edmcal: processing edm calibrations in nswlocate’14, canberra, 7– 9 april 2014 14 conclusion •...

Post on 18-Apr-2018

216 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

EDMCAL: Processing EDM Calibrations in NSW Volker Janssen & Tony Watson Survey Infrastructure and Geodesy

Research@Locate’14, Canberra, 7–9 April 2014 2

Outline • Current EDM baseline infrastructure in NSW. • EDMCAL software. • UNSW spreadsheet. • Comparison of EDMCAL & UNSW spreadsheet. • Online EDM baseline booking system. • Conclusion.

Research@Locate’14, Canberra, 7–9 April 2014 3

Current EDM Baseline Infrastructure

Research@Locate’14, Canberra, 7–9 April 2014 4

EDMCAL • Determines dist, AC & SF. • Originally written at UNSW in 1978 & modified at LPI. • Current version created in Dec 2013.

P1 HI P2 HT SD Press Temp

Research@Locate’14, Canberra, 7–9 April 2014 5

EDMCAL Processing • Input file checked for #pillars & #obs. • Obs’d SDs (d1) reduced to HDs at height of lowest pillar:

• 2nd veloc corrn ignored (insignificant over such dist).

• Wave path arc to chord (d1d2) reduction also insignificant.

approx. AC input by user

1st veloc: ambient atm conditions

slope wave path chord HD at mean elev

HD at mean elev chord dist at lowest pillar elev

chord dist at lowest pillar elev (d3) arc (d4)

Research@Locate’14, Canberra, 7–9 April 2014 6

EDMCAL Processing • STD of obs computed. • Formation & soln of normal matrix. • Output of calibration results

& data snooping. • LS adjustment based on

reduced distances to solve for dist from pillar 1 and AC.

• 1D similarity trafo using calibrated dist as coords to solve for SF.

Research@Locate’14, Canberra, 7–9 April 2014 7

EDMCAL Processing • Output summary:

AC SF

Research@Locate’14, Canberra, 7–9 April 2014 8

UNSW Spreadsheet

• Developed by B. Harvey in 2006. • Determines AC & SF via LS for

4-8 pillar baselines. • Cyclic error example included.

Note: • Requires rel. humidity as input. • Requires met data to be corrected before input.

Research@Locate’14, Canberra, 7–9 April 2014 9

Datasets • 25 LPI baseline verification datasets:

Wollongong: 600 m Kingscliff: 721 m Wagga: 535 m Eglinton: 849 m Dubbo: 765 m Lethbridge Park: 984 m

Instrument: Leica TCA2003 (2000-10) ... 1.0 mm + 1 ppm Leica TS30 (2011+) ... 0.6 mm + 1 ppm

Research@Locate’14, Canberra, 7–9 April 2014 10

Comparison: AC ~0.3 mm ~0.3 mm <0.8 mm 0.1 mm

Research@Locate’14, Canberra, 7–9 April 2014 11

Comparison: SF ~0.5 ppm ~0.5 ppm ~1.5 ppm ~0.5 ppm

Research@Locate’14, Canberra, 7–9 April 2014 12

Comparison: Distances • Diff in distances from pillar 1 in mm (AC & SF applied):

High level of agreement. Differences negligible for most

EDM calibrations in practice.

Research@Locate’14, Canberra, 7–9 April 2014 13

Online Baseline Booking System

• Automatic booking confirmation email. • User to carry printout while on site. • Efficient use of baselines. • More informed decision making at LPI.

http://lpi.nsw.gov.au/edmbooking

Research@Locate’14, Canberra, 7–9 April 2014 14

Conclusion • LPI continues to improve EDM baseline infrastructure. • EDMCAL & UNSW spreadsheet provide comparable

EDM calibration results (AC & SF). • Important to use latest verification data as ‘known’ inter-

pillar distances to obtain reliable calibration results. • Standard EDM calibration in prism mode does

not calibrate reflectorless EDM laser. • Beware of dist extrapolation.

• EDM baseline booking system please use it!

Research@Locate’14, Canberra, 7–9 April 2014 15

top related