.1 WHEN TO NOTIFY
Under Section 148 of the POEO Act, holders of environmental protection licences and
anyone carrying on an activity, or occupying a licensed premise, who becomes aware of a
pollution incident with a risk of material harm to the environment are required to report it
immediately.
“Material risk of harm to the environment” is defined under Section 147 of the POEO
Act as:
(a) Harm to the environment is material if:
(i) It involves actual or potential harm to the health or safety of human beings
or to ecosystems that is not trivial, or
(ii) It results in actual or potential loss or property damage of an amount, or
amounts in aggregate, exceeding $10,000 (or such other amount as is
prescribed by the regulations), and
(b) Loss includes the reasonable costs and expenses that would be incurred in taking
all reasonable and practicable measures to prevent, mitigate or make good harm to
the environment.
11.2 HOW TO NOTIFY
If the incident presents an immediate threat to human health or property:
CALL 000 Fire and Rescue NSW, the NSW Police and the NSW Ambulance Service
If the incident does not present an immediate threat, or once the initial 000 call has been
made:
Notify the relevant authorities in the following order:
NSW EPA – Environment Line 131 555
Fairfield City Council – 9725 0222
Ministry of Health 9515 9420
(After hours: 9515 6111 - ask for Public Health Officer on call)
WorkCover on 13 10 50 (WorkCover will ask for the ABN)
Fire and Rescue NSW – 000
Notify other persons as required by the EPA.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 69 of 107
11.3 WHAT TO NOTIFY
Section 150 of the POEO Act specifies relevant information about a pollution incident to
be given as follows:
(a) the time, date, nature, duration and location of the incident,
(b) the location of the place where pollution is occurring or is likely to occur,
(c) the nature, the estimated quantity or volume and the concentration of any
pollutants involved, if known,
(d) the circumstances in which the incident occurred (including the cause of the
incident, if known),
(e) the action taken or proposed to be taken to deal with the incident and any
resulting pollution or threatened pollution, if known,
(f) other information prescribed by the regulations.
The above information is that known to the informant notifying the incident at the time it is
notified. If further information becomes known after notification, this information needs to
be notified immediately after it becomes known.
11.4 SITE CONTACTS
Site personnel with specific responsibilities for incident response and management need
to be contacted in the event of an incident. This section contains the names, positions
and 24-hour contact details of those key individuals who:
(i) are responsible for activating the plan, and
(ii) are authorised to notify relevant authorities under section 148 of the Act,
and
(iii) are responsible for managing the response to a pollution incident.
The following table summarises the key individuals and their responsibilities. The full list
is found in Appendix 10. These key individuals are listed in order of who to contact in the
event of a pollution incident at the Site.
TABLE 11.1: SITE CONTACTS
Contact Name Telephone Responsibilities
Gajendra
Balabaskara
0400 357
131
Chief Warden – responsible for activating the plan,
notifying the relevant authorities, and managing the
response to an emergency or pollution incident
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 70 of 107
TABLE 11.1: SITE CONTACTS
Gary Boon 0407 067
916 Deputy Chief Warden – assume responsibilities of Chief
Warden if he/she is unavailable
Christine Khairy 0438 045
974 Area Warden (HO Building) – responsible for assisting
the response to an emergency or pollution incident
Greg Langton 0417 498
437 Area Warden (All laboratories) – responsible for
assisting the response to an emergency or pollution
incident
Mohammad
Popal (Hasim)
0439 452
581 Area Warden (Resin plant &Coatings) – responsible for
assisting the response to an emergency or pollution
incident
Paulo Vong 0424 592
828 Area Warden (Admixture plant) – responsible for
assisting the response to an emergency or pollution
incident
Qurban Fahez 0434 239
647 Area Warden (Raw Materials Goods Warehouse) –
responsible for assisting the response to an emergency
or pollution incident
Neru Vaa 0417 232
296 Area Warden (NSW Finished Goods and Sales Office)
– responsible for assisting the response to an
emergency or pollution incident
11.5 COMMUNICATING WITH NEIGHBOURS AND THE LOCAL COMMUNITY
The nearest neighbouring facilities have been identified in Appendix 8. The nearest
residents to the Site is approximately 1 km away so is unlikely to be affected
Communication mechanisms that would be used to notify these neighbouring facilities
would be dependent on the nature and extent of the pollution incident. Communication
methods used would primarily consist of telephone calls if the incident poses an
immediate threat to these neighbours. The Site may also utilise the following
communication methods to provide early warnings and regular updates to the owners and
occupiers of premises who may be affected by a pollution incident occurring:
Telephone calls (primary method);
Incident notifications on the company webSite;
Letterbox drops; or
Door-knocking
Specific information that can minimise the risk of harm will be provided to these
neighbours. For example, if a pollution incident occurs which causes the release of
smoke or fumes from the Site, the instructions to neighbours would be to turn off air
conditioning and evacuate staff up wind.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 71 of 107
12.0 MEDIA RESPONSE/PUBLIC RELATIONS
Company policy is that all media enquiry’s should be referred to a member of Senior
Management as quickly as possible therefore all media enquiry’s about the Wetherill Park Site
shall be referred to the Managing Director or in his absence the Operations Manager.
It is recommended that a positive image be conveyed to the media and that rather than stating
“no comment” message, that a message indicating that a Company spokesperson will be
making a statement and brief the media on the situation and be able to answer any questions
accordingly.
Any media releases shall be prepared and authorized by the Company Executive stating the
facts only i.e. cause, actions taken, effectiveness, expected termination, media cooperation
required.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 72 of 107
13.0 STATUTORY INVESTIGATION
There may be a statutory investigation into any Emergency.
A coronial enquiry may be held in the case of fire and will be held in the case of fatalities.
Relevant government authorities may also require investigating e.g. Department of Industrial
Relations and Employment, and Department of Environment and Planning.
The Chief Warden shall ensure that there is no interference with evidence and that any
cleaning up, repairs etc, apart from that necessary to bring the emergency under control does
no occur without approval of investigating officers.
The External Emergency Service Control Co-ordinator (Police) shall ensure that a senior police
officer is delegated to take charge of all aspects of the emergency which may later be subject of
a coronial inquiry.
13.1 INVESTIGATION AND WRITTEN REPORT
Immediately after the emergency is over the Chief Warden will arrange for a Site investigation
and written report of the incident to be prepared. The investigation will include a detailed
review of the sequence of events, communications and actions taken immediately prior to,
during and after the emergency situation.
Where available instrument charts, plant logs etc, will be examined carefully and retained. In
most cases photographs taken immediately after the emergency will be of value to the
investigators. Other evidence will be put in safe keeping when police have finished their
investigations. Those present at the emergency situation will be interviewed by the
investigating committee as soon as practical after the emergency.
The report will contain the following information:
Summary
Conclusions
Recommendations
Main body of the report should include brief relevant facts, findings, discussion and
analysis of findings and relevant operating data.
Appendices including photographs, diagrams, maps etc.
Normally the report will include a review of the emergency procedures and recommend
changes as required.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 73 of 107
14.0 TRAINING, TESTING, AND DEVELOPMENT
Training will be arranged for SIKA AUSTRALIA PTY LTD personnel as appropriate to their
duties. This will include:
a) Induction Safety Training for all personnel includes emergency and pollution incident
response and evacuation.
b) Specialized training for operational personnel in local safety facilities.
c) Other training as relevant to their duties in first response fire fighting, first aid, etc.
d) Emergency and pollution incident response training for their area, alarm activation.
Cooperative training will also be arranged as agreed with the External Emergency Services
especially the NSW Fire Brigade.
Additional training methods used include toolbox meetings. A toolbox safety meeting is a
means of transferring information to the employees and is normally facilitated by the Plant
Manager.
Meetings shall be brief and concise.
Toolbox meetings shall be held with relevant staff not less than once every month.
Changes to Plant & Equipment as well as any changes to operating procedures / work
instructions shall be discussed.
A small concise topic is to be presented for consultation and discussion, e.g. wearing
of safety glasses, housekeeping.
Staff shall be given the opportunity at the conclusion of the meeting to discuss.
The minutes of the toolbox meeting shall be recorded by the Site Manager at the
conclusion of the meeting.
To assist in evaluating the effectiveness of training, a system of regular review shall take
place in the form of Management Review. The Management Review Team shall review and
evaluate Safety, Health and Environmental performance and to identify both training needs
and any improvements to operations required to be made on the Site.
To further assist in maintaining staff competencies, Sika Australia Pty Ltd commits that
employees shall be appropriately trained and retrained to minimise the risk of errors.
Annual performance appraisals are conducted with the view to determining any training
needs for each staff member.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 74 of 107
The plan will also be tested every 12 months and within 1 month of a pollution incident
occurring to ensure that the plan is capable of being implemented in a workable and effective
manner. PIRMP was last simulated and tested on 23 October 2014.
Evaluation of the plan will be conducted through simulated emergency drills. Each drill will be
planned with at least one of the production areas so that the Site plan is evaluated for
consistency and compatibility. The drills will include fire/emergency alarm testing, emergency
and pollution incident response testing, spill response testing, and the testing of other potential
emergencies. The plan will be reviewed and revised and the effectiveness of the training used
will be determined as a result of the test.
The drills will be conducted annually. The co-ordination of the drill is the responsibility of the
Operations Manager.
Records of these drills, including date of drill, name of staff member who carried out the testing,
and the location of the drill, will be kept in the prescribed format, a copy found in Appendix 11.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 75 of 107
15.0 REVIEW AND REVISION
15.1 REVISION
This Site Emergency and Pollution Incident Response Management Plan shall be revised at
yearly intervals. Reviews shall be the responsibility of the Operations Manager and will be
conducted each after the simulated emergency exercise. This will ensure that the plan is
accurate and up to date.
The annual update may include items discussed in management meetings, which may require
further discussion before these can be resolved and included in the PIRMP.
The following list of issues and aspects on Site contains the currently discussed topics for
consideration to be included in the PIRMP:
More simulator type tests for spills – this would simulate the reaction of staff upon a spill
incident;
More routine Tool Box talks – routine Tool Box talks promotes proactivity in the
workplace;
Monthly Meetings involving all Production Staff – this allows for any suggestions to be
included, including environmental hazard-related incidents that could be incorporated
into the PIRMP;
Routine check to ensure spill kits are adequately filled up and maintained well, all the
time – this allows for a single point responsibility. The appointment of responsibility is yet
to be determined.
Maintenance of the main storm water valve – A recognised drain and plumbing
Company carries out the planned maintenance of the storm water valves in order to
maintain its good working condition.
15.2 TESTING
Testing is established by performing Simulated Emergency Exercises. This would be conducted
on an annual basis as per the relevant legislative requirements.
For the simulation of the emergency exercise, the Operations Manager shall either conduct the
testing by:
Himself with an appointed team of staff from SIKA AUSTRALIA PTY LTD, by performing
an emergency drill, which will be similar to a fire drill but would be of a pollution nature;
or
Through a consultant, who will then formulate an emergency scenario and shall direct
the emergency drill along with an appointed team of staff from SIKA AUSTRALIA PTY
LTD.
The following table provides a list of simulated emergency exercises established to date:
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 76 of 107
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 77 of 107
Table 15.1: Historical List of Simulated Emergency Exercises – SIKA AUSTRALIA PTY
LTD (Wetherill Park)
Date Time Scenario
Outcomes of the
Exercise
23 October
2014
2.00 PM Spill All Emergency
Procedures were
satisfactorily
executed.
13 November
2014
11.00 AM Fire All Emergency
Procedures were
satisfactorily
executed.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 78 of 107
16.0 BOMB THREATS
A bomb threat is a notice received by any means, of any explosive device or bomb said to have
been placed, or found to be anywhere on Site.
While most bomb threats are hoaxes, every one must be taken seriously.
If found:
a) Do not touch, tilt or otherwise tamper with the object, whether it is a bomb,
improvised explosive device (IED) or whatever.
b) Immediately evacuate the area surrounding the object.
Consider the consequential damage and effect - both on Site - if process equipment,
storage or pipelines are involved.
Use the following guidelines:
i) In Building
Evacuate the area concerned as well as floors above and below. Commonsense must
prevail in areas such as open courtyards or where extremely large or very small objects
are located. The possibility of shrapnel must be considered. Consider
consequences if pipelines or process vessels are involved.
ii) Open Areas
Evacuate all persons to a safe distance - at least one hundred metres. Consideration
must be given to the size of the object and the possibility of shrapnel.
Safety perimeters must be maintained until the device is rendered safe. The person
taking such observations should remain in the safety area and approach police upon
their arrival to supply all details of information.
iii) Notify Police simultaneously with the commencement of evacuation. This could be done
by telephone 000.
iv) Take Observations
Quick detailed observations should be taken on a suspected IED. Time spent near an
IED must be kept to a minimum.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 79 of 107
Observations should include:
Exact location and proximity to hazards such as dangerous chemicals or
flammable substances
Size, shape and colour of object
Any writings or labels appended to the device
Any other peculiarities
Police will, upon their arrival, coordinate and control all necessary procedures.
v) Received by Phone
The "Bomb Threat" card is to be used for any person who may receive a
telephoned bomb threat. This lists all the possible information that should be
obtained from the caller (Refer APPENDIX 9).
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 80 of 107
17.0 APPENDICES
1. Site Locality and Plan
2. Bund Areas and Dangerous Goods Locations
3. Injury/Accident Facilities
4. Fire Services
5. Site Drainage
6. Fire Detection Zones
7. Evacuation Routes and Assembly Areas
8. Neighbour locations and contact numbers
9. Bomb Threat Checklist
10. Emergency Control Organisation Roles & Responsibility
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 81 of 107
Appendix - 1
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 82 of 107
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 83 of 107
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 84 of 107
Appendix - 2
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 85 of 107
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 86 of 107
Appendix - 3
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 87 of 107
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 88 of 107
Appendix - 4
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 89 of 107
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 90 of 107
Appendix - 5
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 91 of 107
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 92 of 107
Appendix - 6
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 93 of 107
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 94 of 107
Appendix - 7
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 95 of 107
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 96 of 107
Appendix - 8
NEIGHBOURS ADDRESS TELEPHONE CONTACT
Chattanooga
Whiteley 65 Elizabeth Street 9756 0166 Paul Whiteley
Forza
Performance 3/65 Elizabeth Street 9756 4366 Sal / Tony
Quality Services 4/65 Elizabeth Street 9756 6440 Sharon / Jason
Allpine Furniture 5/65 Elizabeth Street 9756 4610 Allan Lor
Hughes Storage 7/65 Elizabeth Street 9756 4150 Graham Dickson
S.C.G. Benchtops 10/65 Elizabeth Street 9756 4123 Jammy Wade
TEID Pty Ltd 11/65 Elizabeth Street 9756 5236 Rick Nicholson
SIKA 12/65 Elizabeth Street 9757 5623 B Gajendra
Ayer’s Tooling 50 Elizabeth Street 9757 1011 Jan
KJE Electrics 48 Elizabeth Street 9756 3466 Michael Dimech
LWRED
Sportswear 46 Elizabeth Street 9756 2333 Lyn Hailes
DNA Motor Sport 13/38 Elizabeth Street 9756 0362 Nandu
Toms One Stop 11/38 Elizabeth Street 9725 4424 Tom
AFA Sheetmetal 8/38 Elizabeth Street 9756 1676 Julian
New Age
Automotive 6/38 Elizabeth Street 9756 2816 Claudio
NH Engineering 4/38 Elizabeth Street 9725 4484 Nick
Sydney
Concretors 1 Hargraves Place 9756 4688 Mark
SIKA 26 Hargraves Place 9757 5623 B Gajendra
Colour Dispersion 25 Hargraves Place 9756 4511 Liz
Abstract
Aluminium 24 Hargraves Place 9725 2844 Carl
Trimore Pty Ltd 3 Hargraves Place 9756 4077 George
Ron Bartlett’s Auto 4 Hargraves Place 9756 1177 Robert
AB Steel
Fabrication 2/23 Hargraves Place 9756 1882
Pacific Cement 1/23 Hargraves Place 9756 1637 Fred
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 97 of 107
NEIGHBOURS ADDRESS TELEPHONE CONTACT
Products
SWF Simplywood 22 Hargraves Place 9756 0866 Michael
AllFab Metal 5 Hargraves Place 9754 3210 Frank
Superior Rubber 6 Hargraves Place 9757 2800 Kid Sly
Contemporary
Carpet
21 Hargraves Place 9725 2499 Ernie
Megatek
Engineering
20 Hargraves Place 9756 6233 Sam
Baker Power
Steering
8 Hargraves Place 9756 2566 Billy
Amity Plastics 19 Hargraves Place 9756 1424 Yvonne
Aitken Engineering 2/9 Hargraves Place 9725 1332 Andy
Greg Houston
Plumbing
1/9 Hargraves Place 9756 1623 Jessica
Xtreme Smash
Repairs
10 Hargraves Place 9609 1566 Phillip
The Nutrition Link 13 Hargraves Place Pam
C&M Stainless
Fabrications
15 Hargraves Place 9757 3040 Craig
Macarthur Gas 16 Hargraves Place 8786 3800 Denis
Auto Electrical
Services
17 Hargraves Place 9756 2515 Neil
Rios Wreck 1/17 Hargraves Place 9756 5005 Jose
Cleopatra 12 Hargraves Place 9609 6668 Teresa
SENSITIVE AREAS LOCATION TELEPHONE CONTACT
Prospect Creek 1 km N N/A N/A
Mar-Rong Reserve 1.2 km NE N/A N/A
Prospect Reservior 2 km NW N/A N/A
Chua Phươc Huê - Phuoc Hue Buddhist Temple
295 Victoria Street,
Wetherill Park NSW
2164
9725 5719 N/A
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 98 of 107
SENSITIVE AREAS LOCATION TELEPHONE CONTACT
Autism Association
of NSW Western
Sydney School
295 Victoria Street,
Wetherill Park NSW
2164
9725 5719 N/A
Stockland Shopping
Centre
561 – 583 Polding
Street, Wetherill
Park
9609 7766
N/A
In the event of smoke/fumes going in the direction of neighbours, the instruction
would be to turn off air conditioning and evacuate staff up wind.
Source: Spatial Information eXchange Viewer, Aerial Map, Department of Lands, 2008
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 99 of 107
Source: Spatial Information eXchange Viewer, Aerial Map, Department of Lands, 2008
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 100 of 107
Appendix - 9
AUSTRALIAN BOMB DATA CENTRE
AUSTRALIAN FEDERAL POLICE HEADQUARTERS, CANBERRA, ACT
PLACE THIS CARD UNDER YOUR PHONE
BOMB THREAT CHECKLIST
Questions to ask:
When is the bomb going to explode?
In which building?
Where is the bomb located?
When was the bomb put there?
What does the bomb look like?
What kind of bomb is it?
What will make the bomb explode?
Did you place the bomb?
Why did you place the bomb?
What is your name?
Where are you?
What is your address?
EXACT WORDING OF BOMB THREAT:
…………………………………………………………………………………………
…………………………………………………………………………………………
…………………………………………………………………………………………
…………………………………………………………………………………………
…………………………………………………………………………………………
ACTION:
…………………………………………………………………………………………
…………………………………………………………………………………………
………………………………………………………………………………………….
………………………………………………………………………………………….
Report call immediately to: Fairfield Police Station – Ph. (02) 9728 0399
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 101 of 107
REMEMBER – KEEP CALM, DON’T HANG UP
BOMB THREAT DATA
CALLER’S VOICE:
Accent (specify): ……………………………………………………………………..
Any speech impediment (specify): …………………………………………………
Voice (loud, soft, etc): ……………………………………………………………….
Speech (fast, slow, etc): …………………………………………………………….
Diction (calm, muffled, etc): ………………………………………………………...
Manner (calm, emotional, etc): …………………………………………………….
Did you recognise the voice?
If so, who do you think it was?
Was the caller familiar with the Site / area?
THREAT LANGUAGE
Well spoken: …………………………………………………………………………
Incoherent; …………………………………………………………………………..
Irrational: ……………………………………………………………………………..
Taped: ………………………………………………………………………………..
Message read by caller: ……………………………………………………………
Abusive: ………………………………………………………………………………
Other: …………………………………………………………………………………
BACKGROUND NOISES
Street noises: ………………………House noises: …………………………….
Aircraft noise: ………………………Traffic noises: ……………………………..
Voices: ………………………………Local call: ………………………………….
Music: ……………………………….Long distance / STD: ……………………
Machinery: …………………………Other: ………………………………………
OTHER
Sex of caller:…………………………... Estimated Age:………………………..
CALL TAKEN
Date: …………………………….. Time: ……………………………………….
Duration of call: ……………………………………………………………………
Number called: …………………………………………………………………….
Number appearing on screen: ……………………………………………………
RECIPIENT
Name (print): ………………………………………………………………………..
Telephone number: ………………………………………………………………..
Signature: ………………………………………………….………………………..
REMEMBER – KEEP CALM, DON’T HANG UP
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 102 of 107
Appendix - 10
SITE EMERGENCY CONTROL ORGANISATION
POSITION &
L0CATION
NAMES OF WARDENS DEPUTIES /
WARDENS
Chief Warden
Michael Siely / Gajendra Balabaskara Gary Boon
Communication Officer Lisa Scobie Christine Khairy
Area Warden
(HO Building) Mahesh Choudhary Ana Simeonovic
Area Warden
(All laboratories and
Raw Materials Ware
house)
Greg Langton Michael Farah
Area Warden
(Resin Plant &
Coatings)
Mohammad Popal (Hasim) Marcus Watts
Area Warden
(Admixture/ Viscocrete
and Colour Plant)
Paulo Vong Vasu Dewan
Area Warden
(Finished Goods
Warehouse)
Francis Constantine Neru Vaa
Area Warden
(NSW Sales and
Operations Office)
Michael Siely Sue Zikovski
Area Warden,
(Marketing
Office 26
Hargraves Pl.)
Jenny Perello Glen Alcock
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 103 of 107
POSITION &
L0CATION
NAMES OF WARDENS DEPUTIES /
WARDENS
First Aiders – 55
Elizabeth St Heather Paull Ana Simeonovic
First Aiders – 18
Hargraves Pl Colleen Howard Paul Orbe / Neru
Vaa / Francis Con
First Aiders: Resin
Area, Lab and Admix Qurban Fahez / Ray Bigeni Mohammed Rafikh
/ Michael Farah
First Aiders: Marketing
Office 26 Hargraves
Place.
Jenny Perello Glen Alcock
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 104 of 107
RESPONSIBILITIES
Chief Warden
ON BECOMING AWARE OF AN EMERGENCY OR POLLUTION INCIDENT:
Ascertain the nature of the emergency or pollution incident and determine
appropriate action
Activate Emergency and Pollution Incident Response Management Plan if
determined necessary and manage response appropriately
Ensure the appropriate emergency service and relevant authorities have been
notified
Ensure that the floor and/or area wardens are advised of the situation
If necessary, initiate evacuation and control entry to the affected areas
Ensure the progress of the evacuation and any action taken is recorded in an
Incident log
Brief the emergency services personnel upon arrival on type, scope and location
of the emergency and the status of the evacuation and, thereafter, act on the
senior officer’s instruction
Deputy Chief Warden
The deputy chief warden shall assume the responsibilities normally carried out by the chief
warden if the chief warden is unavailable, and otherwise assist as required.
Communications officer
The communications officer, on becoming aware of the emergency, shall take the following
actions:
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 105 of 107
Ascertain the nature and location of the emergency
Confirm that the appropriate emergency service has been notified.
Notify appropriate ECO personnel either by the EWIS or other means.
Transmit and record instructions and information between the chief warden and
the floor wardens and occupants.
Maintain a log of the events.
Act as directed by the chief warden
Floor or Area Wardens
On hearing an alarm or on becoming aware of an emergency, the floor or area wardens
shall take the following actions:
Implement the emergency procedures for their floor or area.
Ensure that the appropriate emergency has been notified
Direct wardens to check the floor or area for any abnormal situation.
Commence evacuation if the circumstances on their floor or area warrant this.
Communicate with the chief warden by whatever means available and act on
instructions.
Advise the chief warden as soon as possible of the circumstances and action
taken.
Co- opt persons as required to assist a warden during an emergency.
Confirm that the activities of wardens have been completed and report this to the
chief warden.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 106 of 107
Wardens
Persons selected as wardens may be required to carry out a number of activities including
the following:
Act as floor or area wardens
Ensure that the appropriate emergency service has been notified.
Operate the intercommunication system.
Check to ensure fire doors and smoke floors are properly closed.
Search the floor or area to ensure all persons have evacuated.
Ensure orderly flow of persons into protected areas, e.g. stairwells.
Assist persons with disabilities.
Act as leader of groups moving to nominated assembly areas.
Report to the floor or area warden on completion of required activities.
First Aid Personnel
First aid personnel should provide first aid assistance to injured persons
On hearing an alarm or on becoming aware of an emergency, the floor or area wardens
shall take the following actions:
Collect First Aid Kit
Proceed to EMERGENCY ASSEMBLY POINT
Provide First Aid (as required)
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 107 of 107
Appendix - 11
Plan Testing Procedure
Issue Date: 20/08/12 Supersedes Date: N/A
Distribution: Chief Warden, Operations Manager, Site Manager
Testing
Interval Exercise
Production
Area
Person
Responsible
Date
Completed
12
Monthly Emergency Drill, Review, and Revision
12
Monthly Emergency Drill, Review, and Revision
12
Monthly Emergency Drill, Review, and Revision
12
Monthly Emergency Drill, Review, and Revision
12
Monthly Emergency Drill, Review, and Revision
12
Monthly Emergency Drill, Review, and Revision
EMERGENCY DRILL MAY INCLUDE:
SPILLS
FIRE AND EXPLOSION
BOMB THREATS
POLLUTION INCIDENT
MEDICAL EMERGENCY
ETC
ALL OPERATORS TO ATTEND ATLEAST ONE EXERCISE DURING THE YEAR
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 108 of 107
Appendix - 12
Notification of a Pollution Incident Procedure
Issue Date: 20/08/12 Supersedes Date: N/A
Distribution: General Manager, Management Team and Chief Warden
PURPOSE
The purpose of this procedure is to give clear instructions regarding who to notify during a
pollution incident that is assessed to present a risk of material harm to the environment.
METHOD
A flowchart is provided on the following this procedure.
First Point of Contact:
1. An event occurs which you believe presents an immediate threat to human health or
property. Stop work and activate fire alarm by breaking the alarm glass. The alarm will
then notify the Fire Brigade, Directly. Also you may:
Call 000
If the incident does not require an initial combat agency, or once the 000 call has been
made, notify the relevant authorities listed below.
2. If there is no immediate threat to human health or property, follow the relevant internal
procedure.
Notification of Regulatory Authorities (EMERGENCY COORDINATOR):
1. If the event is causing or threatening material harm to the environment, the Chief
Warden shall contact the regulatory authorities in the following order:
NSW EPA – 131 555
Fairfield City Council – 9725 0222
The Ministry of Health – 9515 9420 (after hours: 9515 6111 - ask for Public Health Officer on call)
WorkCover Authority – 13 10 50
Fire and Rescue NSW – 000
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 109 of 107
Note: “material risk of harm to the environment” needs to be notified if:
It involves potential harm to the health or safety of human beings or ecosystems that is
not trivial; or
It results in loss of property damage exceeding $10,000;
Loss includes costs incurred in taking all reasonable measures to prevent or mitigate
harm to the environment.
2. Notify any persons as requested by the NSW EPA.
3. What to Notify
your full name, address and telephone contact details
date, time and duration of the incident
the type of pollutant or a description of the incident
discharge or emission location of the incident
the extent or size of the area where the pollution is occurring
anything else that is relevant to the incident
Notifying Neighbouring Properties:
1. If the incident has a risk on human health or the environment external to the Site, early
warnings and regular updates are to be provided to any premises likely to be affected.
The Chief Warden will need to assess the situation and liaise with emergency services
to determine:
Who to contact
What information needs to be provided, and
The appropriate method for communication.
The nearest neighbouring facilities have been identified in Appendix 8 of the Emergency
and Pollution Incident Management Response Plan.
Methods of communication include one or a combination of the following:
Telephone calls (primary method);
Incident notifications on the company Web Site;
Letterbox drops; or
Door-knocking
Written Report:
An incident report will be prepared and provided to all of the above regulatory authorities
within 7 days of the incident. Refer to the Site Environment Protection Licence (EPL) for
information required to be included in the report.
Emergency Plan & PIRMP
Wetherill Park NSW
Date Implemented:
Version No.:
Date To Be Reviewed:
Approved By:
15/01/08
03
20/03/16
OM
Process Owner: OM ***This is an uncontrolled copy of a controlled document printed 13/05/15*** Page 110 of 107
Develop and implement a follow up action plan in consultation with relevant regulatory
authorities.
FLOWCHART: NOTIFICATION OF A POLLUTION INCIDENT
Pollution incident occurs
Does the incident pose an immediate
threat to human health or property?
Call 000
YES NO
Call Site Contact:
Site Emergency: 9
Operations Manager: 0408 248 062
YES
NO
Emergency Coordinator to call relevant
regulatory authorities immediately in the
following order:
NSW EPA – 131 555
Fairfield City Council – 9725 0222
The Ministry of Health – 9515 9420
(after hours: 9515 6111 - ask for Public
Health Officer on call)
WorkCover Authority – 13 10 50
Fire and Rescue NSW – 000
Notify all information known about incident.
Contact and notify any persons as requested
by the NSW EPA.
Provide written notification to all of the above
regulatory authorities within 7 days of the
incident (information to be included is provided
in the EPL).
Develop and implement a follow up action plan
in consultation with relevant regulatory
authorities.
Is incident causing or
threatening material harm?
Notification to
authorities is not
required.
Does incident pose threat
to neighbouring
properties?
YES
NO
Chief Warden and Emergency Team liaises with
emergency services and communicates details of
the incident to neighbouring properties that may
be affected
Follow relevant
SIKA internal
procedure.
top related