dis projects report hormoz kazemzadeh
Post on 03-Feb-2016
51 Views
Preview:
DESCRIPTION
TRANSCRIPT
© A
BB
Ltd
. -
1 -
DIS Projects ReportHormoz Kazemzadeh
ABB
Annual Users’ Group Meeting
August 27 – 31, 2006
© A
BB
Inc
. -
2 -
Network Manager DMS Projects
Name LocationNo. of
CustomersProduction
Date
Commonwealth Edison Chicago, IL 3,700,000 2004
CPS Energy San Antonio, TX 650,000 2006
Ergon Energy Brisbane, Australia 600,000 2006
Jackson EMC Jackson, GA 190,000 2006
Arizona Public Service (APS) Phoenix, AZ 1,200,000 2007
DTE Energy Detroit, MI 2,200,000 2007
New Hampshire Electric Coop. Plymouth, NH 77,000 2007
© A
BB
Inc
. -
3 -
Network Manager Projects
ComEd Project Highlights Chicago Live as of 5/10 – Now
Live System-Wide
Large Single Database – 2.2M Nodes
Use of CADOPS Remote in Regional Offices
Integration with ABB SCADA
CIM XML Based Interfaces
GIS CIM interface with SmallWorld GIS
© A
BB
Inc
. -
4 -
Network Manager Projects
CPS Energy Project Highlights Parallel Implementation of GIS, Data
Conversion, and OMS in Phase 1 Going Live Next Month ABB Prime for GIS Electric/Land/Gas, Data
Conversion, OMS, GIS Design, and Mobile GIS
Integration between ABB Network Manager DMS, MDSI Advantex, and SAP
ICCP Interface to SCADA netCADOPS Call Entry Screen Embedded
in SAP Network Analysis Applications for Phase 2
(Balanced Load Flow and Fault Location) Plans for Notification and WebMap
Modules
© A
BB
Inc
. -
5 -
Network Manager Projects
APS Project Highlights Phase 1 FAT Starting Next Month
TIBCO Based EAI
ICCP Interface to SCADA
AMI Integration
netCADOPS Call Entry Enhancements
Notification, WebMaps, and Crew Callout
Network Analysis Applications for Phase 2 (RSA, Unbalanced Load Flow, Fault Location, Simulation Mode, Auto-Schematic, Line Unloading, Capacitor Control Integration)
© A
BB
Inc
. -
6 -
Network Manager Projects
DTE Project Highlights FAT near completion
DTE implementing new ESRI GIS in parallel
Not implementing OMS at this point
Integration with ABB SCADA
Integration with Dispatcher Training Simulator
DMS applications (Unbalanced Power Flow, RSA, Line Unloading, Auto-schematic, Fault Location, Simulation Mode, Phase Angle Security Check, Dispatcher Training Simulator)
© A
BB
Inc
. -
7 -
Network Manager Projects
Ergon Energy Project Highlights ABB EMS/DMS Integrated system DMS Pilot / No OMS at this point Split Mode SmallWorld GIS Interface
Jackson EMC Project Highlights Tagging and Referral Enhancement Going live in October ESRI GIS interface
New Hampshire Electric Coop. Project Highlights Starting October ESRI GIS Interface 4 Month Project
© A
BB
Inc
. -
8 -
ABB Project Implementation Approach
Scope of Work (SOW)
Software Task Spec. (STS)
Configuration Guide
As-Is/To-Be Workflows
Code Development
Test & Acceptance Plan
Test Procedure (TPR)
Program Development System (PDS)
Initial Project Team Training
Factory Acceptance Testing (FAT)
Site Acceptance Testing (SAT)
Site System Integration
Cutover/ Rollout
Knowledge Transfer
System Architecture Guide
Define Scope
Detail Requirements
Develop System
Deploy System
Requirements Review
© A
BB
Inc
. -
9 -
Business Process Change Management
Change Management Goals User Acceptance
Realization of Benefits
Process Based Communication/Training/Support
Process Change Management As-Is/To-Be Workflow
Gap Analysis / Impact Analysis
Communication, Training, & Support Project Team / Core Team / SME’s
Super Users (Tier 1 Support)
End Users (Roles Based Security)
top related