do it proper with copper

Post on 14-Jul-2015

66 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

“Do It Proper With Copper”

Video Series

Filming: Day 1

1

Tools and copper fittings for the

video shoot are laid out on the

table.

CDA Project Manager Harold Moret prepares the set for the video shoot.

Harold Moret practices his lines during a run-through of the video shoot.

“Do It Proper With Copper”

Video Series

Filming: Day 2

CDA Project Manager Larry Peters gives Harold Moret advice on the script for the medical gas installation video shoot.

7

Harold Moret organizes the copper tube and fittings prior

to shooting the video.

8

Harold Moret and Ron Gumucio practice their lines while the

camera crew sets up the shot and lighting on set.

9

Harold and Ron go over their lines for the

video shoot prior to filming.

10

The video crew frames the shot in camera.

11

Rolling: Ron asks Harold to explain the various types of

copper tube, pipe and fittings used for different plumbing

applications.

top related