e-mail: breiling@breiling.org may 27th, 2005regional landscape planning: short term processes short...

Post on 25-Dec-2015

215 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Short Term Landscape Processes & Understanding of

PlanningLecture 4 „Regional Landscape

Planning“May 27th, 2005www.breiling.org/awaji

E-mail: breiling@breiling.org

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Humans and Space

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Awaji Shima Region

Awaji Shima Region

Smaller ScalesLarger Scales

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Awaji Shima Region• ~ 600 km²• ~ 150,000 inhabitants• Larger spatial scales

– Hyogo ken– Kinki region– Japan– East Asia– Eurasia– World

• Smaller spatial scales– Municipalities (gun)– Settlement area (cho)– village (machi)– Places– Private units

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Relation local, regional, global

– Region is characterized• By smaller local units• By larger global unit

– Regional (local, global) state• (infa-) structure within the

region

– Regional (local, global) use• Economy• Ecology• Quality of life

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Long-, medium-, short- term processes

• Processunderstanding of Landscape– Long term > 100 years steps of change– Medium term < 100 years, > 1 year changes– Short term < 1 year processes

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Long term processes• Long term processes

– Geology– Climate– Soil– Water System– Vegetation– Animal Life

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Medium term processes– Political administration (cho, machi, sanchome)– Demographic trends – Land use

• Agriculture• Tourism• Roads and trafic infrastructures• Settlement areas

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Short term processes

• Energy use• Greenhouse gases• Water use• Waste generation• Human inputs in agriculture• Working hours in agriculture

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Landscape & Time• Landscape is dynamic

– Arena for all processes – Landscape changes continuously

• State and Use– Longer processes generate the „state“ (Structure

Infrastructure) for the „use“ in shorter processes– What is state and what is use depends on our interest

• Human Understanding of Landscape Processes– Long term processes are perceived as stable/non dynamic– Medium term processes depend on long term processes,

generate (infra-) structure for human beings– Short term processes describe human actions within a year

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Anticipated Processes: Cyclic• Cyclic means that the pattern of change is known and

repeated on regular base (can be anticipated)– Decades: harvesting of trees, perhaps climate variations,

appearance of Feb. 29th – Years: harvesting of field fruits– Seasons: spring, summer, autumn, winter– Month: salaries– Week: weekdays, weekend– Day: morning, noon, afternoon, evening, night

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Anticipated Processes: Non Cyclic• Non-cyclic where the pattern of change is known: Growth and

Decline– Centuries: waves of earthquakes and vulcanos – Decades:

• perhaps human induced climate change, • life periods such as childhood, youth, young adult, family start, family peak,

career peak, agil pensionist, pensionist, • plant growth states of higher plants, availability of resources

– Years: Investments and loans, – Seasons: extreme (summer) heat, extreme (autumn) thyphoons,

extreme snow (winter) or floodings etc.– Month: amount of salaries– Week: visitors of touristic spots on weekdays, weekend– Day: the menue in ALPHA cantine

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Non Anticipated Processes: Surprises regarding Natural System

• Not experienced before – Not included in planning & management

• Climate change– Impacts of climate changes– Directions of climate changes

• Acid deposition, forest die-back, fish dying• Chemical time bombs

– Colloid chemical compounds and pH change• Manipulated genes?

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Non Anticipated Processes: „Surprises“ regarding Social System

• Rural depopulation• Population decrease in developed world• Aged population, perhaps break down of social

system• New power of kids as consumers

– Several old people to support one kid in shrinking societies

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Planning and Management

• Is like riding a bicycle– Foreseen cyclic processes of wheels– Unforeseen but expected disturbances

when passing hinders

• Surprises are: a jump into the water– Planning and management in a changed

context• The road beneath does no longer exist• Learn how to fly or• Learn to swim

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Awaji Shima

Factors of Influence• Exogenous factors

from outside• Endogenous factors

from inside• Physical, chemical,

biotic stressfactors• Socio-economic

political stressfactors

Breiling after Döös 1992

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Consequences for our region “Awaji shima”

• There is not a single threat or challenge• But a combination of many factors• Difficult to judge the weight of a single factor• General rules

– Local concern can counter exogenous threats– Exogenous threats are enhanced if ignored locally– We cannot foresee the future, surprises inevitable– More planning better than less planning

• Surprises become less likely

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

The Planning Process

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Planning• Deals with simplified reality

• Is a “model of expected truth”

• Assumes a system of influencing factors– Similar to my figure of stressfactors

• Neglects everything not considered

• Then we start circulation in our system and improve performance to a wanted output (and get perhaps an unwanted output)

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Short Term Processes• Give a current picture of Awaji

shima regarding– Energy in agriculture/tourism (Group 1)– Greenhouse gases in agriculture/tourism (Group 2)– Water use in agriculture/tourism (Group 3)– Waste generation and making compost (Group 4)– Land demand of agriculture/tourism (Group 5)– Working hours/occupation in agriculture/tourism

(Group 6)

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Trends in Japanese Rice Production

0

1000

2000

3000

4000

5000

6000

y1960 y1965 y1970 y1975 y1980 y1985 y1990 y1995

Average Yield in kg/ha

Rice area in 1000 ha

Total Supply in 10,000 tons

Average per caputa consumtion in 0.1 kg

Source: Agricultural Census of Japan

Changes in Japanese Agriculture: Rice

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Changes in Japanese Agriculture

Source: Agricultural Census of JapanCited by : S. Hasegawa, T. Tabuchi (1995). Well Facilitated Paddy Fields in Japan.

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Number of urban households is rapidly increasing

Share of Agricultural Households Against Others (in 1000)

Number Households Total Agricultural Mixed Agricultural

Non Agricultural No workers

1980 35824 1360 2131 28972 3311

1985 37980 1210 1954 30400 4344

1990 40670 993 1596 32568 5357

1995 43900 935 1379 34464 6902

Source: Japan Statistical Yearbook 1998, National Census data

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Number of agricultural households decreases

Share of Full Time and Part Time Farm Households 1960 to 1995 (in 1000)

Number Households Total Full time Part time

1960 6057 2078 3979

1965 5665 1219 4446

1970 5342 831 4510

1975 4953 616 4337

1980 4661 623 4038

1985 4376 626 3750

1990 3835 592 3243

1995 2651 428 2224

Source: Japan Statistical Yearbook 1998, Agricultural Census data

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Income in agriculture only small portion

Table 3 Income Source of Agricultural Households

Year Agricultural Income

Non Agricultural Income

Total Share of agricultural income

1965 365 396 761 48%

1970 508 885 1393 36%

1975 1146 2268 3414 34%

1980 952 3563 4515 21%

1985 1066 4437 5503 19%

1990 1163 5438 6601 18%

1995 1442 5453 6895 21%

Source: Asahi Shinbun 1999, Agricultural Census data

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Agriculture a female profession?

Table 4 Occupation in Agriculture (in 10,000)

Farm Occupants in 10.000 total female Share of female

t1965 1152 695 60%

t1970 1025 628 61%

t1975 791 493 62%

t1980 697 429 62%

t1985 636 388 61%

t1990 565 340 60%

t1995 490 286 58%

 

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.orgWill rural disappear in a non distant future?

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Will there be someone working in fields?

• Source: S. Hasegawa, T. Tabuchi (1995). Well Facilitated Paddy Fields in Japan.

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Increase in Machinery Use

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Fertilizer Use in Agriculture

Source: G. Ahamer (1995). Global Change Data Base

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Energy Input in Agriculture

Source: G. Ahamer (1995). Global Change Data Base

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Change in Diet

Source: G. Ahamer (1995). Global Change Data Base

May 27th, 2005

Regional Landscape Planning: Short Term Processes

E-mail: breiling@breiling.org

Conclusion• Structure and Processes change over time

• Long term processes provide structure for medium term processes

• Medium term processes provide structure for short term processes

• Performance of short term processes is relevant for environmental quality

• Resource flow determines processes

top related