uap proprac - baixardoc
Post on 13-Mar-2023
1 Views
Preview:
TRANSCRIPT
UAP DOCUMENTS
I. A. FILL IN THE BLANKS
1. Philippine Architects Society
2. highest integrity
3. business capacity
4. artistic ability
5. technical ability
6. suspicion
7. unprejudiced
8. impartiality
9. moral
10. public
11. motives
12. conduct
13. sense of moral values
14. ability
15. promotional
16. construction phase
17. contract documents
18. Certificate of Payment
19. eight (8)
20. ten (10)
21. twelve (12)
22. P200.00
23. five (5)
24. fifteen (15)
25. thirty five (35)
26. eighty five (85)
27. owner
28. P500.00
29. five (5)
30. ten (10)
31. five (5)
32. fifteen (15)
33. Republic Act 545
34. Presidential Decree 49
35. full-time construction inspectors
I. B. FILL IN THE BLANKS
1. Time
2. technology
3. well-planned
4. soundly constructed
5. aesthetically satisfying
6. financial limitation
7. specialized allied services
8. physical environment
9. consultant
10. civic or charity
11. technical information
12. experience
13. unity
14. civic
15. specialization
16. good faith
17. abstract ideas
18. physical world
19. conferences
20. deliberations
21. discussions
22. evaluations
23. investigations
24. consultations
25. scientific
26. aesthetic
27. orderly
28. man-made
29. sound
30. fifteen (15)
I. C. FILLING IN THE BLANKS
1. Cost of the work
2. Landscape Design Services
3. Acoustic Communication and
Electronics Engineering Services
4. Human behavior
5. economic systems
6. laws and regulations
7. tax structures
8. infrastructure
9. utilities
10. P3,000.00
11. P2,000.00
12. Comprehensive Planning
Services
13. environmental planner
14. comprehensive planning services
15.
professional fee plus expenses
16. multiple of direct personal
expense
17. construction manager
18. post construction services
19. project management
20. lump sum
21. revolving capital
22. Architects National Code
23. human experience
24. physical world
25. culture
26. national aspirations
27. environment
28. time
29. Pre-Design Services
30. Group 2
I. D. FILL IN THE BLANKS
1. pre-design
2. construction
3. specialized allied
4. construction
5. post-construction
6. twenty (20)
7. one (1)
8. one and one half ( 1 ½)
9. eighty five (85)
10. fifty (50)
11. P500.00
12. contractor or successful bidder
13. surety
14. contractor
15. owner
16. fifteen (15)
17. three (3)
18. highest
19. ethical conduct
20. excellence
21. Board of Architects
22. Architecture
23. contract document
24. Pre-design services
25. Guarantee bond
26. competition code
27. Design Build Services
28. three (3)
29. seventh (7th
)
30. Critical Path Method
I. E. FILL IN THE BLANKS
1. General conditions
2. United Architects of the
Philippines (UAP)
3. Philippine Institute of Civil
Engineers (PICE)
4. Philippine Contractor’s Association (PCA)
5. Contract Documents
6. Act of God or Force Majeure
7. work
8. General Contractor
9. UAP Committee on Professional
Practice and Ethics
10. Inter-Professional Conference
Committee
11. drawings
12. specifications
13. furnish
14. ninety eight (98)
15. specifications
16. Special provisions
17. complementary
18. labor and materials
19. equipment
20. transportation
21. install
22. provide
23. fifty meters
24. water
25. light
26. telephone
27. toilet facilities
28. sixty days
29. fifteen (15)
30. Notice to Proceed
I. F. FILL IN THE BLANKS
1. Design Services/Basic Services
2. adviser
3. periodic visits
4. eighty five (85)
5. ten (10)
6. five (5)
7. instrument of service
8. Cost of expenses
9. summary of cost
10. architect
11. engineer
12. contractor
13. owner
14. fifteen (15)
15. prime professional
16. Full time supervision
17. Construction Management
18. Administration
19. Guaranteed Maximum Cost
20. in-house architect
21. full time supervision
22. construction inspector
23. fifteen (15)
24. fifteen (15)
25. thirty (30)
26. Bid contract
27. Negotiated Contract
28. People
29. client
30. contractor
31. manufacturers, dealers and
agents
32. colleagues and subordinates
33. civic
34. moral
35. administrative matters
36. technical matters
37. legal
38. Architecture
39. Construction
40. Pre-design services
I. G. FILL IN THE BLANKS
1. fifteen
2. contractor
3. architect
4. architect
5. fifteen
6. Certificate of Payment
7. Certificate of Payment
8. fifteen (15)
9. fifteen (15)
10. once
11. Retention money
12. ten (10)
13. fifty (50)
14. liquidated damages
15. Performance bond
16. five (5)
17. fifteen (15)
18. thirty (30)
19. thirty (30)
20. design services
21. basic services
22. Planning
23. ten to fifteen (10-15)
24. thirty (30)
25. fifty (50)
26. twenty (20)
27. ten to fifteen (10-15)
28. fifteen (15) and 12% to 20%
29. Design Competition
30. Percentage of Construction Cost
31. Multiple of direct personal cost
32. seven (7)
33. ten (10)
34. Specialized Allied
35. Post Construction
36. Construction
37. Comprehensive
38. Construction
39. Architectural Programming
40. PD No. 49 “Protection of Intellectual Property”.
I. H. FILL IN THE BLANKS
1. Pre-design services
2. Design Services
3. Specialized Allied Services
4. Construction Services
5. Post-construction services
6. Comprehensive services
7. Design build services
8. Interior Design
9. Acoustics, Communication and
electronics engineering
10. Landscape design
11. Physical Planning
12. Comprehensive Planning
13. Building and Equipment
Maintenance
14. Building and Ground
Administration
15. Post-Construction Evaluation
16. Architect
17. Architect
18. fifteen (15)
19. ten (10)
20. Breakdown of work and
Corresponding Value
21. Proposal bond
22. Contractor
23. Supplementary specification
24. 1%
25. 1 ½%
I. I. FILL IN THE BLANKS
1. plan
2. program
3. monitor
4. adviser
5. cost control
6. one and one half percent (1 ½%)
7. three percent (3%)
8. Scope of Work
9. Architects/Basic Services
10. architect’s fee & manner of payments
11. Pre-Design services
12. construction
13. specialized allied
14. construction
15. post-construction
16. fifty (50)
17. two (2)
18. five(5% )
19. eighty five (85)
20. fifty (50)
21. P 500.00
22. contractor or successful bidder
23. surety
24. contractor
25. Owner
26. fifteen (15)
27. three (3)
28. architect
29. contractor
30. project manager
31. consultant
32. construction manager
33. Ethics
34. Ethical conduct
35. people
36. client
37. contractor
38. agents
39. colleagues
40. subordinates
I. J. FILL IN THE BLANKS
1. lump sum
2. revolving capital
3. Architects National Code
4. Human experience
5. Critical Path Method (CPM)
6. coordinate
7. supervise
8. programs
9. plans
10. schedules
11. monitored
12. quality
13. records
14. change orders
15. payments
16. Project management
17. Project manager
18. Cosntruction manager
19. one (1)
20. one and one jalf (1 ½ )
21. Basic fee
22. six (6)
23. fifteen (15)
24. P500.00
25. eighty five (85)
26. contract documents
27. ten (10)
28. five (5)
29. fifteen percent (15%)
30. once
I. K. FILL IN THE BLANKS
1. Project construction cost
2. basic services
3. design services
4. Environmental planner
5. town and regional
6. urban renewal
7. master plan
8. Physical planning
9. Comprehensive Planning
Services
10. Planning
11. ten (10)
12. fifteen (15)
13. thirty (30)
14. fifty (50)
15. twenty (20)
16. ten (10)
17. fifteen (15)
18. fifteen (15)
19. twelve (12)
20. twenty (20)
21. ten (10)
22. fifty (50)
23. liquidated damages
24. Performance bond
25. fifteen (15)
26. fifteen (15)
27. thirty (30)
28. seven (7)
29. Instruction to bidders
30. Cost plus fixed fee
31. Cost plus percentage fee of cost
of the project
32. construction by administration
33. construction by management
34. Guaranteed Maximum Cost
35. Contractor
I. L. FILL IN THE BLANKS
1. Republic Act No. 545
2. Presidential Decree No. 49
3. Full time construction inspectors
4. Time
5. Technology
6. Well planned
7. Soundly constructed
8. aesthetically satisfying
9. financial limitation
10. Specialized allied services
11. physical environment
12. consultant
13. civic or charity
14. technical information
15. experience
16. unity
17. five (5)
18. ten (10)
19. five (5)
20. fifteen (15)
21. five (5)
22. fifteen (15)
23. thirty five (35)
24. eighty five (85)
25. contractor
26. P500.00
27. fifteen
28. contractor
29. architect
30. Certificate of Payment
II. A IDENTIFICATION
1. Economic Feasibility Study
2. Architectural Programming
3. Certificate of Payment
4. Architect
5. Owner
6. Project Construction Cost
7. Owner
8. Architecture
9. UAP Document No. 200
10. Standards of Professional
Practice
11. Physical Planning
12. Comprehensive Planning
Services
13. Environmental Planner
14. Owner
15. Contractor
16. General contractor
17. Project Management
18. Design Competition
19. Direct Selection
20. Comparative Selection
21. Professional fee plus expenses
22. Lump sum or fixed fee
23. Mixed Method of Compensation
24. UAP Document No. 203
25. UAP Document No. 208
26. Adherence to the principle of
Architects National Code of
Ethics
27. Architects Code of Ethics
28. United Architects of the
Philippines (UAP)
29. General Contractor
30. Cost of Work
II. B. IDENTIFICATION
1. General conditions
2. Contractor
3. Surety
4. Owner
5. Special Provisions
6. Proposal
7. Project Representative
8. Time Limits
9. Bid Bulletin
10. General Conditions
11. Payment Bond
12. Agreement
13. Guarantee Bond
14. Instruction to Bidders
15. Drawings
16. Specifications
17. Special Provisions
18. Breakdown of Work and
Corresponding Value
19. Contractor
20. Project Engineer or
Superintendent
21. Proposal Bond
22. Performance Bond
23. Supplementary Specifications
24. Written Notice
25. Local laws
26. Advertisement or Invitation
to Bidder
27. Contractor
28. Contractor
29. Unit price
30. 15%
II. C. IDENTIFICATION
1. Contractor
2. Owner
3. Architect
4. Retention fee
5. Guarantee Bond
6. Certificate of Payment
7. Surety
8. Arbitration
9. Liquidated Damages
10. Architect
11. Arbitration
12. Owner
13. Seven percent (7%)
14. Ten percent (10%)
15. Bid bulletin
16. Turn Key
17. Lump Sum
18. Owner
19. Working Drawings
20. Proposal
21. Install
22. Bid bulletin
23. Furnish
24. Contractor
25. Material Man
26. General conditions
27. Work
28. Time limit
29. Act of God or Force Majeure 30. Specifications
II. D. IDENTIFICATION
1. Guarantee Bond
2. 1 ½ % or 3%
3. 2% TO 5%
4. Administrative Contract
5. Management Contract
6. Guaranteed maximum and
percentage on savings
7. Lump sum Contract
8. Schedule of Detailed
Engineering Activities
9. Agency estimates
10. Bid/Tender Documents
11. Program of Work
12. Invitation to bidders
13. Bid bulletins
14. Bid bond
15. Performance Bond
16. Request for Payment
17. Retention fee
18. Liquidated damages
19. Contract Price Escalation Clause
20. Negotiated Contracts
21. Architect
22. As-built plans
23. Feasibility Studies
24. Specifications
25. Owner
26. Basic fee
27. January 17, 1975
28. Percentage of Construction Cost
29. Multiple of Direct Personal
Expense Method
30. Professional fee plus expenses
II. E. IDENTIFICATION
1. Schematic Design Phase
2. Design Development Phase
3. Contract Document Phase
4. Contract Document Phase
5. Construction Phase
6. Architect
7. Certificate of Payment
8. Architect
9. Full-time supervision
10. Per dien and travelling expenses
11. Owner
12. Owner
13. Project Construction Cost
14. Comprehensive planning
15. Environmental planning
16. Full-time supervision
17. Physical Planning
18. Arbitration
19. Cost of Work
20. Contractor
21. Lump Sum Contract
22. Unit price contract
23. Cost plus fixed fee contract
24. Cost and percentage fee of cost
of project
25. Construction manager
26. Project Manager
27. Contractor
28. Request for payment
29. Design by Administration
30. seven percent (7%)
II. F. IDENTIFICATION
1. Owner
2. Working drawings
3. Proposal
4. Install
5. Bid Bulletin
6. Furnish
7. Contractor
8. Material man
9. General condition
10. Work
11. Time Limit
12. Force Majeure
13. Specification
14. Surety
15. Arbitration
16. Liquidated damages
17. Lump-sum
18. Per diem plus reimburseable
expense
19. Subcontractor
20. Contractor
21. Manufacturers
22. six percent (6%)
23. seven percent (7%)
24. ten percent (10%)
25. eight percent (8%)
26. twelve percent (12%)
27. fifteen (15%)
28. Design services or Basic services
29. Pre-design service
30. Contract Time
II. G. IDENTIFICATION
1. Architect
2. Arbitration
3. Architect
4. Contractor
5. Owner
6. Architect
7. Retention
8. Guarantee Bond
9. Instruction to Bidders
10. Bid bond
11. Advertisement/Invitation to Bid
12. Bid bulletin
13. Turnkey
14. Lump sum contract
15. Unit price contract
16. Cost plus fixed fee contract
17. Cost plus percentage fee for cost
of payment
18. Administration Contract
19. Management contract
20. Guaranteed Maximum Plus
participation Savings
21. Contractor
22. Physical Planning
23. seven (7)
24. ten (10)
25. Project Management
26. Project Manger
27. Comprehensive Planning
Services
28. Physical Planning
29. Project Construction Cost
30. Breakdown of Work and
Corresponding Value
III. A. TRUE OR FALSE
1. False (does not include)
2. False (is not required)
3. False (construction phase not
design development phase